Gundavali metro station

Mumbai Metro's Red Line 7 terminal metro station From Wikipedia, the free encyclopedia

Gundavali metro stationmap

Gundavali is the elevated southern terminal metro station on the North-South corridor of the Red Line 7 of Mumbai Metro in Mumbai, India. This metro station was inaugurated on 20 January 2023 by Prime Minister Narendra Modi. [1][2][3]

Quick Facts General information, Location ...
Gundavali
Mumbai Metro station
General information
LocationAndheri East, Mumbai, Maharashtra 400053
Coordinates19°06′54″N 72°51′19″E
Owned byMumbai Metropolitan Region Development Authority (MMRDA)
Operated byMaha Mumbai Metro Operation Corporation Limited (MMMOCL)
Line(s)Line 7
Platforms2 (2 side platform)
Tracks2
Connections
Construction
Structure typeElevated, Double track
Platform levels2
ParkingNo
AccessibleYes
History
Opened20 January 2023; 2 years ago (2023-01-20)
Services
Preceding station Mumbai Metro Following station
Mogra
towards Ovaripada
Line 7 Terminus
Out-of-system interchange
Preceding station Mumbai Metro One Following station
Andheri
towards Versova
Line 1 Chakala (J.B.Nagar)
towards Ghatkopar
Location
Close

Gundavali is connected to the Western Express Highway station on Line 1 through a 58 metre long foot overbridge.[4]

Station layout

G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Northbound
Towards → Ovari Pada next station is Mogra
Platform 1
Southbound
Towards ← Train Terminates Here
Side platform | Doors will open on the left Disabled access
L2

Power and signaling system

Like all other stations and railways of Mumbai metro, Gundavali station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

Entry/Exits

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.