BTM Layout metro station
Upcoming Namma Metro station under Yellow Line From Wikipedia, the free encyclopedia
BTM Layout is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.
BTM Layout | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||
![]() Final stages of construction from Ragigudda - Central Silk Board Flyover | |||||||||||
General information | |||||||||||
Location | Marenahalli/Outer Ring Road, BTM Layout, Bengaluru, Karnataka 560076 | ||||||||||
Coordinates | 12.91656°N 77.60825°E | ||||||||||
Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | ||||||||||
Operated by | Namma Metro | ||||||||||
Line(s) | Yellow Line | ||||||||||
Platforms | Side platform Platform-1 → Rashtreeya Vidyalaya Road Platform-2 → Delta Electronics - Bommasandra | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated, Double track | ||||||||||
Platform levels | (TBC) | ||||||||||
Parking | (TBC) | ||||||||||
Accessible | (TBC) | ||||||||||
Architect | HCC - URC Construction JV | ||||||||||
Other information | |||||||||||
Status | Awaiting trainsets and ready for operations | ||||||||||
Station code | (TBC) | ||||||||||
History | |||||||||||
Opening | July 2025 | (TBC)||||||||||
Electrified | 750 V DC third rail | ||||||||||
Services | |||||||||||
| |||||||||||
|
As per latest reports, the Yellow Line is slated to be operational around July 2025[1][2][3] instead of May 2025[4][5][6] which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.
History
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the BTM Layout metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Construction JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[7] Consequently, the contract was successfully awarded to the joint venture, which then commenced construction of the metro station in accordance with the agreements.
Station layout
Station Layout (TBC)
BTM Layout track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms ** Under Construction |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left ![]() | |
Platform 2 Southbound |
Towards → Delta Electronics - Bommasandra Next Station: Central Silk Board Change at the next station for Blue Line | |
Platform 1 Northbound |
Towards ← Rashtreeya Vidyalaya Road Next Station: Jayadeva Hospital Change at the next station for Pink Line | |
Side platform | Doors will open on the left ![]() | ||
L2 | ||
Entry/Exits
![]() | This section is empty. You can help by adding to it. (December 2024) |