The MRTC 3100 class or CRRC Dalian 8MLB LRV is the class of second-generation uni-directional light rail vehicles (LRVs) built by CRRC Dalian. Owned by the Philippine government and operated by the Department of Transportation (DOTr), these are used on Line 3 of the Manila Metro Rail Transit System since 2016.

Quick Facts Stock type, In service ...

The trains were involved in legal issues and numerous controversies owing to its weight and incompatibility with the existing system, which the Metro Rail Transit Corporation (MRTC) raised that same year.[12] The trains remained idle as these issues persisted, but in 2018, limited deployment commenced.[1] It was repeatedly pulled from service and deployed erratically between 2019 and 2022, before being revived for regular operations in 2025.[5][13]

Remove ads

History

Summarize
Perspective

Background and purchase

With the ridership of the Line 3 already peaking at almost half of its 350,000 original daily capacity, there have been calls to purchase additional trains as early as 2008.[14] Initially, in February 2013, the government was looking at buying 52 second-hand trains from Madrid Metro and Inekon Trams to immediately augment the problem,[15][16] but after evaluation, the plan was dropped in June due to less advantageous timelines for delivery and higher maintenance costs.[17]

The first of three contracts of the Line 3 capacity expansion project,[b] which involves the procurement of 48 light rail vehicles,[18] was opened for bidding on February 22, 2013.[17] Sumitomo Corporation—the maintenance provider of the MRT-3 from 1999 to 2012—expressed interest in bidding for the contract.[17] Among the firms that tendered were CSR Zhuzhou Electric Locomotive (later CRRC Zhuzhou Locomotive) and CNR Dalian Locomotive & Rolling Stock (later CRRC Dalian). CSR Zhuzhou was disqualified by the Department of Transportation and Communications (DOTC; later the Department of Transportation). CNR Dalian was the only firm left in the bidding process, and the firm was awarded the 3.8 billion contract on January 16, 2014.[19][20][21]

Production and initial commissioning

The first prototype, LRV 3101, arrived at the Port of Manila on August 14, 2015,[22] and was assembled at LRT Line 1's Baclaran Depot on September 3.[23] It was then hauled to Line 3's North Avenue Depot, where it arrived on September 5.[24] CNR Dalian delivered all 48 train vehicles from 2016 to 2017, with some trains assembled at Taft Avenue station using a temporary track extension, and at Line 1's Baclaran Depot.

The first train was scheduled to enter revenue service at the end of March 2016 but delays in its 5,000-kilometer (3,100 mi) test run had delayed its deployment.[25][26][27] Nevertheless, these were deployed for the first time on May 7, 2016.[28]

Thumb
From 2016 to 2017, some railcars were parked beyond the buffer stop of the MRT-3 along the LRT Line 1 tracks before they were taken to its own depot.

On March 15, 2017, the Transportation Undersecretary for Railways, Cesar Chavez, said that the 3100 class trains could not be used until 2018 due to lack of signaling equipment and the necessary infrastructure upgrades needed to run the trains.[29] On April 25, Chavez announced another delay, pushing back full deployment to 2020.[30]

Limited deployments

On October 27, 2018, the 3100 class trains officially entered service after numerous tests and audits, with the deployment of the first train on the same day for 150-hour validation testing until November 21.[1] The second trainset was deployed from December 11 to 23,[31] and the third was deployed from January 23 to February 1, 2019, and in March.[32][33] The validation tests were conducted by the Philippine National Railways and Toshiba Infrastructure Systems.[34][35]

The 3100 class trains were subsequently pulled out of service and later stayed idle. In May 2019, Sumitomo Corporation took over as MRT Line 3's maintenance provider. Under its contract with the Department of Transportation (DOTr), it prohibits the use of the Dalian trains; if not, Sumitomo imposes penalties to the DOTr.[36] Both parties later signed a consent for its limited deployment in the evening, which commenced on October 15, 2019.[2] Initially planned to conclude by the end of the month, the DOTr extended it through November to further evaluate its performance,[37] and through December to cater more passengers for the Christmas season.[38]

On June 1, 2020, the DOTr deployed three Dalian train sets. These remained in service until May 25, 2021.[3] After a ten-month hiatus, one of the trainsets returned to revenue service on March 28, 2022, before being idled again.[4]

In 2021, one of the Dalian LRVs was sent to Mitsubishi Heavy Industries's testing facility in Mihara, Hiroshima Prefecture in Japan for further tests and audits.[39]

Full deployment

On July 16, 2025, President Bongbong Marcos led the fifth redeployment of the Dalian trains, with one trainset deployed during the weekday peak hours.[5] Marcos also ordered the DOTr to expedite further inspections and adjustments to the unused trains.[40]

Transportation Secretary Vince Dizon later confirmed in a media interview on DZMM that two additional 3-car train sets were undergoing final tests.[41] These trains are set to be deployed in August or September to accommodate the gradual increase in passenger demand in the lead-up to the Christmas season. Plans were also laid to deploy the trains during non-peak hours after initial testing during peak hours. Meanwhile, full deployment is set for 2026, when the remaining 39 other train cars are put to service.[39]

Remove ads

Design

Summarize
Perspective

Car body

The car body is made of stainless steel with a livery of sky blue and yellow fascia. Dimensions are nearly the same to the RT8D5M, which are also built for single-ended operations. It is connected by a Jacobs bogie and a gangway in each railcar section. The LRV design is a one-way eight-axle motorized car consisting of three articulated cars, which are connected to each other by the joint and the cover.[9]

Each light rail vehicle has three roof-mounted air-conditioning units. In total, there are nine air-conditioning units in a three-car train set.

Interior

Each railcar is provided with five double leaf, electronically operated, plug-sliding doors. The three center doors have an open width of 1,255 millimeters (4 ft 1.4 in) while the two end doors at 861 millimeters (2 ft 9.9 in).[11]

Each train car has a capacity of 394 passengers. A 3-car trainset can accommodate 1,182 passengers.[6] Two wheelchair-compatible spaces are provided beside the driver cab of each LRV, each provided with seatbelts to prevent the wheelchair from moving around while the train is in motion. The sides of the doors are equipped with fire extinguishers. The trains also have an equipped passenger emergency alarm button in case of an emergency.[42]

Mechanical

Each LRV has four bogies consisting of two motorized bogies at the ends of the LRV and two shared trailer bogies under the articulations. Scharfenberg couplers manufactured by Voith are present in each vehicle.[10]

Electrical

Traction is powered through an IGBTVVVF inverter control manufactured by Voith, and two controllers are installed per vehicle. The traction motor is a three-phase induction motor (totally enclosed/self-ventilated type) manufactured by Traktionssysteme Austria, model TMR 36-28-4, and is combined with Voith quill drive unit.[7][10] The traction equipment includes two Voith EmCon I1000-9AU traction inverters with 350 kVA continuous power in each that drives the traction motors, one auxiliary converter, and a VPort IO control unit.[10]

The traction motor of the overhauled LRTA 1100 class trains are also manufactured by Voith, and both trains produces identical acceleration sounds.

Remove ads

Issues and controversies

Summarize
Perspective

Shortly after the contract was awarded, the Metro Rail Transit Corporation (MRTC)—the private owner of the MRT-3—accused the DOTC of violating its build-lease-transfer (BLT) agreement with the MRTC. A Regional Trial Court in Makati issued a temporary restraining order on January 30, halting the acquisition process.[43] Under the BLT agreement, MRTC was assigned the preferential right to purchase new trains, and MRTC can only lose this right if it breaches its obligations under the BLT agreement or consents to the use of trains not provided by MRTC but by the DOTC. In this case, however, DOTC chose to bid out the contract without MRTC's permission. [44]

The court dismissed the case on February 21, citing a law which states that the Supreme Court could only stop infrastructure projects by the national government.[45] MRTC subsequently sent its case to the Court of Appeals (CA), which also sided with the DOTC.[46] MRTC appealed again, resulting in another failure.[47]

On October 14, 2022, the Supreme Court denied MRTC's appeal for injunction to prevent the DOTr from procuring the new trains, thereby permitting their utilization as pursuant to the existing contract.[48]

Safety concerns

Early on, the DOTC reportedly planned to redo the bidding process while it was reviewing CNR Dalian's capability. According to an unnamed DOTC official who doubted CNR's capability, the firm has no track record of designing and manufacturing light rail vehicles (as its portfolio comprises primarily of locomotives),[44] a claim later backed by the MRTC in January 2016. MRTC, through its chairman Robert Sobrepeña, also claimed that the trains did not undergo a 5,000-kilometer (3,100 mi) test run in China before the shipment to the Philippines.[12]

In 2017, Transportation Undersecretary for Railways Cesar Chavez admitted that the 3100 class trains lacked sufficient signaling equipment, causing a delay in its deployment.[29] By February 2018, only 29 out of 48 trains were installed with on-board automatic train protection (ATP) system equipment.[49] In 2019, Bombardier Transportation certified the onboard signaling systems of the trains.[50] By the end of 2022, only nine out of the 48 light rail vehicles (LRV) were provisionally accepted for regular operations, while the remaining 39 were yet to undergo testing and commissioning.[51]

Weight issues

The tare weight of the trains exceeded the 46.3-tonne (102,000 lb) requirement by 3.4 tonnes (7,500 lb), weighing 49.7 tonnes (110,000 lb).[52] Senator JV Ejercito, in October 2017, said that the weight of the 8MLB trains exceeded the "tolerance limit" of the tracks; he compared the trains' tare weight to a fully-loaded one.[53]

On February 20, 2018, Rolf Bieri, a consultant with former maintenance provider Comm Builders & Technology Philippines (CB&T), said in a Senate hearing that the trains are within the allowable specifications set by the DOTr. Bieri explained that the axle load had to be divided from the projected fully loaded (laden) weight of one LRV at 75.2 tonnes (166,000 lb) by the eight axles, resulting in a 9.4-tonne (21,000 lb) axle load—within the range limit of 8.5 to 10 tonnes (19,000 to 22,000 lb). He further explained that the tracks could not handle anything heavier than the specified limit.[6] An audit from TÜV Rheinland revealed that the trains' fully laden weight complied with the specification limit.[50]

Resolution

On August 30, 2018, Transportation Secretary Arthur Tugade announced that CRRC Dalian agreed to shoulder all costs to fix the 3100 class trains.[54][55] Due to the Dalian trains undergoing the said adjustments, they are now slowly being introduced into revenue runs since October 2018.[1]

Remove ads

Train formation

Each unidirectional light rail vehicle consists of three articulated cars.

More information Car designation, A-car ...

Incidents

  • On December 16, 2020, at 7:20 PM, a 3100 class train arriving at Boni station stopped due to a technical glitch.[56] Around 3,500 commuters were affected as operations were limited between North Avenue and Shaw Boulevard stations. Normal operations resumed the following day.[57][58]

See also

Notes

  1. Re-entered service on October 27, 2018 (6 years ago) (2018-10-27),[1] October 15, 2019 (5 years ago) (2019-10-15),[2] June 1, 2020 (5 years ago) (2020-06-01),[3] March 28, 2022 (3 years ago) (2022-03-28),[4] and July 16, 2025 (24 days ago) (2025-07-16).[5]
  2. The other two covered the upgrade of the line's ancillary systems (power supply, overhead catenary, and railway tracks), and the signaling system.[18]