Top Qs
Timeline
Chat
Perspective
2024 in rail transport
From Wikipedia, the free encyclopedia
Remove ads
This article lists events related to rail transport that occurred in 2024.
Events
January
- January 1
– Line 3 of the Cairo Metro extends from Kit-Kat to Rod El-Farag Corridor.[1]
– Campeche–Palenque section of Tren Maya opens to traffic.[2]
– Circular light rail of the Kaohsiung Metro extends from Heart of Love River to Kaisyuan Park and completes the loop line.[3]
– Taiwan Railway Corporation takes over operations of Taiwan Railway from the Taiwan Railways Administration.[4]
– BNSF Railway takes over operations of Montana Rail Link.[5]
January 7 – Bangkok MRT Pink Line opens between Nonthaburi Civic Center and Min Buri.[6]
January 8 – Line 18 and Line 50 of the Krakow tramway network extend from Papierni Prądnickich to Górka Narodowa.[7]
January 13 – Tri-Rail introduces shuttle service between Metrorail Transfer station and MiamiCentral.[8]
January 15 – Jiangnao Railway starts operations between Jiangjunmiao and Baishihu South Station.[9]
- January 20
– Metro Line of Edmonton Light Rail Transit extends from the temporary NAIT station to NAIT/Blatchford Market.[10]
– Rete Ferroviaria Italiana introduces through service between Cirié and Alba and Cirié and Fossano via Line 4 and Line 7 of the Turin Metropolitan Railway Service.[11]
January 24 – Hubei Xincheng Express Line, a suburban train using the existing Wuhan-Huangzhou Intercity Railway, was put into operation.
January 25 – Line 3 and Line 5 of the Daugavpils tramway network extend from Butlerova iela to Stropu ezers.[12]
- January 27
– Line T3 of Tram İzmir opens between Çevre Yolu and Kâtip Çelebi Üniversitesi.[13]
– Phoenix Valley Metro Rail extends from 19th Avenue/Dunlap to Metro Parkway via Northwest Extension Phase II.[14]
January 29 – Line M11 of the Istanbul Metro extends from Kağıthane to Gayrettepe.[15]
January 31 – Line S1 of the Wuxi Metro opens between Jiangyin Bund and Nanfangquan via through service on Line 1.[16]
February
February 3 – Zhuhai-Zhuhai Airport Intercity Railway second phase opens between Zhuhai Changlong to Zhuhai Airport.[17]
February 17 – Yekaturinburg Tramway Network Line 9 extends to Luchistaya Ulitsa from Ulitsa Musorskogo.[18]
- February 24
– Line 1 of the Rio de Janeiro Light Rail extends from Rodoviária to Terminal Intermodal Gentileza.[19]
– Line M1 of the İzmir Metro extends from Fahrettin Altay to Şehitlik.[20]
February 26 – Line T6 of Istanbul Tram opens between Sirkeci and Kazlıçeşme.[21]
February 29 – Tren Maya extends from Cancún Airport to Playa del Carmen.[22]
March
March 4 – Line M1 of the İzmir Metro extends from Şehitlik to Kaymakamlık.[23]
March 5 – Warsaw tramway network extends from Reduta Wolska to Szpital Wolski.[24]
- March 6
– Yellow Line of the Agra Metro opens between Mankameshwar Mandir and Taj East Gate.[25]
– Delhi–Meerut Regional Rapid Transit System extends from Duhai Depot to Modinagar North.[26]
– Line 1 of the Kochi Metro extends from SN Junction to Thrippunithura Terminal.[27]
– Kolkata Metro: Green Line extends via disconnected branch from Howrah Maidan to Esplanade, Purple Line extends from Taratala to Majerhat, and Orange Line opens between Kavi Subhash and Hemanta Mukhopadhyay.[28]
– Aqua Line of the Pune Metro extends from Ruby Hall Clinic to Ramwadi.[29]
March 10 – Line M3 of the Istanbul Metro extends from Kirazlı to Bakırköy Sahil.[30]
March 11 – Circle Line of the Tashkent Metro extends from Quruvchilar to Qipchoq.[31]
- March 16
– Line 4 of the Tehran Metro extends from Allameh Jafari to Ayatollah Kashani.[32]
– Hokuriku: Hokuriku Shinkansen extends from Kanazawa to Tsuruga, IR Ishikawa Railway takes over operations of the Hokuriku Main Line between Kanazawa and Daishōji, and Hapi-Line Fukui takes over operations of the Hokuriku Main Line between Daishōji and Tsuruga.[33]
– E8 Series Shinkansen trains enter service.[34]
– Line M5 of the Istanbul Metro extends from Çekmeköy to Samandıra Merkez.[35]
March 17 – Akçaray extends from Kanalyolu to Şehir Hastanesi.[36]
March 18 – Line M9 of the Istanbul Metro extends from Bahariye to Ataköy.[37]
March 19 – Line M11 of the Istanbul Metro extends from Kargo Terminali to Arnavutköy.[38]
March 23 – Kita-Osaka Kyuko Railway extends from Senri-Chūō to Minō-Kayano.[39]
March 23 – European Sleeper extends to Prague from Berlin.[40]
March 27 – PNR Metro Commuter Line ends service.[41]
- March 28
– Line 6 of Changchun Rail Transit opens between Shuangfeng and Changchun Movie Wonderland.[42]
– Line M1 of Bursaray extends from Emek to Geçit-Balat.[43]
March 29 – New line of the Dnipro City Express opens between Dnipro and Synelnykove.[44]
March 30 – Line A of the Great Train eXpress opens between Suseo and Dongtan.[45]
March 31 – Line 5 of the Nanjing Metro opens between Jiyindadao and Wenjinglu.[46]
April
April 1 – Branch of Line 1 of the Shaoxing Metro opens between Huangjiu Town and Daqingsi.[47]
April 3 – Hellenic Railways reintroduces service between Athens and Thessaloniki.[48]
April 5 – Line T3b of the Île-de-France tramways extends from Marguerite Long to Porte Dauphine.[49]
April 8 – Lusail Tram Pink Line opens between Legtaifiya and Seef Lusail-North.[50]
April 24 – Slovenian Railways start passenger services between Villa Opicina and Rijeka.[51]
April 26 – Line 6 of the Qingdao Metro opens between Lingshan Bay and Hengyunshan Road.[52]
April 27 – 2 Line of Link light rail opens between South Bellevue and Redmond Technology.[53]
April 29 – Mesopotamian Express launches between Ankara and Diyarbakır.[54]
April 30 – Slovenian Railways: New services connect Ljubljana with Pragersko, Maribor, Graz and Villach.[55]
May
May 1 – Line 4 of the Hefei Metro extends via branch from Beiyanhu to Shaomaigang.[56]
May 6 – RER E of the Réseau Express Régional extends from Haussmann–Saint-Lazare to Nanterre–La Folie.[57]
- May 10 – Translink (Northern Ireland) closes Belfast Great Victoria Street railway station.
May 15 – Line 3 of the Cairo Metro extends from Kit-Kat to Cairo University.[58]
May 20 – Services restart between Oslo and Trondheim after reopening of the mainline.[59]
May 21 – Amtrak introduces Borealis daily service between Chicago and St. Paul by extending one Hiawatha round-trip.[60]
May 21 – Talgo AVRIL trains enter service on the AVE network.[61]
May 26 – Pearl River Delta: Foshan–Dongguan intercity railway opens and the southern ring section of the Guangzhou–Foshan circular intercity railway opens.[62]
May 29 – ScotRail reopens Leven-Edinburgh service.[63]
June
June 3 – Pakenham line of the Melbourne rail network extends from Pakenham to East Pakenham.[64]
June 9 – DB Regio Franconia-Thuringia Express expands to Nuremburg.[65]
June 13 – Line 11 of the Paris Métro extends from Mairie des Lilas to Rosny–Bois-Perrier.[66]
June 14 – Tanzania Standard Gauge Railway opens for passenger service between Dar es Salaam and Morogoro.[67]
June 16 – Blackpool Tramway extends to Blackpool North railway station.[68]
June 19 – Line T1 of MetroCentro extends from San Bernardo to Eduardo Dato.[69]
June 22 – M4 of the Copenhagen Metro extends from Copenhagen Central to Copenhagen South.[70]
June 23 – Thomson–East Coast Line of Mass Rapid Transit extends from Gardens by the Bay to Bayshore.[71]
June 24 – Line 14 of the Paris Métro extends from Mairie de Saint-Ouen to Saint-Denis–Pleyel and from Olympiades to Aéroport d'Orly.[72]
- June 28
– Line 1 of the Changsha Metro extends from Kaifu District Government to Jinpenqiu.[73]
– Line 5 of Ningbo Rail Transit extends from Xingzhuang Road to Luotuo Bridge.[74]
– Line D of the Porto Metro extends from Santo Ovídio to Vila d'Este.[75]
June 29 – Line 6 of Suzhou Metro opens between Suzhou Xinqu Railway Station and Sangtiandao.[76]
June 30 – Red Line of the Kaohsiung Metro extends from Kaohsiung Medical University Gangshan Hospital to Gangshan.[77]
July
- July 1
– Line 1 of the Tianjin Metro is extended from Donggulu to Shuangqiaohe.[78]
– Tri-Rail introduces express service between West Palm Beach and MiamiCentral.[79]
July 7 – Line T1 of the Luxembourg tramway extends from Lycée Bouneweg to Stadion.[80]
July 14 – Yanchep line of Transperth extends from Butler to Yanchep.[81]
July 17 – Line 6 of the Naples Metro reopens between Mostra and Mergellina and extends from Mergellina to Municipio.[82]
- July 21
– Amsterdam tramway network line 25 extends to Uithoorn Centrum from Amstelveen Westwijk.[83]
– Service between Bangkok and Vientiane starts operation.[84]
July 22 – Catania Metro extends from Nesima to Monte Po.[85]
August
August 1 – Tanzania Standard Gauge Railway extends passenger rail service from Morogoro to Dodoma.[86]
August 8 – Line 3 of the Hanoi Metro opens between Nhon and Cau Giay.[87]
August 10 – Line 8 of the Seoul Subway extends from Amsa to Byeollae.[88]
August 11 – Caltrain soft launches electrification along the San Francisco Peninsula.[89]
- August 12
August 18 – Delhi–Meerut Regional Rapid Transit System extends from Modinagar North to Meerut South.[93]
August 19 – Metro North West & Bankstown Line of the Sydney Metro extends from Chatswood to Sydenham.[94]
August 20 – Passenger service between Annaba and Tunis restarts after 30 years of suspension.[95]
August 22 – Amtrak truncates Northeast Regional service from Newport News to Newport News Transportation Center.[96]
August 23 – Line 3 of the Foshan Metro extends from Zhen'an to Zhongshan Park and extends via disconnected branch from Lianhe to Foshan University.[97]
August 24 – Line D of the Grenoble tramway network extends from Les-Taillées-Universités to Gares.[98]
August 25 – Port Dock line of the Adelaide Metro opens between Adelaide and Port Dock.[99]
August 28 – Red Line of MAX Light Rail extends from Beaverton Transit Center to Hillsboro Airport/Fairgrounds.[100]
August 29 – Western Railway launches passenger service between Mumbai and Goa.[101]
- August 30
– 1 Line of Link light rail extends from Northgate to Lynnwood City Center via the Lynnwood Link extension.[102]
Mimar Sinan station of the M9 Line is opened.
August 31 – El Insurgente commuter rail extends from Lerma to Santa Fe.[103]
September
September 2 – Services restart between Lugano and Zurich after the reopening of the Gotthard Base Tunnel.[104]
September 5 – Sokolnicheskaya Line of the Moscow Metro extends from Novomoskovskaya to Potapovo.[105]
September 6 – Hangzhou-Wenzhou high speed line is officially inaugurated for service between Hangzhou and Wenzhou.[106]
September 7 – Troitskaya Line of the Moscow Metro opens between Novatorskaya and Tyutchevskaya.[107]
September 10 – Nightjet begins service between Vienna and Rome.[108]
September 10 – Line 8 of Suzhou Metro opens between Xijinqiao and Chefang.[109]
September 11 – Zabok-Krapina railway is modernised.[110]
September 13 – Line FA of Tren Interoceánico opens between Palenque and Coatzacoalcos.[111]
- September 14
– Meizhouxi to Longchuanxi section of the Longyan-Longchuan high speed railway opens.[112]
– Great Western Railway restores service between Oxford and Bristol.[113]
September 15 – Frecciarossa launches service between Naples and Gorizia.[114]
September 16 – Red Line of the Ahmedabad Metro extends from Motera Stadium to Sector-1 and via branch to GIFT City.[115]
September 19 – North Central Railway launches passenger service between Prayagraj and Katra.[116]
September 20 – Tren Maya extends from Playa del Carmen to Felipe Carrillo Puerto.[117]
September 21 – Caltrain begins full electric service between San Francisco and San Jose.[118]
- September 23
– Line 10 of the Brussels tramway network opens between Military Hospital and Churchill.[119]
– Casablanca Tramway: Line T3 opens between Gare de Casa-Port and Hay El Wahda and Line T4 opens between Parc de la Ligue Arabe and Mohammed Erradi.[120]
– Line 2 of the Moscow tramway network opens between 3rd Vladimirskaya Street and Kursky.[121]
September 24 – Tequila Express resumes operations between Guadalajara and Tequila.[122]
September 26 – Xi'an Metro: Line 5 extends from Matengkong to Yanminghu, Line 6 extends from Xi'anguojiyixuezhongxin to Xi'annanzhan, and Line 10 opens between Jingshangcun and Zhaohuiguangchang.[123]
- September 28
– Tianjin Metro: Line 5 extends from Liqizhuangnan to Jinghuadongdao and Jinjing line opens between Jinghuadongdao and Tuanboyixueyuan.[124]
– L Taraval of the Muni Metro resumes service between Wawona and 46th Avenue and Embarcadero.[125]
- September 29
– Line S3 of the Chengdu Metro opens between Futian and Ziyang Bei.[126]
– Chongqing-Kunming high-speed railway opens between Chongqing West and Yibin East.[127]
– Purple Line of the Pune Metro extends from Civil Court to Swargate.[128]
– Copper Line of the San Diego Trolley opens between Santee and El Cajon Transit Center.[129]
October
- October 1
– Line 7 of the Wuhan Metro extends from Hengdian to Huangpi Square.[130]
– Huinong South to Yinchuan section of the Baoyin high-speed railway opens.[131]
October 6 – Tren Maya extends from Nicolás Bravo-Konhunlich to Chetumal.[132]
- October 7
– Line 3 of the Mumbai Metro opens between Aarey Colony and Income Tax Office.[133]
– Egyptian National Railways reintroduces service between Al Ismailia and Bir-al-Abd.[134]
October 11 – Xuancheng–Jixi high-speed railway starts operations between Xuancheng and Jixi County.[135]
October 12 – Line 4 of the Milan Metro extends from San Babila to San Cristoforo.[136]
- October 13 – Translink opens Belfast Grand Central for railway services.[137]
October 15 – Lagos RMT Red Line starts operations between Oyingbo and Agbado.[138]
October 18 – Line U5 of the Stuttgart Stadtbahn extends from Leinfelden Bahnhof to Leinfelden Neuer Markt.[139]
October 21 – Tianjin–Weifang–Yantai high-speed railway starts operations between Weifang North and Yantai South.[140]
- October 29
November
- November 1
2 years after opening the first high-speed railway in Serbia, Novi Sad railway station canopy collapsed, killing 15 people. It had a strong impact on society, bringing Serbian prime minister to resign a few months later.
– Guangzhou Metro Line 3 extends to Haibang from Panyu Square.[143]
– Macau LRT Seac Pai Van Line starts operations between Union Hospital and Seac Pai Van.[144]
– Belarusian Railway starts operations between Minsk and Mazyr.[145]
November 2 – Korail: The Seohae Line extends from Hongseong to Seohwaseong, and the Peotaik Line extends from Sukseong to Anjung.[146]
November 3 – Los Angeles Metro Rail: The C Line is rerouted to the new Aviation/Century station, and the southern section of the K Line between Aviation/Century station and Redondo Beach station opens.[147]
- November 7
– Bashteel railway station opens in Cairo, Egypt.[148]
– Bangalore Metro Green Line extends to Madavara from Nagasandra.[149]
- November 10
– The Trambesòs T4 line of the Barcelona Tram is extended from Glòries to Verdaguer in the first phase of its expansion along Avinguda Diagonal.[150][151]
– Amtrak temporarily combines the Capitol Limited and Silver Star trains into the Floridian train between Chicago and Miami.[152]
- November 16
– LRT Line 1 extends from Baclaran to Dr. Santos as part of the first phase of the Cavite Extension.[153]
– Sanya to Ledong Tourist Railway opened from Sanya to Yazhou.[154]
November 18 – Line T1 of Seville's MetroCentro extends from Eduardo Dato to Luis de Morales.[155]
November 22 – Line 3 of Jinan Metro extends from Tantou to Jichangnan.[156]
November 25 – The Tema-Mpakadan Railway Line opens. It is Ghana's first standard-gauge railway line.[157]
November 26 – Line 3 of Harbin Metro extends from Sports Park to Beima Road, completing the loop.[158]
- November 30
– Line 17 of Shanghai Metro is extended from Oriental Land to Xicen.[159]
– Line 6 of Zhengzhou Metro is extended from Changzhuang to Qinghua Fuzhong.[160]
– Thessaloniki Metro starts operations between New Railway Station and Nea Elvetia.[161]
– Jungbunaeryuk Line extends to Mungyeong from Chungju.[162]
December
- December 1
– Line 7 of the Suzhou Metro starts operations between Muli and Changlou.[163]
– Tallinn Tramway Network Line 2 extends to A-Terminal via the Old City Harbour route.[164]
– Riyadh Metro starts operations, with Line 1, Line 4 and Line 6 open for service.[165][166]
December 2 – Macau LRT Hengqin line opens between Lotus and Hengqin.[167]
December 3 – Line 3 of Xuzhou Metro extends from Gaoxinqu'nan to Yinshan in the south and from Xiadian to Zhenxingdadao in the north.[168]
- December 8
– Transperth Ellenbrook line opens between Bayswater and Ellenbrook.[169]
– Jingmen–Jingzhou high speed railway starts operations.[170]
– Ahmedabad Metro Blue Line extends to Thaltej Gam from Thaltej.[171]
December 10 – North East MRT line is extended to Punggol Coast.[172]
- December 14
– Deutsche Bahn reopens Frankfurt-Mannheim main line after five months closure.[173]
– Daegu Metro Daegyeong Line commences service between Gumi and Gyeongsan.[174]
– The Northumberland Line reopens between Newcastle and Ashington.[175]
- December 15
– Beijing Subway: Line 3 opens between Dongsi Shitiao and Dongbabei, Line 12 opens between Sijiqing Qiao and Dongbabei and Changping line opens between Xitucheng and Jimen Qiao.[176]
– RegioJet takes over Line S49 between Prague and Roztoky.[177]
– Line S4 of the Nuremberg S-Bahn is extended from Dombühl to Crailsheim.[178]
– The Nördlingen–Pleinfeld railway reopens between Gunzenhausen and Wassertrüdingen after service to Nördlingen was suspended in 1985.[179]
– Tren Maya extends from Escárcega to Chetumal.[180]
– Riyadh Metro: Line 2 opens between King Saud University and King Fahad Stadium, Line 5 opens between Ministry of Education and National Museum.[181]
– Bratislava-Kyiv route starts operations.[182]
– Barcelona-Malaga Iryo high speed service starts operations.[183]
– Saltsjöbanan resumes operations on Line 25 and Line 26.[184]
December 16 – Paris-Berlin ICE high speed service commences.[185]
- December 18
– The new Mons railway station enters service.[186]
– Line 2 of the Qingdao Metro extends from Taishan Road to Sichuan Road (Qingdao Ferry Terminal).[187]
– Vinkovci – Vukovar line is electrified between Vinkovci and Vukovar.[188]
- December 19
– Ouigo Train Classique conventional service between Brussels-South and Paris Nord enters operation.[189]
– Chengdu Metro: Line 27 opens between Shifo and Shuxin Road; Line 8 extends north to Guilong Road and south to Longgang.[190]
– Aurora train resumes passenger operations between Moscow and Saint Petersburg.[191]
- December 20
– Parramatta Light Rail starts operations between Westmead and Carlingford, reusing the Carlingford Railway Line.[192]
– Line 1 of the Daegu Metro is extended from Ansim to Hayang.[193]
December 22 – Line 1 of the Ho Chi Minh City Metro starts operations between Bến Thành and Suối Tiên Terminal.[194]
- December 26
– Line 8 of the Hefei Metro starts operations from Beicheng Gaotiezhan to Yilijing.[195]
– Shanghai–Suzhou–Huzhou high-speed railway starts operations.[196]
– Line 8 of the Xi'an Metro starts operations between Shanmenkou and Shengtiyuguan as a loop line.[197]
- December 27
– Airport Link Line of Shanghai Suburban Railway starts operations between Hongqiao Airport Terminal 2 to Pudong Airport Terminal 1 & 2.[198]
– Line 11 of the Wuhan Metro is extended from Wuhandong Railway Station to Jiang'an Road.[199]
– Line 4 of the Saint Petersburg Metro extended from Spasskaya to Gorny Institut.[200]
- December 28
– Line 11 of the Guangzhou Metro starts operations between Longtan and Chisha as a loop line.[201]
– Line S1 of the Guiyang Metro starts operations between Zaojiaoba and Wangchengpo.[202]
– Line 7 of the Nanjing Metro opens its central section between Mufuxilu and Yingtiandajie.[203]
– Shenzhen Metro: Line 3 extends to Pingdi Liulian from Shuanglong; Line 7 extends to SZU Lihu Campus from Xili Lake; Line 11 extends to Hongling South from Gangxia North; Line 12 extends to Songgang from Waterlands Resort East; Line 13 opens between Hi-Tech Central and Shenzhen Bay Checkpoint.[204]
– Line 11 of the Tianjin Metro extended from Dongjiangdao to Shuishanggongyuanxilu.[205]
– Huaixing intercity railway opens from Langfang North to Daxing Airport.[206]
– Guangqing intercity railway extended from Qingcheng to Feixia.[207]
– Troitskaya line of the Moscow Metro extended from Tyutchevskaya to Novomoskovskaya.[208]
– Line A of the Great Train eXpress opens between Seoul Station and Unjeong Center.[209]
December 29 – Zhengzhou Metro: Line 7 opens between Dongzhao and Nangangliu. Line 8 opens between Tianjianhu and Lumiao.[210]
- December 30
– Line 3 of the Minsk Metro extends from Kavaĺskaja Slabada to Slutski Hastsinets.[211]
– Line 3 of the Shenyang Metro starts operations between Nan Liguan and Lida.[212]
– Nanzhu high-speed railway starts operation between Nanning East and Yulin North.[213]
December 31 – Jidayuan high-speed railway opens between Ulanqab and Yuanping West.[214]
Remove ads
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads