Rashtriya Udyan metro station

Mumbai Metro's Red Line 7 metro station From Wikipedia, the free encyclopedia

Rashtriya Udyan metro stationmap

Rashtriya Udyan is an elevated metro station on the north–south corridor of the Red Line 7 of Mumbai Metro in Mumbai, India. This metro station was inaugurated on 2 April 2022 by Prime Minister Narendra Modi.[1][2][3]

Quick Facts General information, Location ...
Rashtriya Udyan
Mumbai Metro station
General information
LocationSBI Colony, Daulat Nagar, Borivali, Mumbai, Maharashtra 400066
Coordinates19°14′05″N 72°51′47″E
Owned byMumbai Metropolitan Region Development Authority (MMRDA)
Operated byMaha Mumbai Metro Operation Corporation Limited (MMMOCL)
Line(s)Line 7
Platforms2 (2 side platform)
Tracks2
Construction
Structure typeElevated, Double track
ParkingNo
AccessibleYes
History
Opened2 April 2022; 3 years ago (2022-04-02)
Services
Preceding station Mumbai Metro Following station
Ovaripada
Terminus
Line 7 Devipada
towards Gundavali
Location
Close

Station layout

G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Northbound
Towards → Ovari Pada
Platform 1
Southbound
Towards ← Gundavali next station is Devi Pada
Side platform | Doors will open on the left Disabled access
L2

Power and signaling system

Like all other stations and railways of Mumbai metro, Rashtriya Udyan station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

Entry/Exits

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.