Gangxia North station
Metro station in Shenzhen, Guangdong, China From Wikipedia, the free encyclopedia
Metro station in Shenzhen, Guangdong, China From Wikipedia, the free encyclopedia
Gangxia North station is an interchange station for Line 2, Line 10, Line 11 and Line 14 of the Shenzhen Metro. Line 2 platforms opened on 28 June 2011,[1] Line 10, Line 11[2] and Line 14 platforms[3][4] opened on 28 October 2022.[5] Measuring 220,000 meters square, it is 1.6 times as large as the nearby intermodal Futian station.[6] It is the second four-line interchange hub in Shenzhen after Chegongmiao station.
Chinese name | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 崗廈北 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Simplified Chinese | 岗厦北 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | Futian District, Shenzhen, Guangdong China | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 22°32′27″N 114°4′8″E | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operated by | SZMC (Shenzhen Metro Group) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line(s) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 8 (3 island platforms and 2 side platforms) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 8 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
G | - | Exit |
B1F Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs |
B2F Platforms |
Platform 1 | 2 towards Chiwan (Civic Center) |
Island platform, doors will open on the left | ||
Platform 2 | 8 towards Xiaomeisha (Huaqiang North) | |
Platform | 11 towards Bitou (Futian) | |
Island platform, doors of will open on the left for 11 / right for 14 | ||
Platform | 14 termination platform | |
Platform | 14 towards Shatian (Huangmugang) | |
Island platform, doors will open on the right for 14 / left for 11 | ||
Platform | 11 termination platform | |
B3F Platforms |
Side platform, doors will open on the right | |
Platform | 10 towards Futian Checkpoint (Gangxia) | |
Platform | 10 towards Shuangyong Street (Lianhuacun) | |
Side platform, doors will open on the right | ||
Note: Exit 2 - Exit 6, Exit 8 - Exit 11, Exit 13 - Exit 15 are not open.
Exit[5] | Destination |
---|---|
Exit 1 | Shenzhen Central Garden, Tianjian Century Garden, Yasongju, Shenzhen Contemporary Art And Urban Planning |
Exit 7 | Xinghe Century Building, Zhuoyue Center, Jindi Center, Bank of China Building, Zhongzhou building |
Exit 12 | Greater China International Trading Center, Fuhua New Village, Shenda New Village, Futian Middle School, Shenzhen International Culture Building, Gangxia Village, Jialin Haoting, Caitian Mingyuan, Wenwei Building |
Exit 16 | North side of Shennan Boulevard, The First Vocational Technical School of Shenzhen, International Innovation Center, Postal Savings Bank of China, Futian District Administrative Service Hall |
Exit 18 | North side of Shennan Boulevard, Caitian Road, Hongjia Hotel, CGN Building, Pingan International Hotel, Huarun Wanjia, Phoenix Mansion |
Exit 19 | Fujian Building, Tianmian New Village, Tianmian City Building, Green Oasis School, Fuli Garden, The First Vocational Technical School of Shenzhen (Futian Campus), Caidecheng, Fujing Building, International Talent Building, Futian Science and Technology Plaza, Caixia Pavilion, Zhenye Garden, Fulian Garden, Changfu Garden |
On 7 July 2018, during the construction of the Line 10 part of the station, four electric cables were broken, leading to a massive power cut at the nearby buildings. The broken cables were repaired six days later.[7][8]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.