Line 10 (Chengdu Metro)

Metro line in Chengdu, China From Wikipedia, the free encyclopedia

Line 10 (Chengdu Metro)

Line 10 of the Chengdu Metro (simplified Chinese: 成都地铁10号线; traditional Chinese: 成都地鐵10號線; pinyin: Chéngdū Dìtiě Shí Hào Xiàn) runs from Taipingyuan in Wuhou to Xinping in Xinjin. Currently, the line is 37.972 km (23.6 mi) long.[2][3] In 2024, the line will be 43.9 km long with the 5.9 km northeastern extension (Phase 3) to People's Park.[4]

Quick Facts Overview, Status ...
Line 10
10
Thumb
A Line 10 train entering at Huangshui station
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations16
Service
TypeRapid transit
SystemChengdu Metro
Services2
Operator(s)Chengdu Metro Corporation
Daily ridership106,800 (2018 Peak)[1]
History
Opened6 September 2017; 7 years ago (2017-09-06)
Technical
Line length37.972 km (23.6 mi)[2][3] (current)
43.9 km (in 2024)
Number of tracks2
Characterunderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrificationoverhead lines, 1,500 V DC
Route map

extension to
People's Park
(
under
construction
)
Taipingyuan 3 7
Cujin
Huaxing 9
Jinhua underground depot
Jinhua
Shuangliu Inter-
national Airport
Banqiao depot
Shuangliu West Railway Station 3
Yingtian Temple
Huangshui
Huayuan
Xinjin Railway Station
Huaqiao
Wujin
Rulin Road
Liujianian
Xinping (Baodun)
Xinping depot
Close

Phase I of Line 10 began construction in July 2014 and opened in September 2017. Phase II began construction in 2016[5] and opened on December 27, 2019.[6] It is the first line in Chengdu Metro to use 6-car Type A rolling stock for service.

Line 10's color is sky blue.[7]

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Taipingyuan — Shuangliu International Airport Terminal 2 6 September 2017 10.937 km (6.8 mi)[2] 6 Phase 1
Shuangliu International Airport Terminal 2 — Xinping 27 December 2019 27.035 km (16.8 mi)[3] 10 Phase 2
Close

Stations

Summarize
Perspective
More information Service routes, Station No. ...
Service

routes

Station

No.

Station name Transfer Distance
km
Location
English Chinese
1001 Luomashi 骡马市 1 4  18  Qingyang
1002 People's Park 人民公园 2  17 
1003 Wenwengshishi 文翁石室  13 
1004 Wuhouci 武侯祠 Wuhou
1005 Gaoshengqiao 高升桥 3 5
1006 Hongpailou 红牌楼 3
1007 Taipingyuan 太平园 3 7 0.00 0.00
1008 Cujin 簇锦 1.980 1.980
1009 Huaxing 华兴 9 1.584 3.564
1010 Jinhua 金花 3.575 7.139
1011 Shuangliu International Airport Terminal 1 双流机场1航站楼 Chengdu Shuangliu International Airport CTU 1.837 8.976 Shuangliu
1012 Shuangliu International Airport Terminal 2 双流机场2航站楼 19  30 [note 1]
Chengdu Shuangliu International Airport CTU Shuangliu Airport railway station IPW
1.001 9.977
1013 Shuangliu West Station 双流西站 3
Shuangliu West railway station Shuangliu West (IQW)
Chenggui HSR
5.099 15.076
1014 Yingtian Temple 应天寺 1.494 16.570
1015 Huangshui 黄水 2.346 18.916
1016 Huayuan 花源 3.671 22.587 Xinjin
1017 Xinjin Station 新津站 Xinjin railway station Xinjin (IRW)
Chenggui HSR
2.597 25.184
1018 Huaqiao 花桥 2.824 28.008
1019 Wujin 五津 5.019 33.027
1020 Rulin Road 儒林路 1.250 34.277
1021 Liujianian 刘家碾 1.220 35.497
1022 Xinping (Baodun) 新平(宝墩) 1.252 36.749
Close

Notes

  1. Out-of-system interchange via East of Terminal 2 of Shuangliu International Airport

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.