Sealdah–Bangaon line

Railway Route in West Bengal, India From Wikipedia, the free encyclopedia

Sealdah–Bangaon line

The Sealdah–Bangaon line is a 78 km (48 mi) long broad gauge railway line that connects the Sealdah railway station of Kolkata with Bangaon of North 24 Parganas in the Indian state of West Bengal. Once a part of the old CalcuttaJessoreKhulna line, today it is a busy suburban section of the Kolkata Suburban Railway. It is under the jurisdiction of the Sealdah railway division of the Eastern Railway zone of Indian Railways.[1][2]

Quick Facts Overview, Status ...
Sealdah–Bangaon line
Overview
StatusOperational
OwnerIndian Railways
LocaleWest Bengal
Termini
Stations52
WebsiteEastern Railway
Service
TypeCommuter rail
SystemKolkata Suburban Railway
Services
Operator(s)Eastern Railway
Depot(s)
  1. Barasat EMU Car Shed
  2. Ranaghat EMU Car Shed
History
Opened1882; 143 years ago (1882)
Technical
Line length78 km (48 mi)
Number of tracks2
CharacterAt-grade
Track gauge1,676 mm (5 ft 6 in) broad gauge
Electrification25 kV overhead line
Operating speedup to 100 kmph
Route map

Sealdah–Bangaon line
km
km
86
Benapole (
Benapole
land port
)
Bagdah
26
Chandabazar
12
82
Petrapole
Chhoighoria
6
Naobhanga Khal
line planned
78
0
Bangaon Junction
Ranaghat–Bangaon line
20
Poramaheshtala (planned)
Satberia Halt
5
Gopalnagar
5
Akaipur Halt
10
Majhergram
13
Gangnapur
18
Naba Raynagar
23
Coopers Halt
25
Ranaghat EMU Carshed
Churni Ghat
30
89
Hingalganj
Ranaghat Junction
28
Katakhali river
line planned
72
Hasnabad
70
Taki Road
67
Nimdanri
66
Madhyampur
Bibhutibhusan Halt
73
64
Matania Anantapur
Chandpara
68
61
Basirhat
Thakurnagar
64
60
Bhyabla
Gobardanga
58
55
Champapukur
52
Ghora Ras Ghona
(planned) Swarupnagar
70
Bidyadhari Khal
Machhalandapur
55
50
Malatipur
Sanhati
50
46
Kankra Mirzanagar
Habra
45
42
Harua Road
Ashoknagar Road
42
39
Bhasila
Guma
38
37
Lebutala
(planned) Chakla
47
Bidyadhari Khal
Bira
35
34
Beliaghata Road
Dattapukur
31
35
Sondalia
Bamangachhi
27
33
Bahira Kalibari
29
Karea Kadambagachi
Barasat EMU Carshed
26
Kazipara
Barasat Junction
23
Barasat
Hridaypur
21
Hridaypur
Madhyamgram
19
Madhyamgram
Noai Khal
New Barrackpore
New Barrackpur
17
Michael Nagar
Bisharpara Kodaliya
16
Birati
Birati
14
Biman Bandar
 KM Orange Line  (u/c)
Durganagar
13
Biman Bandar
15
Jessore Road
13
Jessore Road
line dismantled
Dum Dum Cantonment
11
Dum Dum Cantonment
 KM Yellow Line  (u/c)
Dum Dum Junction
8
Patipukur loop
line (dismantled)
Belgachia
10
Patipukur
Ultadanga Road
11
Lansdown mill siding
Kolkata
12
Brown Blanket mill siding
Kestopur Canal
Bidhan Nagar Road
5
Bidhannagar Road
Press House siding
Kankurgachi Road
2
Kankurgachi Road Junction
Narkeldanga
EMU Carshed
3
Sir Gurudas Banerjee Halt
Circular Canal
Kankurgachi
Chord line
Sealdah North
0
0
Sealdah Main
Sealdah
Sealdah South
0
Beliaghata Diesel Loco Shed
6
Kamardanga Halt
Beruck & Comens Siding
3│7
Park Circus
km
km
Key
Indian Railways broad gauge (1676 mm)
Kolkata Metro (KM) broad gauge (1676 mm)
Kolkata Metro (KM) standard gauge (1435 mm)
in use
out of use, planned, or
under construction (u/c)
tunnel
Close

The Sealdah-Bangaon line splits at Barasat, creating a branch, the branch goes towards Hasnabad, while another Single-track railway branch connects Ranaghat from Bangaon. The 53 km (33 mi) long Barasat–Hasnabad branch line provides connectivity to much of the Basirhat subdivision of the North 24 Parganas district.

  • Barasat-Hasnabad Branch line
Quick Facts Barasat-Hasnabad branch line, Overview ...
Barasat-Hasnabad branch line
Overview
StatusOperational
OwnerIndian Railways
LocaleWest Bengal
Termini
Stations20
WebsiteEastern Railway
Service
TypeCommuter rail
SystemKolkata Suburban Railway
ServicesSealdah-Hasnabad via Barasat
Operator(s)Eastern Railway
Depot(s)
  1. Barasat EMU depot
History
Opened1962; 63 years ago (1962)
Technical
Line length52 km (32 mi)
Number of tracks
  • 1\2
  1. Barasat-Champapukur (0-35km): 2 tracks
  2. Champapukur-Hasnabad (35-52km): 1 track
CharacterAt-grade
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification25 kV overhead line
Operating speedup to 100 km/h (62 mph)
Close

While the 28 km (17 mi) long Ranaghat–Bangaon branch line connects the main line with the Ranaghat Junction on the Sealdah–Ranaghat section.[1][2]

  • Ranaghat–Bangaon branch line
Quick Facts Ranaghat–Bangaon branch line, Overview ...
Ranaghat–Bangaon branch line
Overview
StatusOperational
OwnerIndian Railways
LocaleWest Bengal
Termini
Stations9
WebsiteEastern Railway
Service
TypeCommuter rail
SystemKolkata Suburban Railway
Operator(s)Eastern Railway
Depot(s)
  1. Ranaghat EMU Carshed
History
Opened1882; 143 years ago (1882)
Technical
Line length32 km (20 mi)
Number of tracksSingle-track railway
CharacterAt-grade
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification25 kV overhead line
Operating speedup to 100 km/h (62 mph)
Close

Services

Summarize
Perspective

The line was a part of the old Calcutta–Jessore–Khulna line with trains such as the Barisal Express running through it. Today however it is primarily a suburban section with a total of 138 daily and 112 Sunday EMU services serving the Sealdah–Bangaon section.[3] A further 31 EMU services between Bangaon and Ranaghat junctions, and 2 EMU services, between Bangaon and Shantipur junctions, run via the Ranaghat–Bangaon branch line.[3] The Barasat–Hasnabad branch line is served by a total of 46 daily and 38 Sunday EMU services.[3] Majority of the services are provided by 9-car and 12-car EMU rakes from the Barasat EMU Carshed.[4] Few services in the Ranaghat–Bangaon line are provided by 12-car EMU rakes from the Ranaghat EMU Carshed as well.[4]

Petrapole railway station serves as a major international transit point for freight and, recently, passengers to Bangladesh with the Benapole railway station serving as its Bangladeshi counterpart.[5][6] The Benapole land port, the largest land port of Bangladesh, is directly served by this line along with the roadways at the Benapole Border Crossing and accounts for more than 90% of the imported Indian goods into Bangladesh.[7][8] Major freight commodities handled by this section are foodgrains, fuel, medical oxygen, stone and gypsum amongst others.[6]

On 9 November 2017, a bi-weekly international service from Kolkata to Khulna called the Bandhan Express was started by the Indian and Bangladeshi governments.[9] The train initially had stoppages only at Kolkata, Petrapole, Benapole and Khulna with Petrapole and Benapole serving as border checkpoints. However, due to popular demand a new three minute stoppage was added at Jessore Junction railway station on 7 March 2019.[10]

The line has an interchange station at Dum Dum Junction with the Blue Line of the Kolkata Metro and the Sealdah Main and North section.[11] Completion of construction and opening of the Yellow Line of Kolkata Metro is expected provide four more interchange stations at Dum Dum Cantonment, Madhyamgram, Hridaypur and Barasat Junction.[12][13][14]

History

Summarize
Perspective

Pre-partition (1882-1947)

Bengal Central Railway

The Bengal Central Railway company (reporting mark :BCR) was formed in 1881 to build and operate a 5 ft 6 in (1,676 mm) broad gauge railway line from Sealdah to Khulna via Jessore with a branch from Bangaon to Ranaghat.[15][16]

It constructed the two broad gauge lines: one connecting Ranaghat and Bangaon (21 miles (34 km)) in 1882 and the other connecting Dum Dum with Khulna (now in Bangladesh), via Bangaon (108 miles (174 km)) which opened in stages and was completed in 1884. These lines were merged with Eastern Bengal Railway in 1904.[16]

Eastern Bengal Railway

With the takeover of BCR, the Calcutta–Bangaon–Jessore–Khulna line became the main line of the Central section of Eastern Bengal Railway (reporting mark :EBR).[17][18] The Patipukur Loop line from Dum Dum Cantonment to Patipukur was opened on 1904 as well.[17] In 1942, EBR was merged with the Assam Bengal Railway (reporting mark :ABR) to form the Bengal and Assam Railway (reporting mark :B&AR).[1]

Barasat–Basirhat Light Railway

The Barasat–Basirhat Light Railway (reporting mark :BBLR) was a 26 miles (42 km) long 2 ft 6 in (762 mm) narrow gauge railway that was constructed by the Martin's Light Railways company in 1905 between Barasat and Basirhat. It was further extended via Taki to Hasnabad (Chingrighata) in 1909. A 16.62 miles (26.75 km) long extension was built from Beliaghata Bridge on the Barasat–Basirhat line to Patipukur in 1910. This was further extended to Belgachia in 1914 and was known as the Shyambazar Branch.[18][19]

Post-partition (1947-)

Eastern Railway

Following the partition of India in 1947, the Calcutta–Khulna line was divided into two parts and the Petrapole railway station became the terminus on the Indian side while the Benapole railway station became the terminus in the Bangladeshi side of the line. The Calcutta (now Sealdah)–Bangaon–Petrapole section came under the jurisdiction of the Sealdah division of the Eastern Railway zone of the Indian Railways while the Benapole–Jessore–Khulna section came under the jurisdiction of the Eastern Bengal Railway (renamed as Pakistan Eastern Railway on 1961[20]) of the then East Pakistan.[21]

The Barisal Express, launched in 1884, from Calcutta to Khulna continued post-partition until rail services between the two countries were suspended due to the Indo-Pakistani War of 1965.[21] Following the liberation of Bangladesh, freight services between the two countries were restored for a brief period of two years in 1972 but closed again due to a lack of goods.[22] India and Bangladesh signed an agreement in July 2000 to resume freight services and the first freight train ran across the link on 21 January 2001.[22] The Bandhan Express, a weekly service, was introduced on this line in November 2017. It traces the old route of the Barisal Express except for having its terminus in the Kolkata railway station instead of Sealdah railway station.[23]

The Barasat–Basirhat Light Railway (reporting mark :BBLR) closed down in 1955 due to continuous losses.[24] The Barasat-Hasnabad section of the BBLR was converted into a 5 ft 6 in (1,676 mm) broad gauge and was built in a new alignment between 1957 and 1962 becoming the Barasat–Hasnabad branch line. The Shyambazar branch of the BBLR was abandoned.[25][26]

The Dum Dum Cantonment–Biman Bandar branch line was built by the Eastern Railway and was inaugurated in July 2006. Due to losses and poor patronage owing to the location of the station and odd timings of the services, the services on the line were closed down in 2016. The line was further dismantled in 2020 to make way for the Yellow Line.[27]

Numbering series details

There are some pattern in numbering in local trains of Sealdah Bangaon section.

  • 332** series :- Hasnabad - Dumdum - Barrackpore Local and Barrackpore - Dumdum - Gobardanga Local
  • 333** series :- Train originate from Barasat like all Barasat Hasnabad Local and Barasat Bangaon Local( UP and DN)
  • 334** series :- Sealdah Madhyamgram Local and Sealdah Barasat Local (UP and DN)
  • 335** series :- Sealdah - Hasnabad Local ( UP and DN)
  • 336** series :- Sealdah Duttapukur Local (3362* sub series) , Sealdah Habra Local (3366* sub series) and Sealdah Gobardanga Local ( 3368* sub series) ( UP and DN)
  • 337** series :- Ranaghat - Bangaon - Ranaghat Local
  • 338** series :- Sealdah - Bangaon - Sealdah Local

Tracks and Electrification

The Sealdah–Barasat–Bangaon section is a double line section whereas the Ranaghat–Bangaon–Petrapole–Benapole section is a single line section.[3] In the Barasat–Hasnabad branch line, the Barasat–Sondalia and Lebutala–Champapukur sections are double lined whereas the Champapukur–Hasnabad section is a single line section.[3] The doubling of the Sondalia–Lebutala section of the line is currently under progress.[28]

All the lines in the section are fully electrified with 25 kV AC overhead system. The Sealdah–Bangaon line was electrified in 1963–64, while the Barasat–Hasnabad branch line was electrified in 2002-03 [29]

EMU Car shed

Summarize
Perspective

The lines are primarily served by 9-car and 12-car EMU rakes from the Barasat EMU Carshed.[4] Few services in the Ranaghat–Bangaon line are provided by 12-car EMU rakes from the Ranaghat EMU Carshed as well.[4]

While the section was initially served by the Narkeldanga EMU carshed which opened on 1963, due to the increasing traffic requirements in the Sealdah–Bangaon section and the electrified Barasat–Hasnabad and Ranaghat–Bangaon sections led to the commissioning of the Barasat EMU Carshed in 1990.[4] In 2018, three phase IGBT based 12-car EMU rakes were introduced in this carshed.[4] As of January 2022, the shed contains 8 9-car EMU rakes and 25 12-car EMU rakes, 6 of which are three phase IGBT based.[4]

Similar increase in traffic requirements in the Ranaghat–Gede, Ranaghat–Bangaon, Ranaghat–Shantipur–Krishnanagar City and Ranaghat–Lalgola sections led to the commissioning of the Ranaghat EMU carshed in 2007.[4] As of January 2022, the car shed contains 15 12-car EMU rakes and 6 MEMU rakes of which one is an 8-car rake while the rest are 12-car rakes. Three of the 12-car MEMU rakes are three phase IGBT based rakes.[4]

Nowadays, 3 phase emu is running on tracks. Narkeldanga EMU Carshed has 2 nos 12Car 3phase Alstom rakes and RHA has 5 rakes and BT has 10 nos of 3 phase rakes which are in service in this line. In BNJ, 6 rakes are night stabled and other trains shed in their respective Carshed.[citation needed]

Routes and stations

Stations

Names in bold indicate that the station is a major stop or an important interchange/terminal station.

Sealdah–Barasat–Bangaon line

More information #, Distance from Sealdah Main and North (km) ...
Sealdah–Barasat–Bangaon line
# Distance from Sealdah Main and North (km) Station Name Station Code Connections Station Category[30]
1 0 Sealdah Main and North SDAH Sealdah South section NSG-1
2 2 Kankurgachi Road Junction KGK Circular line HG-3
3 5 Bidhannagar Road BNXR SG-2
4 8 Dum Dum Junction DDJ Sealdah–Ranaghat–Gede line /Calcutta Chord link line / Kolkata Metro Blue Line (Dum Dum metro station) SG-2
5 11 Dum Dum Cantonment DDC SG-3
6 13 Durganagar DGNR SG-3
7 14 Birati BBT SG-3
8 16 Bisharpara Kodaliya BRPK SG-3
9 17 New Barrackpur NBE SG-3
10 19 Madhyamgram MMG Kolkata Metro Yellow Line (Madhyamgram metro station) SG-2
11 21 Hridaypur HHR Kolkata Metro Yellow Line (Hridaypur metro station) SG-3
12 23 Barasat Junction BT Barasat–Hasnabad branch line /Kolkata Metro Yellow Line (Barasat metro station) SG-2
13 27 Bamangachhi BMG SG-3
14 31 Dattapukur DTK SG-3
15 35 Bira BIRA SG-3
16 38 Guma GUMA SG-3
17 42 Ashoknagar Road ASKR SG-3
18 45 Habra HB SG-2
19 50 Sanhati SNHT HG-3
20 55 Machhalandapur MSL SG-3
21 58 Gobardanga GBG SG-3
22 64 Thakurnagar TKNR SG-3
23 68 Chandpara CDP SG-3
24 73 Bibhutibhusan Halt BNAA HG-3
25 78 Bangaon Junction BNJ Ranaghat–Bangaon branch line SG-3
↑↓ International passenger or freight traffic only
26 82 Petrapole PTPL Petrapole Land Port HG-3
Close

Barasat–Hasnabad branch line

More information Barasat–Hasnabad branch line, # ...
Barasat–Hasnabad branch line
# Distance from Barasat Junction (km) Station Name Station Code Connections Station Category[31]
1 0 Barasat Junction BT Sealdah–Barasat–Bangaon line /Kolkata Metro Yellow Line (Barasat metro station) SG-2
2 3 Kazipara KZPR HG-3
3 6 Karea Kadambagachi KBGH HG-3
4 10 Bahira Kalibari BHKA HG-3
5 12 Sondalia SXC SG-3
6 15 Beliaghata Road BGRD HG-3
7 18 Lebutala LBTL HG-3
8 20 Bhasila BSLA SG-3
9 23 Harua Road HRO SG-3
10 27 Kankra Mirzanagar KMZA HG-3
11 31 Malatipur MPE SG-3
12 33 Ghora Ras Ghona GGV HG-3
13 36 Champapukur CQR SG-3
14 41 Bhyabla BBLA HG-3
15 42 Basirhat BSHT SG-3
16 45 Matania Anantapur MNAP HG-3
17 47 Madhyampur MPN HG-3
18 48 Nimdanri NMDR HG-3
19 51 Taki Road TKF SG-3
20 53 Hasnabad HNB SG-3
Close

Ranaghat–Bangaon branch line

More information Ranaghat–Bangaon branch line, # ...
Ranaghat–Bangaon branch line
# Distance from Ranaghat Junction (km) Station Name Station Code Connections Station Category[31]
1 0 Ranaghat Junction BT Sealdah–Ranaghat–Gede line / Ranaghat–Krishnanagar City–Lalgola line SG-2
2 3 Coopers Halt CPHT HG-3
3 5 Naba Raynagar NBRN HG-3
4 10 Gangnapur GGP SG-3
5 15 Majhergram MAJ SG-3
6 18 Akaipur Halt AKIP HG-3
7 18 Gopalnagar GN SG-3
8 23 Satberia Halt STBB HG-3
9 28 Bangaon Junction BNJ Sealdah–Bangaon branch line SG-3
↑↓ International passenger or freight traffic only
10 32 Petrapole PTPL Petrapole Land Port HG-3
Close

Planned extensions

The Machhalandapur–Swarupnagar, Bira–Chakla, Bangaon–Chandabazar–Bagdah, Bangaon–Poramaheshtala and HasnabadHingalganj new lines were sanctioned in the railway budgets between 2009 and 2012 under the tenure of Mamata Banerjee as the railway minister. None of the projects however could be started because of non-availability of land and hence the work has been kept under abeyance by the Railway Board.[32][33][34]

The name and the setting of the Bengali social drama film, 8:08 Er Bongaon Local is based on the daily suburban EMU local which leaves the Sealdah station for Bangaon Junction at 8:08 a.m. IST.[35][36]