Bolshaya Koltsevaya line

Moscow Metro line From Wikipedia, the free encyclopedia

Bolshaya Koltsevaya line

The Bolshaya Koltsevaya line (Russian: Большая кольцевая линия) (English: Big Circle Line[3]) (Line 11[4]) is a rapid transit line of the Moscow Metro. It is the third circle line on the system, running outside of the existing circle Koltsevaya line and interlocking with the Moscow Central Circle.

Quick Facts Overview, Other name(s) ...
 Bolshaya Koltsevaya line
Geographic map showing the approximate path of the Bolshaya Koltsevaya line (in teal) in the whole Moscow Metro network (in dark grey) including Central Circle, MCD and Monorail
Overview
Other name(s)Large Circle Line
Native nameБольшая Кольцевая линия
LocaleMoscow
Stations29
Service
TypeRapid transit
SystemMoscow Metro
Operator(s)Moskovsky Metropoliten
Rolling stock81-775/776/777
History
Opened11 August 1969 (Kakhovskaya line stations)
26 February 2018 (Bolshaya Koltsevaya stations)
1 March 2023 (circle completed)
Technical
Line length57.538 km (35.752 mi)[1][2]
CharacterUnderground
Track gauge1,520 mm (4 ft 11+2732 in)
ElectrificationThird rail
Route map

Savyolovskaya
Petrovsky Park
CSKA
Khoroshyovskaya
Narodnoye Opolcheniye
()
Mnyovniki
Terekhovo
Kuntsevskaya
Davydkovo
Aminyevskoye yard
Aminyevskaya
Michurinsky Prospekt
Prospekt Vernadskogo
Novatorskaya
Vorontsovskaya
Zyuzino
Kakhovskaya
Zamoskvoretskoye yard
Varshavskaya
Kashirskaya
Klenovy Bulvar
()
Nagatinsky Zaton
Pechatniki
Tekstilshchiki
Nizhegorodskaya
Nizhegorodskoye yard
Aviamotornaya
Lefortovo
Elektrozavodskaya
Sokolniki
Rizhskaya
Maryina Roshcha
Close

The first section of the line opened on 26 February 2018 with the remaining stations opened on 1 March 2023.[5] The line includes 29 stations, including three from the former Kakhovskaya line, and is 57.5 km (35.7 mi) long, which makes it the longest metro circle line in the world, surpassing Line 10 of Beijing Subway by 514 m (1,686 ft).[6] In November 2017 the city estimated the total cost of the project at 501 billion rubles, up from earlier estimates of 378.9 billion rubles.[7]

Formerly known as the Third Interchange Contour, the city adopted "Bolshaya koltsevaya liniya" as the official name of the line after a vote via the "Active Citizen" web portal.[8]

Name

The working name of the project since inception was the Third Interchange Contour; however, prior to the opening of the line, the city authorities consulted residents to help decide on the name. In an initial survey on the Active Citizen survey website in October 2017, only 34% of the city’s residents voted to keep the working name.[9]

Although retaining the working name was the most popular option, members of the city’s council on transportation infrastructure suggested another vote. Two reasons cited by transport expert Kirill Yankov were that all of the lines’ names to this point were in the feminine grammatical gender and that all the other line names were generally understood from a point of view of geography.[10] The city held another vote on its website to allow citizens to choose between the existing name or the Bolshaya Koltsevaya line (Large Circle Line). Of the alternate names suggested by voters in the first vote, Bolshaya Koltsevaya was the most popular, with 9,000 votes.

In the second vote, Bolshaya Koltsevaya Line was selected with 53.3% of the votes versus 36.5% for the Third Interchange Contour.[8]

Development

Summarize
Perspective
Thumb
Initial construction timetable for the Bolshaya Koltsevaya line

The original plans called for a line that is 58 kilometres (36 mi) with 27 new stations.[11]

The entire project was supposed to be completed by 2020–2021.[12][13][14][15][16] By 2018, the completion date had been postponed until 2023.[17]

First sections

Thumb
First section with a temporal branch with five stations from Delovoy Tsentr to Petrovsky Park.
Video of stations of first section on the first day of operation

The five stations from Petrovsky Park to Delovoy Tsentr opened on 26 February 2018.[18] Savyolovskaya was opened on 30 December 2018.

Further extension

The northeastern section was initially scheduled to be completed in 2018, but was delayed for two years until it was opened on 27 March 2020 and 31 December 2020. On 1 April 2021, the section between Khoroshyovskaya and Mnyovniki was opened. This section includes the part of the line from Elektrozavodskaya to Nizhegorodskaya.[19] The existing, short, three-station Kakhovskaya line was incorporated into the line. Kakhovskaya was reopened on 7 December 2021 after reconstruction within the segment to Mnyovniki. The sections from Savyolovskaya to Elektrozavodskaya and from Kakhovskaya to Nizhegorodskaya opened on 1 March 2023.

Stations

More information Station Name, Transfers ...
Station Name Transfers Notes
English Russian
↑ Loop line towards Maryina Roshcha ↑
Savyolovskaya Савёловскаяpronunciation Transfer for #9 Serpukhovsko-Timiryazevskaya line at Savyolovskaya Savyolovskaya
#D1 Line D1 (Moscow Central Diameters) Transfer for #D4 Line D4 (Moscow Central Diameters) at Moscow Savyolovskaya Moscow Savyolovskaya
Petrovsky Park Петровский паркpronunciation Transfer for #2 Zamoskvoretskaya line at Dinamo Dinamo
CSKA ЦСКАpronunciation
Khoroshyovskaya Хорошёвскаяpronunciation Transfer for #7 Tagansko-Krasnopresnenskaya line at Polezhayevskaya Polezhayevskaya
Transfer for #14 Moscow Central Circle at Khoroshyovo Khoroshyovo
Through service to Transfer for #11A Bolshaya Koltsevaya line at Delovoy Tsentr Delovoy Tsentr via branch line
Narodnoye Opolcheniye Народное Ополчениеpronunciation #17 Rublyovo-Arkhangelskaya line Narodnoye Opolcheniye
Mnyovniki Мнёвникиpronunciation
Terekhovo Тереховоpronunciation
Kuntsevskaya Кунцевскаяpronunciation #3 Arbatsko-Pokrovskaya line Transfer for #4 Filyovskaya line at Kuntsevskaya Kuntsevskaya
#D1 Line D1 (Moscow Central Diameters) Kuntsevskaya
Davydkovo Давыдковоpronunciation
Aminyevskaya Аминьевскаяpronunciation #D4 Line D4 (Moscow Central Diameters) Aminyevskaya
Michurinsky Prospekt Мичуринский проспектpronunciation Transfer for #8A Solntsevskaya line at Michurinsky Prospekt Michurinsky Prospekt
Prospekt Vernadskogo Проспект Вернадскогоpronunciation Transfer for #1 Sokolnicheskaya line at Prospekt Vernadskogo Prospekt Vernadskogo
Novatorskaya Новаторскаяpronunciation Transfer for #16 Troitskaya line at Novatorskaya Novatorskaya
Vorontsovskaya Воронцовскаяpronunciation Transfer for #6 Kaluzhsko-Rizhskaya line at Kaluzhskaya Kaluzhskaya
Zyuzino Зюзиноpronunciation
Kakhovskaya Каховскаяpronunciation Transfer for #9 Serpukhovsko-Timiryazevskaya line at Sevastopolskaya Sevastopolskaya
Varshavskaya Варшавскаяpronunciation
Kashirskaya Каширскаяpronunciation Transfer for #2 Zamoskvoretskaya line at Kashirskaya Kashirskaya
Klenovy Bulvar Кленовый бульварpronunciation #18 Biryulyovskaya line Klenovy Bulvar
Nagatinsky Zaton Нагатинский Затонpronunciation
Pechatniki Печатникиpronunciation Transfer for #10 Lyublinsko-Dmitrovskaya line at Pechatniki Pechatniki
Transfer for #D2 Line D2 (Moscow Central Diameters) at Pechatniki Pechatniki
Tekstilshchiki Текстильщикиpronunciation Transfer for #7 Tagansko-Krasnopresnenskaya line at Tekstilshchiki Tekstilshchiki
#D2 Line D2 (Moscow Central Diameters) Tekstilshchiki
Nizhegorodskaya Нижегородскаяpronunciation Transfer for #15 Nekrasovskaya line at Nizhegorodskaya Nizhegorodskaya
Transfer for #14 Moscow Central Circle at Nizhegorodskaya Nizhegorodskaya
Transfer for #D4 Line D4 (Moscow Central Diameters) at Nizhegorodskaya Nizhegorodskaya
Through service to Transfer for #15 Nekrasovskaya line at Nekrasovka Nekrasovka
Aviamotornaya Авиамоторнаяpronunciation Transfer for #8 Kalininskaya line at Aviamotornaya Aviamotornaya
#D3 Line D3 (Moscow Central Diameters) Aviamotornaya
Lefortovo Лефортовоpronunciation
Elektrozavodskaya Электрозаводскаяpronunciation Transfer for #3 Arbatsko-Pokrovskaya line at Elektrozavodskaya Elektrozavodskaya
Transfer for #D3 Line D3 (Moscow Central Diameters) at Elektrozavodskaya
Sokolniki Сокольникиpronunciation Transfer for #1 Sokolnicheskaya line at Sokolniki Sokolniki
#D3 Line D3 (Moscow Central Diameters) Mitkovo
Rizhskaya Рижскаяpronunciation Transfer for #6 Kaluzhsko-Rizhskaya line at Rizhskaya Rizhskaya
Transfer for #D2 Line D2 (Moscow Central Diameters) at Rizhskaya Rizhskaya
Maryina Roshcha Марьина Рощаpronunciation Transfer for #10 Lyublinsko-Dmitrovskaya line at Maryina Roshcha Maryina Roshcha
#D2 Line D2 (Moscow Central Diameters) #D4 Line D4 (Moscow Central Diameters) Maryina Roshcha
↓ Loop line towards Savyolovskaya
Close

Rolling stock

Subway car types used on the line over the years:

More information Type, Dates ...
TypeDates
Series 81-760/7612018 - 2021
Series 81-760А/761А/763А2018 - 2021
Series 81-765.3/766.3/767.32018 - 2021, 2023
Series 81-765.4/766.4/767.42019 - 2021, 2023
Series 81-765/766/7672020 - 2021, 2023
Series 81-775/776/7772021—present
Close

Maps

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.