Singasandra metro station

Upcoming Namma Metro station under Yellow Line From Wikipedia, the free encyclopedia

Singasandra metro stationmap

Singasandra is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.

Quick Facts General information, Location ...
Singasandra
Namma Metro station
Final stages of this metro station as of April 2024
General information
LocationWellington Paradise, Begur, Bengaluru, Karnataka 560068
Coordinates12.88069°N 77.64498°E / 12.88069; 77.64498
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
ArchitectITD - ITD Cementations India JV
Other information
StatusFinal Stages before Operations
Station code(TBC)
History
OpeningApril 2025; 27 days' time (April 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Kudlu Gate Yellow Line
(Operational around April 2025)
Hosa Road
towards Bommasandra
Location
Close

As per latest reports, the Yellow Line is slated to be operational around April 2025[1] instead of January 2025[2] with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.[3]

History

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Singasandra metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[4] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

Station Layout (TBC)

Singasandra track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Next Station: Hosa Road
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Kudlu Gate
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References