The Shenyang Metro is a rapid transit system part of the urban rail transit system of Shenyang, Liaoning, China. It currently covers 9 of the 10 municipal districts in Shenyang City (except Liaozhong District). Shenyang is the seventh city in Mainland China with an underground subway. In history, Shenyang's earliest written subway planning can be traced back to 1940 during the Manchurian period.[3] After the founding of the People's Republic of China, due to some reasons, Shenyang Metro has been set up many times, and the construction has been suspended several times. The construction of the Shenyang Metro, which is currently in operation, began in 2005 and has been in operation since September 27, 2010. As of January 2025, Shenyang Metro has a total of 6 operating lines with a total length of 186.7 kilometers and 136 operating stations. In 2020, the annual passenger traffic was 310 million, with an average daily passenger flow of 849,000. Shenyang Metro is operated and built by Shenyang Metro Group Co., Ltd.

Quick Facts Simplified Chinese, Traditional Chinese ...
Close
Quick Facts Overview, Native name ...
Shenyang Metro
Thumb
Overview
Native name沈阳地铁
LocaleShenyang, China
Transit typeRapid transit
Number of lines6
Number of stations124
Daily ridership1.072 million (2021 daily)[1]
391 million (2021 annual)[1]
Websitehttp://www.symtc.com/
Operation
Began operation27 September 2010; 14 years ago (2010-09-27)
Technical
System length188 km (117 mi)[2]
System map

Thumb

Close

Overview

Summarize
Perspective

The Shenyang Metro consists of Line 1 (east-west), opened on September 27, 2010, with 27.8 km (17.3 mi) of track and 22 stations, and Line 2 (north-south), opened on January 9, 2012, with 27.16 km (16.88 mi) of track and 22 stations. Line 9 opened on May 25, 2019. The line is 28.996 km (18.017 mi) in length. Line 10 opened on April 29, 2020.[4]

The construction of Line 1 started on November 18, 2005. Trial service not open to the public started in September 2009, with the line fully operational in September 2010.[5] The total cost of Line 1 was 8.88 billion yuan (USD 1.1 billion).

The construction on Line 2 started on November 18, 2006, with 19 stations and 19.3 km (12.0 mi) and became operational on January 9, 2012.[6]

A Line 2 extension to Hangkonghangtiandaxue station opened on December 30, 2013. Another extension to Putianlu station opened on April 8, 2018.[7]

The original loop line is broken into two L-shaped lines, Line 9 and Line 10, that intersect twice to form a loop. Line 9 opened on May 25, 2019. The line is 28.996 km (18.017 mi) in length. Line 10 opened on April 29, 2020.[4] Line 4 opened on September 29, 2023.[8] The western part of Line 3 opened on 30 December 2024.

Lines

Thumb
Shenyang Metro
More information Line, Terminals (District) ...
Line Terminals
(District)
Commencement Newest
Extension
Length
km
Stations
 1  Shisanhaojie
(Tiexi)
Limingguangchang
(Dadong)
2010 27.8 22
 2  Putianlu
(Shenbei)
Taoxianjichang
(Hunnan)
2012 2023 45.58 33
 3  Lida
(Tiexi)
Nanliguan
(Yuhong)
2024 23 14
 4  Zhengxinlu
(Dadong)
Chuangxinlu
(Hunnan)
2023 34.112[9] 23
 9  Nujianggongyuan
(Huanggu / Yuhong)
Jianzhudaxue
(Hunnan)
2019 28.996 23
 10  Dingxianghu
(Yuhong)
Zhangshabu
(Hunnan)
2020 27.2 21
Total 186.7 136
Close

History

Summarize
Perspective
Thumb
Street entrance of Qingniandajie station

Shenyang was one of the first Chinese cities with a metro plan. The initial plan of building a metro system in Shenyang was proposed as early as 1940, during the Manchukuo era with an Osaka-based company proposing a 52-kilometre (32 mi) metro network.[10][11] However, chaos caused by the Second Sino-Japanese War and Chinese Civil Wars meant the plan was not implemented.[12]

After the wars, the metro program was revived again when the Chinese government decided that the four biggest cities at that time, Beijing, Shanghai, Tianjin and Shenyang should build metro systems for transportation and military purposes. The subway was envisioned to also function as an air raid shelter in an event of war.[12]

Construction in of the metro started in 1965 but was stopped shortly after due to the turmoil from the Cultural Revolution. Only the initial sections of the Beijing Subway and Tianjin Metro managed to be completed. Construction was restarted in 1974, on a line following today's Line 1. In 1978 government personnel from Harbin, Tianjin and Shanghai visited Shenyang to learn about the subway construction experience.[13]

In 1982, subway construction was halted due to lack of funds and resources. The approximately 3 km (1.9 mi) long half completed tunnel was abandoned and filled with water.[13] While the Shanghai Metro was put into service in 1995, the economic decline of Shenyang during the 1980s-1990s meant that there was no capital available for subway construction and the program was continually postponed.

A light rail system was designed in the early 1990s as a cheaper alternative, however this plan was also abandoned after a national suspension of subway projects was declared due to worries of high cost and financial debt.[14]

Shenyang's economy revived in 2000, and with it growing traffic congestion and pollution caused by the expanding urban population. This prompted the Chinese central government to approve the subway proposal on November 8, 2005.[15][16] Construction of the first phase of Line 1 started on November 18, 2005, with the entire phase opened on September 27, 2010, after trial operation in September 2009.[16] The line have 22 stations and went from Shisanhaojie to Limingguangchang station. Line 2 started trail operation on December 30, 2011[17] and was fully opened on January 9, 2012. Line 2 extended three times in 2013 , 2018 and 2023, currently has 33 stations, connecting the downtown Shenyang and Taoxian Airport. Line 9 opened on May 25, 2019. Line 10 opened on April 29, 2020. Line 4 opened on September 29, 2023.[4][18] The western part of Line 3 opened on 30 December 2024.

Future development

There are five lines/extensions under construction.

More information Planned opening, Route ...
Planned opening Route Terminals Length (km) Stations Status
2025  1  (Eastern extension) Limingguangchang Shuangma[19] 16.5[20] 10[20] Under construction[21]
2026  6  (eastern part) Nanlinguan Fangjialan 18.27 13[22]
 6  (Phase 1) Yalujiangbeijie[19] Shaliulu[19] 27[23] 23[23] Under construction[24]
2028  9  (Eastern extension) Jianzhudaxue Shimiaozi[25] 7.7 5 Under construction[25]
2029  10  (Southern extension) Zhangshabu Dingxiangjie[25] 24.5 16 Under construction[25]
Close

Network map

Thumb