Kadubeesanahalli metro station

Upcoming Namma Metro station under Blue Line From Wikipedia, the free encyclopedia

Kadubeesanahalli metro stationmap

Embassy TechVillage Kadubeesanahalli (formerly known as Kadubeesanahalli) is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station serves mainly Embassy TechnoVillage, which comprises IT companies such J.P. Morgan Chase, Cisco, Wells Fargo, New Horizon College of Engineering and Sakra World Hospital. This is a prime location for its neighbouring areas like Bellandur, Marathahalli, Ibbalur and HAL Aerospace Museum. This metro station is slated to become operational around June 2026.[2][3][4][5]

Quick Facts Embassy TechVillage Kadubeesanahalli, General information ...
Embassy TechVillage Kadubeesanahalli
Namma Metro station
Thumb
Under Construction of this metro station as of April 2025 under Phase 2A of Blue Line of Namma Metro
General information
LocationKadubeesanahalli, Bengaluru, Karnataka 560103
Coordinates12.93225°N 77.68761°E / 12.93225; 77.68761
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsSide platform (TBC)
Platform-1 → Central Silk Board
Platform-2 → Krishnarajapura / KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station codeKDBH (TBC)
History
OpeningJune 2026; 12 months' time (June 2026) (TBC)
Electrified(TBC)
Previous namesKadubeesanahalli
Services
Preceding station Namma Metro Following station
Bellandur Blue Line
(Future Service)
Kodibeesanahalli
Location
Thumb
Close

On February 28 2025, Embassy Group (REIT) had signed a definitive agreement for the construction of this metro station under Blue Line of Namma Metro and registered its rights for 30 years subject to the approval from the State Government. This is the fourth metro station after KIAL Terminals (MoU with BIAL), Bettahalasuru (MoU with Embassy Group) and DRDO Sports Complex (MoU with Bagmane Tech Park).[6][7]

History

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Embassy TechVillage Kadubeesanahalli metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board - Kodibeesanahalli) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Afcons Infrastructure was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [8] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

Station Layout - To Be Confirmed

More information Embassy TechVillageKadubeesanahalli track layout (TBC) ...
Embassy TechVillage
Kadubeesanahalli track layout (TBC)
P#
P#
Station with two tracks and two side platforms
Close
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Krishnarajapura / KIAL Terminals
Next Station: Kodibeesanahalli
Platform #
Southbound
Towards ← Central Silk Board
Next Station: Bellandur
Side platform | Doors will open on the left Disabled access
L2

Connections

Entry/Exit

See also

References