Biocon Hebbagodi (formerly known as Hebbagodi) is an upcoming elevated metro station on the Yellow Line of the Namma Metro serving the Hebbagodi suburban area of Bengaluru.
Biocon Hebbagodi | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||
![]() Final stages of this metro station as of April 2024 | |||||||||||
General information | |||||||||||
Location | Veerasandra, Hebbagodi, Bommasandra, Karnataka 560099 | ||||||||||
Coordinates | 12.82909°N 77.68133°E | ||||||||||
Owned by | Namma Metro | ||||||||||
Operated by | Bangalore Metro Rail Corporation Ltd (BMRCL) | ||||||||||
Line(s) | Yellow Line | ||||||||||
Platforms | Side platform Platform-1 → Rashtreeya Vidyalaya Road Platform-2 → Delta Electronics - Bommasandra | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated, Double track | ||||||||||
Platform levels | (TBC) | ||||||||||
Parking | (TBC) | ||||||||||
Accessible | (TBC) | ||||||||||
Architect | ITD - ITD Cementation India JV | ||||||||||
Other information | |||||||||||
Status | Final Stages before Operations | ||||||||||
Station code | (TBC) | ||||||||||
History | |||||||||||
Opening | April 2025 | (TBC)||||||||||
Electrified | 750 V DC third rail | ||||||||||
Previous names | Hebbagodi | ||||||||||
Services | |||||||||||
| |||||||||||
|
In 2020, Biocon Group signed an agreement with the Bangalore Metro Rail Corporation Ltd to contribute ₹65 crore towards the construction of the metro station and donated land worth ₹30 crore for the project. Consequently, Biocon obtained the naming rights for the station for 30 years, and the station was renamed from Hebbagodi to Biocon Hebbagodi.[1][2]
This will also be the depot for all the Yellow Line Namma Metro trains for maintenance purposes. As per latest reports, the Yellow Line is slated to be operational around April 2025[3] instead of January 2025[4] with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.[5]
History
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Biocon Hebbagodi metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro. On 25 March 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[6] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
Station layout
Station Layout (TBC)
Biocon Hebbagodi track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left ![]() | |
Platform 2 Southbound |
Towards → Delta Electronics - Bommasandra | |
Platform 1 Northbound |
Towards ← Rashtreeya Vidyalaya Road Next Station: Huskur Road | |
Side platform | Doors will open on the left ![]() | ||
L2 | ||
Entry/Exit
![]() | This section is empty. You can help by adding to it. (December 2024) |
See also
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.