Bommanahalli metro station

Upcoming Namma Metro station under Yellow Line From Wikipedia, the free encyclopedia

Bommanahalli metro stationmap

Bommanahalli (also known as Roopena Agrahara) is an upcoming elevated metro station on the North–South corridor of the Yellow Line of Namma Metro in Bangalore, India.

Quick Facts General information, Other names ...
Bommanahalli
Namma Metro station
Thumb
Final stages of this metro station as of April 2024
General information
Other namesRoopena Agrahara
LocationRoopena Agrahara, Bommanahalli, Bengaluru, Karnataka 560068
Coordinates12.91066°N 77.62657°E / 12.91066; 77.62657
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
ArchitectITD - ITD Cementation India JV
Other information
StatusAwaiting trainsets and ready for operations
Station code(TBC)
History
OpeningJuly 2025; 55 days' time (July 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Central Silk Board Yellow Line
(Operational around July 2025)
Hongasandra
towards Bommasandra
Location
Thumb
Close

As per latest reports, the Yellow Line is slated to be operational around July 2025[1][2][3] instead of May 2025[4][5][6] which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.

History

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Bommanahalli metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[7] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

Station Layout (TBC)

Bommanahalli track layout (TBC)
P1
P2
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Next Station: Hongasandra
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Central Silk Board
Change at the next station for Blue Line
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.