![cover image](https://wikiwandv2-19431.kxcdn.com/_next/image?url=https://upload.wikimedia.org/wikipedia/commons/thumb/1/14/%25E6%2588%2590%25E9%2583%25BD%25E5%259C%25B0%25E9%2590%25B518%25E8%2599%259F%25E7%25B6%25AB%25E5%2588%2597%25E8%25BB%258A.jpg/640px-%25E6%2588%2590%25E9%2583%25BD%25E5%259C%25B0%25E9%2590%25B518%25E8%2599%259F%25E7%25B6%25AB%25E5%2588%2597%25E8%25BB%258A.jpg&w=640&q=50)
Line 18 (Chengdu Metro)
Airport rail link of the Chengdu Metro / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Line 18 (Chengdu Metro)?
Summarize this article for a 10 year old
Line 18 of the Chengdu Metro (simplified Chinese: 成都地铁18号线; traditional Chinese: 成都地鐵18號線; pinyin: Chéngdū Dìtiě Shíbā Hào Xiàn) is an express rapid transit line that connects the urban area of Chengdu with Chengdu Tianfu International Airport. Line 18's color is teal. The Phase 1 & 2 of Line 18 is in total 69.39 km in length.[2] It is also the biggest PPP[clarification needed] project in China.[3] The section from South Railway Station to Tianfu International Airport North Station started operation on 18 December 2020.[1]
Line 18 | |
---|---|
18 | |
![]() | |
Overview | |
Status | In operation |
Owner | Chengdu Rail Transit |
Locale | Chengdu, Sichuan |
Termini |
|
Stations | 12 (in operation) 18 (future) |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Operator(s) | Chengdu Rail Transit Corporation |
Rolling stock | 8-car Type A |
History | |
Opened | 27 September 2020; 3 years ago (2020-09-27) (South Railway Station—Sancha)[1] |
Technical | |
Line length | 69.39 km (43.1 mi)[2] |
Number of tracks | 2 main tracks |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | AC 25 kV, Overhead line |
Operating speed | 140 km/h (Designed 160 km/h) |
Between Chengdu South Railway Station and Western China International Expo City Station, the line runs adjacent to Line 1 essentially forming a four track subway. Line 18 runs express between the two stations, skipping a number of stops that Line 1 makes. The four track alignment with Line 1 will be extended to North Railway Station once Phase 3 of the line is completed.