The Moscow International Business Center (MIBC),[lower-alpha 1] also known as Moscow-City[lower-alpha 2] and Moskva-City,[1] is a commercial development in Moscow, the capital of Russia. The project occupies an area of 60 hectares,[2] and is located just east of the Third Ring Road at the western edge of the Presnensky District in the Central Administrative Okrug. Construction of the MIBC takes place on the Presnenskaya Embankment of the Moskva River, approximately 4 kilometers (2.5 mi) west of Red Square.
This article needs to be updated. (April 2021) |
Moscow International Business Center | |
---|---|
Московский международный деловой центр Moskovskiy mezhdunarodnyy delovoy tsentr | |
Alternative names | Moscow-City |
General information | |
Status | Under construction |
Architectural style | Postmodernism |
Location | Presnensky District, Moscow |
Country | Russia |
Coordinates | 55°44′48″N 37°32′13″E |
Construction started | 1995 |
Completed | After 2030 |
Other information | |
Public transit access | Moscow Metro: Mezhdunarodnaya Vystavochnaya Delovoy Tsentr Delovoy Tsentr Delovoy Tsentr Moscow Central Diameters: Testovskaya Testovskaya Aeroexpress (to Sheremetyevo airport): Testovskaya |
Website | |
www |
The complex is home to the highest numbers of skyscrapers in Europe. The Government of Moscow first conceived the project in 1992, as a mixed development of office, residential, retail and entertainment facilities.[3] An estimated 250,000 – 300,000 people will be working in, living in, or visiting the complex at any given time.[2] By 2016, twelve of the twenty-three planned facilities of the MIBC were already built; seven buildings were under construction; and four were in the design stage.[4]
Before construction began, the area was a stone quarry and industrial zone, where most of the buildings were old factories that had been closed or abandoned. A public company, CITY, was created in 1992, to oversee the initial creation and development of Moscow City as well as its subsequent usage. CITY is also a general contractor and both landlord and lessor. Overall responsibility for the architectural planning and design of Moscow City belongs to the architectural studio No. 6, which is a part of the large Moscow practice Mosproject-2 named after Mikhail Vasilyevich Posokhin. This group, headed by Gennady Lvovich Sirota, who is officially the Chief Architect of Moskva-Citi, is in charge of overseeing the design of the complex as a whole and agreeing the details of individual projects. Each building lot has its own investor and architect. By 2014, the volume of investments in Moskva-City was approximately $12 billion.[5]
Established in the spring of 1992, the PJSC City Company manages the creation and development of the MIBC. On 30 December 1994, the Government of Moscow authorized PJSC City to act as the managing company for the MIBC and to negotiate with third parties to help develop the MIBC. As of February 2014, the company was owned by the Solvers Group, led by Oleg Malis.[6][7]
Completed | Topped out | Under construction | On hold | Project | Unknown |
Roof height, max height, and floors apply to the tallest building of the respective complex. Completion of construction applies to the building in each complex completed last.
Plot number | Name | Started | Completed | Cost in Rubles (₽) | Buildings in Complex | Roof height, m | Max height, m | Floors | Total area, m² | Notes |
---|---|---|---|---|---|---|---|---|---|---|
0 | Tower 2000 and Bagration Bridge | 1996 | 2001 | 1 | 104 | 104 | 34 | 61,057 | [3][8] | |
Palitra Business Center | 2025 | 2030 | 1 | 398 | 398 | 80 | ≈196,000 | Projected highrise building on the left riverbank | ||
1 | One Tower | 2019 | 2025-2030 | 49,000,000,000 ₽ | 1 | 442 | 442 | 110 | 281,608 | Once completed, it will be the tallest building in Moscow.[9][10] |
2 | Evolution Tower | 2011 | 2014 | 15,278,640,000 ₽ | 1 | 246 | 246 | 55 | 169,000 | [11][12][13] |
3 | ||||||||||
4 | Imperia Tower | 2006 | 2018 | 9,207,600,000 ₽ | 2 | 239 | 239 | 59 | 287,723 | Construction of Tower 2. Foundation work.[14][15][16][17] |
5 | Expocentre | 1977 | 1978 | 8 | 15 | 15 | 10 | 165,000 | ||
6 | Central Core - Cinema-Concert Hall | 2005 | 2016 | 1 | [18][19][20] | |||||
7 | Center Core - AfiMall-Moscow Metro | 2011 | 1 | 50 | 50 | 10 | 283,182 | |||
8 | Center Core - Hotel Novotel Moscow City | 2012 | 4,525,440,000 ₽ | 1 | 55 | 55 | 10 | 52,116 | ||
9 | City of Capitals | 2005 | 2009 | 73,641,000,000 ₽ | 3 | 302[21] | 302 | 76 | 288,680 | [22] |
10 | Naberezhnaya Tower | 2003 | 2007 | 6,138,400,000 ₽ | 3 | 268[23] | 268 | 59 | 254,000 | [24][25][26][27][28] |
11 | IQ-quarter | 2008 | 2017 | 9,941,200,000 ₽ | 3 | 169[29] | 169 | 42 | 228,000 | [30][31][32][33] |
12 | Eurasia Tower | 2007 | 2015 | 6,395,250,000 ₽ | 1 | 309 | 309 | 70 | 207,542 | [34][35] |
13 | Federation Tower | 2003 | 2017 | 36,830,400,000 ₽ | 2 | 374[36] | 374 | 101 | 439,154 | Vostok/East Tower is currently the tallest building in Moscow. |
14 | Mercury City Tower | 2009 | 2013 | 31,740,000,000 ₽ | 1 | 339 | 339 | 75 | 158,528 | [37][38][39][40] |
15 | Grand Tower | 2013 | 2024 | 1 | 283 | 283 | 62 | 400,000 | Construction was put on hold in 2013 and resumed in 2019.[41] | |
16 | OKO | 2011 | 2015 | 35,258,400,000 ₽ | 3 | 354 | 354 | 85 | 249,000 | [42][43][44][45][46][47] |
17 | Neva Towers | 2013 | 2020 | 31,837,000,000 ₽ | 2 | 345 | 345 | 79 | 357,000 | [48][49][50] |
18 | ||||||||||
19 | Northern Tower | 2005 | 2007 | 1 | 108 | 132 | 27 | 135,000 | ||
20 | Multifunctional Complex on site 20 | 1 | 60 | 179,600 | ||||||
21 | Dom Dau | 2023 | 2027 | 1 | 340 | 340 | 87 | 143,000 |
The Bagration Bridge is a pedestrian bridge that goes over the Moskva River. It connects Tower 2000 and the rest of the MIBC complex.
Major thoroughfares that connect to the MIBC are the Third Ring Road, 3rd Magistralnaya street, and the Presnenskaya Embankment.
To correspond with the growing MIBC, new highways and interchanges were built to connect the MIBC with the main transport arteries of the city. These projects include the ten-lane Dorogomilovsky Bridge of the Third Ring Road over the Moskva River, the Third Ring Road interchange with Kutuzovsky Avenue, and the extension of the Presnenskaya Embankment. Existing roads were reconstructed and rearranged.
The MIBC is served by three metro lines, and four stations. Two of the stations are named Delovoy Tsentr (Russian for "business center"). Vystavochnaya (formerly also known as Delovoy Tsentr) and Mezhdunarodnaya are on the Filyovskaya line. The first Delovoy Tsentr is on Kalininsko-Solntsevskaya line since 2014, but was closed from early 2018 to late 2020. The second Delovoy Tsentr station is served by a branch of the Bolshaya Koltsevaya line which is expected to be transferred to the Rublyovo-Arkhangelskaya line, currently under construction.
The MIBC in addition is served by the Moscow Central Circle urban rail, with a station also named Delovoy Tsentr which opened in 2016. The Testovskaya station, part of the D4 line of the Moscow Central Diameters, began serving the MIBC in September 2023. Another station named Testovskaya, north of the MIBC, is served by the D1 and the Aeroexpress. The main platforms of the station were closed for reconstruction in October 2023, and temporary wooden platforms are currently in use.[51]
There are also plans to install a high-speed rail system between the MIBC and Sheremetyevo International Airport.[citation needed]
There were a total of 7 incidents that occurred in the Moscow International Business Center, most of them related to fires.