The Red Line (Line 1) is a rapid transit metro line of the Delhi Metro in Delhi, India. It is mostly an elevated line and has 29 stations that runs from Rithala to Shaheed Sthal with a total distance of 34.55 km (21.47 mi).[2] The Tis HazariShahdara section of this line was the first stretch of the Delhi Metro that was constructed and commissioned. The line connects the areas of Ghaziabad in Uttar Pradesh and the districts of Shahdara,[3][4] Central Delhi[5][6] and North West Delhi[7][8] in Delhi.

Quick Facts Red Line (Line 1), Overview ...
Red Line
(Line 1)
Red Line
Overview
StatusOperational
OwnerDMRC
LocaleDelhi and Ghaziabad
Termini
Stations29
Service
TypeRapid Transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
Daily ridership374,516[1]
History
Opened
Technical
Line length34.55 km (21.47 mi)
CharacterAt-grade and Elevated
Track gauge1,676 mm (5 ft 6 in) broad gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Shaheed Sthal
Hindon River
Arthala
Mohan Nagar
Shyam Park
Major Mohit Sharma Rajendra Nagar
Raj Bagh
Shaheed Nagar
Dilshad Garden
Jhilmil
Mansarovar Park
Shahdara Junction
Shahdara
Swami Dayanand Marg
Welcome
Seelampur
Shastri Park
Kashmere Gate
Tis Hazari
Rani Jhansi Road
Pul Bangash
Subzi Mandi
Kishanganj
Pratap Nagar
Swami Narayan Marg
Shastri Nagar
Inderlok
Kanhaiya Nagar
Keshav Puram
Ring Road
Netaji Subhash Place
Kohat Enclave
Pitampura
Outer Ring Road
Rohini East
Rohini West
Rithala
Rohini Sector 24&25
Rohini Sector 26
Rohini Sector 31
Rohini Sector 32
Rohini Sector 36&37
Barwala
Rohini Sector 35
Rohini Sector 34
Bawana Industrial Area Sector 3&4
Bawana Industrial Area Sector 1&2
Bawana JJ Colony
Sanoth
New Sanoth
Depot Station
Bhorgarh
Anaj Mandi Narela
Narela DDA Sports Complex
Narela
Narela Sector 5
Delhi
Haryana
border
Kundli
Nathupur
Close

The Red Line has interchanges with the Yellow Line and Violet line at Kashmere Gate, the Pink Line at Welcome and Netaji Subhash Place, and the Green Line at Inderlok. It is the third most heavily used line of the Delhi Metro network as it acts as a link for those in West Delhi and North West Delhi traveling towards Central Delhi, Shahdara, East Delhi, and Ghaziabad, and vice versa.

History

Summarize
Perspective
More information Phase, Extension date ...
Red Line
Phase Extension date Termini Length Stations
I 25 December 2002ShahdaraTis Hazari8.35 kilometers (5.19 mi)6
3 October 2003Tis HazariInderlok4.87 kilometers (3.03 mi)4
31 March 2004InderlokRithala8.84 kilometers (5.49 mi)8
II 4 June 2008ShahdaraDilshad Garden2.86 kilometers (1.78 mi)3
III 8 March 2019 Dilshad Garden Shaheed Sthal 9.63 kilometers (5.98 mi) 8
TotalShaheed SthalRithala34.55 kilometers (21.47 mi)29
Close

Phase I & II

The Red Line was the first line of the Delhi Metro to be constructed and opened. The Tis Hazari – Shahdara section of the line was inaugurated by the then Prime Minister of India, Shri. Atal Bihari Vajpayee, on 25 December 2002 and opened to the public on the same day.[9] Subsequent sections opened between Tis Hazari – Inderlok on 3 October 2003, Inderlok – Rithala on 31 March 2004 and Shahdara – Dilshad Garden on 4 June 2008.[10]

Phase III

As part of the Phase III of Delhi Metro, an eastward extension of 9.5 kilometres (5.90 mi) from Dilshad Garden to Ghaziabad ISBT (New Bus Adda) was approved by DMRC and MoHUA in January 2014. Construction began in early 2015 and commercial operations started on 8 March 2019, thereby providing commuters another link to travel to Ghaziabad along with the Blue Line branch that connects to Kaushambi and Vaishali.[11] In November 2022, Delhi Metro introduced a set of two eight-coach trains on the Red Line, which were converted from the existing fleet of 39 six-coach trains.[12] By April 2024, all the six-coach trains had been converted to 8-coach ones.[13]

Phase IV

"Red Line Phase IV: Rithala-Narela-Nathupur": Under the Phase IV of the Delhi Metro, the Red Line is proposed to be extended towards Kundli with 21 new stations at Rohini Sector 25, Rohini Sector 26, Rohini Sector 31, Rohini Sector 32, Rohini Sector 36, Barwala, Rohini Sector 35, Rohini Sector 34, Bawana Industrial Area – 1 Sector 3,4, Bawana Industrial Area – 1 Sector 1,2, Bawana JJ Colony, Sanoth, New Sanoth, Depot Station, Bhorgarh Village, Anaj Mandi Narela, Narela DDA Sports Complex, Narela, Narela Sector 5, Kundli and Nathupur. All these stations will be elevated, except Depot Station, which would be at-grade.[14][15]

Phase V

"Red Line Phase V: Nathupur-Sector7": The "Red Line Phase IV: Rithala-Narela-Nathupur" line is planned to be extended in Phase-V to Faridabad Sector-7. In April 2025, initial land survey was being conducted for the feasibility and the DPR will be conducted after approval from DMRC.[16]

List of stations

Summarize
Perspective

Delhi Metro currently has parking facilities Car parking at 20 metro stations of the Red line.[17][18]

More information #, Station Name ...
Red Line
# Station Name Phase Opening Interchange connection Station Layout Platform Level Type Depot Connection Depot Layout
English Hindi
1Shaheed Sthalशहीद स्थल 38 March 2019 Ghaziabad Elevated Side None None
2Hindon Riverहिंडन रिवर 38 March 2019None Elevated Side None None
3Arthala अर्थला 38 March 2019None Elevated Side None None
4Mohan Nagarमोहन नगर 38 March 2019Blue Line(Phase 4 - Under Construction) Elevated Side None None
5Shyam Parkश्याम पार्क 38 March 2019None Elevated Side None None
6Major Mohit Sharma Rajendra Nagarमे‌‌जर मोहित शर्मा राजेन्द्र नगर 38 March 2019None Elevated Side None None
7Raj Baghराज बाग़ 38 March 2019None Elevated Side None None
8Shaheed Nagarशहीद नगर 38 March 2019None Elevated Side None None
9Dilshad Gardenदिलशाद गार्डन 24 June 2008None Elevated Side None None
10Jhilmil Car parkingझिलमिल 24 June 2008None Elevated Side None None
11Mansarovar Park Car parkingमानसरोवर पार्क 24 June 2008None Elevated Side None None
12Shahdara Car parkingशाहदरा 125 December 2002Shahdara railway station At Grade Side None None
13Welcome Car parkingवेलकम 125 December 2002Pink Line At Grade Island None None
14Seelampur Car parkingसीलमपुर 125 December 2002None At Grade Island None None
15Shastri Park Car parkingशास्त्री पार्क 125 December 2002None At Grade Side Shastri Park Depot At Grade
16Kashmere Gate Car parkingकश्मीरी गेट 125 December 2002Yellow Line
Violet Line
Kashmere Gate ISBT
Elevated Side None None
17Tis Hazari Car parkingतीस हज़ारी 125 December 2002None Elevated Side None None
18Pul Bangashपुल बंगश 1 3 October 2003 Magenta Line
(Phase 4 – Under Construction)
Elevated Side None None
19Pratap Nagar Car parkingप्रताप नगर 13 October 2003Subzi Mandi railway station
Delhi Kishanganj railway station
Elevated Side None None
20Shastri Nagar Car parkingशास्त्री नगर 13 October 2003None Elevated Side None None
21Inderlok Car parkingइंद्रलोक 13 October 2003Green Line Elevated Side None None
22Kanhaiya Nagar Car parkingकन्हैया नगर 131 March 2004None Elevated Side None None
23Keshav Puram Car parkingकेशव पुरम 131 March 2004None Elevated Side None None
24Netaji Subhash Place Car parkingनेताजी सुभाष प्लेस 131 March 2004Pink Line Elevated Side None None
25Kohat Enclave Car parkingकोहाट एन्क्लेव 131 March 2004None Elevated Side None None
26Pitampura Car parkingपीतमपुरा 131 March 2004Magenta Line
(Phase 4 – Under Construction)
Elevated Side None None
27Rohini East Car parkingरोहिणी पूर्व 131 March 2004None Elevated Side None None
28Rohini Westरोहिणी पश्चिम 131 March 2004None Elevated Side None None
29Rithala Car parkingरिठाला 131 March 2004None Elevated Side None None
30Rohini Sector 24-25रोहिणी सेक्टर 24-25 42030None Elevated Side None None
31Rohini Sector 26रोहिणी सेक्टर 26 42030None Elevated Side None None
32Rohini Sector 31रोहिणी सेक्टर 31 42030None Elevated Side None None
33Rohini Sector 32रोहिणी सेक्टर 32 42030None Elevated Side None None
34Rohini Sector 36-37रोहिणी सेक्टर 36-37 42030None Elevated Side None None
35Barwalaबरवाला 42030None Elevated Side None None
36Rohini Sector 35रोहिणी सेक्टर 35 42030None Elevated Side None None
37Rohini Sector 34रोहिणी सेक्टर 34 42030None Elevated Side None None
38Bawana Industrial Area Sector 3,4बवाना औद्योगिक क्षेत्र सेक्टर 3,4 42030None Elevated Side None None
39Bawana Industrial Area Sector 1,2बवाना औद्योगिक क्षेत्र सेक्टर 1,2 42030None Elevated Side None None
40Bawana JJ Colonyबवाना जे जे कॉलोनी 42030None Elevated Side None None
41Sanothसनोथ 42030None Elevated Side None None
42New Sanothनया सनोथ 42030None Elevated Side None None
43 Depot Station डिपो स्टेशन 4 2030 None At Grade Side Depot Station At Grade
44Bhorgarh Villageभोरगढ़ 42030None Elevated Side None None
45Anaj Mandi Narelaअनाज मंडी नरेला 42030None Elevated Side None None
46Narela DDA Sports Complexनरेला डीडीए स्पोर्ट्स कॉम्प्लेक्स 42030None Elevated Side None None
47Narelaनरेला 42030None Elevated Side None None
48Narela Sector 5नरेला सेक्टर 5 42030None Elevated Side None None
49Kundliकुंडली 42030None Elevated Side None None
50Nathupurनाथूपुर 42030None Elevated Side None None
Close

Train info

More information Rakes, Train Length ...
Red Line
Rakes Mitsubishi Hyundai Rotem BEML
Train Length 8
Train Gauge 5 ft 6 in (1,676 mm) broad gauge
Electrification 25 kV, 50 Hz AC through overhead catenary