BTM Layout is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.

Quick Facts General information, Location ...
BTM Layout
Namma Metro station
Final stages of construction from Ragigudda - Central Silk Board Flyover
General information
LocationMarenahalli/Outer Ring Road, BTM Layout, Bengaluru, Karnataka 560076
Coordinates12.91656°N 77.60825°E / 12.91656; 77.60825
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
ArchitectHCC - URC Construction JV
Other information
StatusAwaiting trainsets and ready for operations
Station code(TBC)
History
OpeningJuly 2025; 2 months' time (July 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Jayadeva Hospital Yellow Line
(Operational around July 2025)
Central Silk Board
towards Bommasandra
Location
Close

As per latest reports, the Yellow Line is slated to be operational around July 2025[1][2][3] instead of May 2025[4][5][6] which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.

History

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the BTM Layout metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Construction JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[7] Consequently, the contract was successfully awarded to the joint venture, which then commenced construction of the metro station in accordance with the agreements.

Station layout

Station Layout (TBC)

BTM Layout track layout (TBC)
P1
P2
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Next Station: Central Silk Board
Change at the next station for Blue Line
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Jayadeva Hospital
Change at the next station for Pink Line