Line 18 of the Chengdu Metro (simplified Chinese: 成都地铁18号线; traditional Chinese: 成都地鐵18號線; pinyin: Chéngdū Dìtiě Shíbā Hào Xiàn) is an express rapid transit line that connects the urban area of Chengdu with Chengdu Tianfu International Airport. Line 18's color is teal. The Phase 1 & 2 of Line 18 is in total 69.39 km in length.[2] It is also the biggest PPP[clarification needed] project in China.[3] The section from South Railway Station to Tianfu International Airport North Station started operation on 18 December 2020.[1]

Quick Facts Overview, Status ...
Line 18
18
Thumb
Overview
StatusIn operation
OwnerChengdu Rail Transit
LocaleChengdu, Sichuan
Termini
Stations12 (in operation)
18 (future)
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Rail Transit Corporation
Rolling stock8-car Type A
History
Opened27 September 2020; 4 years ago (2020-09-27) (South Railway Station—Sancha)[1]
Technical
Line length69.39 km (43.1 mi)[2]
Number of tracks2 main tracks
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationAC 25 kV, Overhead line
Operating speed140 km/h (Designed 160 km/h)
Close

Between Chengdu South Railway Station and Western China International Expo City Station, the line runs adjacent to Line 1 essentially forming a four track subway. Line 18 runs express between the two stations, skipping a number of stops that Line 1 makes. The four track alignment with Line 1 will be extended to North Railway Station once Phase 3 of the line is completed.

Description

Summarize
Perspective

Phase 1 & 2

Phase 1 and 2 of the line, which is currently in operation, start at Chengdu South Railway Station and end at Chengdu Tianfu International Airport. The total length is 69.39 km (43.12 mi).[2]

The line officially started construction on August 16, 2016.[4] The section from South Railway Station to Sancha started operation on 27 September 2020.[1] The line will use 8-car Type A rolling stock. The rolling stock have features designed for medium distance travel, such as a 140 km/h maximum speed and wide station spacing.[5]

The line will also feature distinct express and local services using passing tracks at select stations with an express service stopping only at 4 intermediate stations,[6] and planned to complete a trip between Chengdu South Railway Station to Chengdu Tianfu International Airport in 35 minutes. The local service will stop at all stations on Line 18 and will complete the trip in 40 to 50 minutes.[7]

Phase 3

On December 9, 2019, the Department of Ecology and Environment of Sichuan Province approved new extensions for Line 18. Line 18 Phase 3 includes North Extension, Linjiang Section, and South Extension. It is 16.715 kilometers long, all underground. In total, 6 underground stations (4 transfer stations), 1 reserved station, and 1 new depot will be built.[8]

North Section

Line 18 is planned to extend north to North Railway Station on Line 1 serving downtown Chengdu and providing full parallel express service along the core portion of Line 1. The length of the extension is 10.985 kilometers with 4 new stations.[9]

South Section

Line 18 is also planned to extend south beyond Tianfu International Airport Terminals 1 & 2 Station to Guanyan,[10] adding 5.75 kilometers and 2 new underground stations and Linjiang Depot.[8] On June 18, 2020, the Government of Chengdu changed the name of Linjiang Station to Guanyan Station.[10]

Phase 4

Jianyang Housing and Urban Planning Bureau officially released the plan for Line 18 Phase 4 to be extended to Jianyang South Railway Station.[11]

Additionally, Line 18 will connect with the proposed Line S3 (Ziyang line) at Futian Station.[12][11][13] Line S3 (Ziyang line) is currently undergoing geological investigation in central Ziyang.

History

  • On July 11, 2016, the NDRC approved the third phase of expansion for the Chengdu Metro, which includes Line 18.[14]
  • On August 16, 2016, Line 18 started construction.[15]
  • On February 28, 2017, first tunnel machine started tunneling.[16]
  • On June 27, 2017, Sichuan Development and Reform Commission approved phase 2.[17]
  • On August 18, 2017, the first station: Xinglong Station finished roofing and construction.[18]
  • On October 24, 2018, Futian - T3/T4 section finished tunnel construction.
  • On January 29, 2019, Phase 1 and Phase 2 finished viaduct construction.[19]
  • On May 31, 2019, the first tunnel section was completed.[19]
  • On June 2, 2019, all tunnels in Phase 1 and Phase 2 are connected.
  • On June 13, 2019, Line 18's first train started testing in Chengdu.
  • On June 1, 2020, systems testing and debugging began.[19]
  • On June 2, 2020, Line 18, the biggest PPP[clarification needed] project in China, started its 3-month trial operation in preparation for opening.[3]
  • On August 6, 2020, Line 18 completed fire-prevention assessment.[20]
  • On September 27, 2020, the first and second section (from South Railway Station to Sancha) of Line 18 was opened.
  • On December 18, 2020, Line 18 Sancha (excluding) to Tianfu International Airport North was opened.
  • On June 27, 2021, an infill station, Terminal 1 & 2 of Tianfu International Airport station opened with Chengdu Tianfu International Airport.
  • In December 2022, Chengdu Metro's deepest, and also first 4-line transfer station: Luomashi, finished digging. Line 18 Phase 1's platform is 45.5M deep, with North Railway Station ~ Luomashi 's deepest tunnel at 48.8M, equivalent to 16-floors underground. Luomashi has Line 1, Line 4, Line 10, and Line 18.[21]
  • On 26 March 2023, Line 18 has increased express service from 6 to 16 trains, to match the increasing needs for Chengdu Tianfu International Airport and daily commuters. Line 18 also increased 58 trains daily (36 trains for Airport Express Service).[22][23]
  • On 1 June 2023, express service has restructured to be through train services, no longer stop at Incubation Park, Haichang Road and Sancha.[24]
  • On 13 August 2023, Futian station opened service.[25]
  • On 28 November 2023, with start of line 19 phase 2 operation and interchange-only open of Tianfu Station, two cross-line through services have introduced, one stop at each stations of line 19 and stations of line 18 east of Tianfu Station, another "directly through" service, 6 times to-and-fro per a day, from Jinxing to Terminal 1 & 2 of Tianfu International Airport.[26]

Stations

Summarize
Perspective
More information Service routes, Station No. ...
Service
routes[6]
Station

No.

Station name Transfer Distance
km
Location
Local Through English Chinese
1801 North Railway Station 火车北站 1 7
Chengdu railway station Chengdu
Jinniu
1802 Luomashi 骡马市 1 4  10  Qingyang
1803 Sichuan Gymnasium 省体育馆 1 3 Wuhou
1804 Nijiaqiao 倪家桥 1 8
1805 South Railway Station 火车南站 1 7
Chengdu South railway station Chengdu South
- 0 Wuhou (South High-Tech Zone)
1806 Incubation Park 孵化园 1 9 3.003 3.003
1807 Jincheng Plaza East 锦城广场东 0.943 3.946
1808 Century City 世纪城 1 1.514 5.460
1809 Haichang Road 海昌路 1 6.884 12.344 Shuangliu (Tianfu New Area)
1810 Western China Int'l Expo City 西博城 1 6 7.533 19.877
1811 Xinglong 兴隆 3.914 23.791
1812 Tianfu Station[note 1] 天府站 19
China Railway Tianfu (U/C)
5.237 29.028
Through-service to/from Jinxing of Line 19
direct through service to/from East of Terminal 2 of Shuangliu International Airport of Line 19
1813 Sancha 三岔 19.161 48.189 Jianyang (East New Area)
1814 Futian 福田 S3[12][11][13] 7.985 56.174
1815 Terminal 3 & 4 of Tianfu International Airport (reserved station) 天府机场3号4号航站楼 Chengdu Tianfu International Airport TFU 9.176
1816 Terminal 1 & 2 of Tianfu International Airport 天府机场1号2号航站楼 Chengdu Tianfu International Airport TFU 65.350
1817 Tianfu International Airport North 天府机场北[10] 2.596 67.946
1818 Guanyan 官堰[10]
1819 Jianyang South Railway Station 简阳南站[11]
Close

See also

Notes

  1. Only interchange service available, no entrances and exits at the moment.

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.