Top Qs
Timeline
Chat
Perspective

Ambala–Chandigarh Expressway

Road in India From Wikipedia, the free encyclopedia

Remove ads

Ambala Chandigarh Expressway is four-lane 35 km long,[1] high-traffic density corridor of Ambala-Chandigarh section (km 5.735 to km 39.960 on NH-152 and 0 km to 0.871 km on NH 5) on BOT basis, was completed in 30 months at a cost of 2.98 billion (US$35 million)[2] The expressway has been operational since December 2009 and was constructed by the GMR Group with assistance from the World Bank.

Quick facts Route information, Length ...

38 km south of Ambala at existing NH152 (Ambala-Pehowa-Narwana-Fatehabad-Sirsa), it connects with the controlled access tolled Ambala–Narnaul Expressway (Trans-Haryana Expressway).

Remove ads

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads