Line 9 (Chengdu Metro)

Metro line in Chengdu, China From Wikipedia, the free encyclopedia

Line 9 (Chengdu Metro)

Chengdu Metro Line 9 (simplified Chinese: 成都地铁9号线; traditional Chinese: 成都地鐵9號線) is located in Chengdu, Sichuan and forms an extension to the existing Chengdu Metro system. The line officially opened on 18 December 2020.[3]

Quick Facts Overview, Status ...
Line 9
9
Thumb
Line 9 platform at Huaxing station
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations13
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Metro Corporation
Depot(s)Yuanhua Depot (元华停车场)
Wuqing Depot (武青车辆段)
Rolling stock8-car Type A (Driverless)
History
Opened18 December 2020; 4 years ago (2020-12-18)
Technical
Line length22.18 km (13.8 mi)[1] (current)
43.9 km (in 2024)
Number of tracks2
CharacterUnderground and elevated
Electrificationoverhead lines, 1,500 V DC
Operating speed140km/h [2]
Close

Line 9 Phase I runs from Financial City East to Huangtianba and is envisioned to be the second loop line in Chengdu (after Line 7) in the future. Line 9's color is bright orange.[4]

It is the first ever fully automated ATO GoA 4 metro line in Chengdu.[5]

Line 9 uses high capacity Type A 8-car trains.[6] The 13 stations were designed by London-based Sepanta in collaboration with Chinese architect Jiang & Associates Design.[7]

Progress

  • On July 11, 2016, the NDRC approved the third phase of expansion for the Chengdu Metro consisting of Line 6 phase 2 and 3, Line 8, Line 9, Line 10 Phase 2, Line 17 Phase 1 and Line 18.[8]
  • 2016-12-29, Sichuan and the Sichuan Development and Reform Commission approved and officially agreed to construct Line 1 Phase 1.[9] The first 4 stations started construction on the same day.[10]
  • 2017-11-10, Line 9's first tunnel machine started work at Yuanhua Depot connection.[11]
  • 2018-3-17, Line 9's first section (Yuanhua Depot connection) finished tunnel work
  • 2018-11-29, Line 9 started track-laying.
  • 2019-01-22, first train is finished at CRRC Changchun Railway Vehicles.[12]
  • On July 18, 2019, the Wuqing Power Centre project is completed.[13]
  • 2019-07-30, Line 9 finished all tunnel work.
  • 2020-01-14, as the last section of track is installed between Sanyuan and Jincheng Avenue Stations, completing track installation of Line 9 Phase I.[14]
  • 2020-06-10, Chengdu Metro started 3-month trial operation for Line 9 and Line 17.[15]

Stations

More information Station №, Station name ...
Station

Station name Transfer Distance
km
Location
English Chinese
0901 Financial City East 金融城东 6 -- 0.000 Jinjiang
0902 Xindao 心岛 1.257 1.257 Wuhou
0903 Incubation Park 孵化园 1 18 0.645 1.902
0904 Jincheng Avenue 锦城大道 5 1.557 3.459
0905 Sanyuan 三元 8 2.532 5.991
0906 Taiping Temple 太平寺 1.794 7.785
0907 Huaxing 华兴 10 1.442 9.227
0908 Cuqiao 簇桥 1.616 10.843
0909 Wuqing South Road 武青南路 3 1.702 12.545
0910 Jitouqiao 机投桥 17 2.766 15.311
0911 Peifeng 培风  13  1.671 16.982
0912 Chengdu West Railway Station 成都西站 4Chengdu West railway station CMW

Chengdu Tram  T2 

2.640 19.622 Qingyang
0913 Huangtianba 黄田坝 1.826 21.448