Rashtreeya Vidyalaya Road is an elevated interchange metro station on the north–south corridor of the Green Line and the east–west corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.[1]
Remove ads
As per latest reports, the Yellow Line is slated to be operational around July 2025[2][3][4] instead of May 2025[5][6][7] which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.
Remove ads
History
Yellow Line
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the terminal metro station (Rashtreeya Vidyalaya Road) along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[8] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
Remove ads
Station layout
Rashtreeya Vidyalaya Road track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms |
Rashtreeya Vidyalaya Road track layout ** | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms ** (Final Stages before Operations) |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left ![]() | |
Platform 2 Southbound |
Towards → Silk Institute Next Station: Banashankari | |
Platform 1 Northbound |
Towards ← Madavara Next Station: Jayanagar | |
Island platform | P1 & P# doors will open on the left ![]() Yellow Line Station Layout & Platform Numbers - (TBC) | ||
Platform # Southbound |
Towards → Delta Electronics - Bommasandra Next Station: Ragigudda | |
Platform # Northbound |
Towards ← Train Terminates Here | |
Side platform | Doors will open on the left ![]() | ||
L2 | ||
Remove ads
Gallery
Some of this metro station pictures are shown below:-
- Platform of this metro station (2020)
- Concourse of this metro station (2024)
- Front Entrance B (2024)
- Green and Yellow Line(s)' Front Entrance building of this metro station
- New metro station along with upcoming Yellow Line
- New Platforms ready for operations under Yellow Line
Entry/Exits
There are 2 Entry/Exit points – A and B. Commuters can use either of the points for their travel.
- Entry/Exit point A: Towards Jayanagar 5th Block side
- Entry/Exit point B: Towards Jayanagar 7th/8th Blocks side with wheelchair accessibility