Rutherford GO Station
Train station in Vaughan, Ontario From Wikipedia, the free encyclopedia
Train station in Vaughan, Ontario From Wikipedia, the free encyclopedia
Rutherford GO Station is a train and bus station in the GO Transit network located in Vaughan, Ontario, Canada. It is a stop on the Barrie line train service. This station was opened in January 2001 to accommodate the growing ridership on the line. It is currently going through a redevelopment project which is expected to be completed in 2023.
General information | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | 699 Westburne Drive Vaughan, Ontario Canada | ||||||||||||
Coordinates | 43°50′18.3″N 79°29′53.7″W | ||||||||||||
Owned by | Metrolinx | ||||||||||||
Platforms | 1 side platform (train) 9 (bus) | ||||||||||||
Tracks | 1 | ||||||||||||
Connections | |||||||||||||
Construction | |||||||||||||
Structure type | Brick station building | ||||||||||||
Parking | 2,200[1][2] | ||||||||||||
Bicycle facilities | 100[2] | ||||||||||||
Accessible | Yes | ||||||||||||
Other information | |||||||||||||
Station code | GO Transit: RU | ||||||||||||
Fare zone | 61 | ||||||||||||
History | |||||||||||||
Opened | 7 January 2001 | ||||||||||||
Rebuilt | 2020-2022 | ||||||||||||
Passengers | |||||||||||||
2019 | 1,300 | ||||||||||||
Services | |||||||||||||
| |||||||||||||
|
This station was opened in January 2001 to accommodate the growing ridership on the Barrie line along with the growing communities surrounding Rutherford GO Station. Another reason for the station's presence was due to Maple GO Station's parking congestion prior to Rutherford's opening.[3]
In May 2017, Metrolinx issued a request for qualification (RFQ) for the redevelopment of the station.[4] In November 2017 Infrastructure Ontario issued a request for proposal from EllisDon Infrastructure Transit, Link Rutherford Station, and Steelhead, the three candidates shortlisted from the RFQ process, for the design, construction, and maintenance of the site.[5] In December 2018, the contract for the project was awarded to EllisDon Infrastructure Transit and it was announced that construction on the project would start in spring 2019 and finish in 2023.[6] The project included the following features:
The new accessible station building opened in December 2021, and the previous station building was demolished in February 2022.[7] In March 2022, the multi-level parking structure opened.[2]
As of January 2018, train service operates approximately every 15–30 minutes in the morning peak period, every 30 minutes in the afternoon peak period and every hour at other times. Outside of peak periods, most trains terminate at Aurora with connecting buses for stations further north.[8]
This station is served by 3 York Region Transit (YRT) bus routes:
On weekends and holidays, service operates approximately hourly between Aurora and Toronto. Three daily trains in each direction cover the full route from Barrie to Toronto, while the remainder have bus connections at Aurora station for stations further north.[8]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.