Madras Atomic Power Station

Nuclear power plant south of Chennai, India From Wikipedia, the free encyclopedia

Madras Atomic Power Stationmap

Madras Atomic Power Station (MAPS) located at Kalpakkam about 80 kilometres (50 mi) south of Chennai, India, is a comprehensive nuclear power production, fuel reprocessing, and waste treatment facility that includes plutonium fuel fabrication for fast breeder reactors (FBRs). It is also India's first fully indigenously constructed nuclear power station[citation needed], with two units each generating 220 MW of electricity. The first and second units of the station went critical in 1983 and 1985, respectively. The station has reactors housed in a reactor building with double shell containment improving protection also in the case of a loss-of-coolant accident. An Interim Storage Facility (ISF) is also located in Kalpakkam.

Quick Facts Country, Coordinates ...
Madras Atomic Power station
Thumb
Thumb
CountryIndia
Coordinates12°33′27″N 80°10′30″E
StatusOperational
Construction beganUnits 1 & 2: 1970 (1970)
PFBR: January 2004 (2004-01)
Commission dateUnits 1: 27 January 1984 (1984-01-27)
Units 2: 21 March 1986 (1986-03-21)
OwnersUnits 1 & 2: NPCIL
PFBR, FBR-1&2: BHAVINI
OperatorsUnits 1 & 2: NPCIL
PFBR, FBR-1&2: BHAVINI
Nuclear power station
Reactors2
Reactor typeUnits 1 & 2: IPHWR-220
PFBR: Prototype
FBR-1&2: FBR-600
Reactor supplierUnits 1 & 2: BARC/NPCIL
PFBR, FBR-1&2: IGCAR/BHAVINI
Cooling sourceBay of Bengal
Power generation
Units operational2 × 220 MW
Units planned2 × 600 MW
Units under const.1 × 500 MW
Nameplate capacity440 MW
Capacity factor44.21% (2020-21)[1]
Annual net output1703.92 GW.h (2020-21)[1]
External links
WebsiteNuclear power Corporation of India Ltd
CommonsRelated media on Commons
Close

The facility is also home to India's first large scale fast breeder reactor of 500 MWe called the Prototype Fast Breeder Reactor operated by BHAVINI and will also be the site of first two FBR-600 commercial fast breeder reactors.[2]

History

During its construction, a total of 3.8 lakh (380,000) railway sleeper (logs) were brought from all over India to lift the 180 ton critical equipment in the first unit, due to lack of proper infrastructure and handling equipment.[3]

As of July 2016 the Prototype Fast Breeder Reactor (PFBR) was in its final construction stage, and was expected to reach criticality in March 2017 with 500 MW of electricity production.[2][4] The following month the loading of the 1750 ton liquid sodium coolant were expected to happen in four to five months, with sources in the Department of Atomic Energy reporting that criticality would likely be reached only around May 2017.[5]

Reactors

The facility houses two indigenously built Pressurised Heavy-Water Reactors (PHWRs), MAPS-1 and MAPS-2 designed to produce 235 MW of electricity each.[6] MAPS-1 was completed in 1981, but start-up was delayed due to a shortage of heavy water. After procuring the necessary heavy water, MAPS-1 went critical in 1983 and began operating at full power on 27 January 1984. MAPS-2 obtained criticality in 1985 and began full power operations on 21 March 1986.[6][7]

With India not being a signatory to the Treaty on the Non-Proliferation of Nuclear Weapons the reactors have since 1985 been delivering their spent fuel to the nuclear reprocessing plant at Tarapur, providing the country with unsafeguarded plutonium.[6]

A beachhead at Kalpakkam also hosts India's first indigenous Pressurised (light) water reactor (PWR). The 80 MW reactor was developed by Bhabha Atomic Research Centre (BARC) as the land-based prototype of the nuclear power unit for India's nuclear submarines.[8] This unit does not come under MAPS.

Units

More information Phase, Unit No. ...
Phase Unit
No.
Reactor Status Capacity in MWe Construction start First criticality Grid Connection Commercial operation Closure Notes
TypeModelNetGross
I1PHWRIPHWR-220Operation suspended (under maintenance)2022201 January 19712 July 198323 July 198327 January 1984 [9][10]
2PHWRIPHWR-220Operational2022201 October 197212 August 198520 September 198521 March 1986 [9]
II3FBRPFBRCompleted47050023 October 2004 [9]
III4FBRFBR-600Planned570600 [9]
5FBRFBR-600Planned570600 [9]
Close

Incidents

The reactors' coolant pipes had been plagued by vibrations and cracking with substantial cracking in the reactor coolant system. This cracking has led to the discovery of Zircaloy pieces in a moderator pump, requiring the power generation to be lowered to 170 MW.[6]

On 26 March 1999 large amounts of heavy water spilled at MAPS-2, exposing seven technicians to heavy[quantify] doses of radiation.[6]