Name | Type | Location | Capacity (MW) | Area (acres) | Online date | # of panels | Owner | Details | Ref |
Anclote | NG | Pasco County | 1013 | n/a | 1974 | n/a | Progress | 2-unit natural gas steam | [14] |
Arvah B. Hopkins | NG | Leon County | 484.5 | n/a | 1971 | n/a | City of Tallahassee | 2-unit fossil steam; natural gas fired combustion turbine; natural gas fired combined cycle; natural gas internal combustion engine | [15] |
Avon Park | NG | Highlands County | 24 | n/a | 1968 | n/a | Progress | 2-unit combustion turbine | [16] |
Babcock Ranch | PV | Charlotte County | 75 | 440 | 2016/12 | 343,000 | FPL | 139 MW planned | [17][18] |
Balm | PV | Hillsborough County | 74.5 | 548 | 2018/09 | 736,226 | TECO | | [19][20] |
Barefoot Bay | PV | Brevard County | 74.5 | 462 | 2018/03 | ~330,000 | FPL | | [21] |
Bartow | NG | Franklin County | 1133 | n/a | 2009/06 | n/a | Progress | Combined cycle (4 gas, 1 steam turbine) & 4 combustion turbines | [22] |
Bayboro |
PE |
Pinellas County |
171 |
n/a |
1973 |
n/a |
Progress Energy |
Four combustion turbine units used during times of peak demand |
[16] |
Big Bend Power Station | NG | Hillsborough County | 56 | n/a | 1969 | n/a | FPL | 4-unit coal, 3-unit combustion turbine peaking | [23] |
Big Bend Solar | PV | Hillsborough County | 20 | 106 | 2017/03 | 202,300 | TECO | | [20][24] |
Blue Cypress | PV | Indian River County | 74.5 | 432 | 2018/03 | ~330,000 | FPL | | [25] |
Bonnie Mine | PV | Polk County | 37.5 | 352 | | 349,439 | TECO | | [20][26] |
Brandy Branch Generating Station | NG | Duval County | 710 | n/a | | n/a | FPL | 170 MW simple-cycle natural gas combustion turbine, 2-on-1 combined cycle unit consisting of two 170 MW natural gas combustion turbines and 200 MW steam turbine-electric generator | [27] |
C.D. McIntosh Power Plant | NG | Polk County | 360 | n/a | | n/a | FPL | Combined cycle natural gas | [28] |
C. D. Macintosh Jr. |
PE |
Polk County |
5 |
n/a |
1978/12 |
n/a |
Lakeland Electric |
Fossil fuel-fired boiler and electric turbine-steam generator (Unit 3); a natural gas-fired combined cycle unit (Unit 5) |
[29] |
Cape Canaveral | NG | Brevard County | 1290 | n/a | | n/a | FPL | Unit 1 (3X1 combined cycle) gas/oil | [30] |
Citrus Combined Cycle Plant |
NG |
Citrus County |
1640 |
n/a |
|
n/a |
FPL |
820 MW natural gas combined-cycle turbines (2 units) |
[31] |
Citrus Solar | PV | DeSoto County | 74.5 | 841 | 2016/12 | | FPL | | [32] |
Coral Farms | PV | Putnam County | 74.5 | 587 | 2018/01 | ~330,000 | FPL | | [33] |
Crystal River Energy Complex | NG | Citrus County | 1610 | n/a | 1982 | n/a | Progress | 700 MW fossil-fuel fired generators (2 units) | [34][31] |
Crystal River Nuclear Plant | NU | Citrus County | 860 | n/a | 1978 | n/a | Duke Energy | 700 MW fossil-fuel fired generators (2 units) | |
DeBary | NG | Volusia County | 237 | n/a | | n/a | Progress | 10-unit combustion turbine | [35] |
DeBary Plant |
PE |
Volusia County |
322 |
n/a |
1975 |
n/a |
Progress Energy |
10 combustion turbine units used primarily during times of peak demand |
[16] |
Debary Solar Power Plant |
PV |
Volusia County |
74.5 |
445 |
2020/05 |
300,000 |
Duke Energy |
|
[36][37] |
Deerhaven Generating Station | NG | Alachua County | 185 | n/a | 1972 | n/a | Gainesville Regional Utilities | Simple-cycle combustion turbine | [38] |
DeSoto Next Generation Solar Energy Center | PV | DeSoto County | 25 | 235 | 2009/10 | 90,000 | FPL | 300 planned | [39] |
Echo River Solar | PV | Suwannee County | 74.5 | ~500 | | ~330,000 | FPL | | [40] |
Field Street |
PE |
Volusia County |
44 |
n/a |
2001 |
n/a |
New Smyrna Beach Utilities Commission |
|
[41] |
Fort Drum Solar Energy Center | PV | Okeechobee County | 74.5 | 840 | 2021/06 | 309,120 | FPL | | [42][43] |
Fort Myers Generating | NG | Lee County | 2378 | n/a | | n/a | FPL | Combined cycle (6 x 2) 2 peaking units: 2 gas/oil | [30] |
Fort Myers Power Plant |
PE |
Lee County |
108 |
n/a |
2003/06 |
n/a |
FPL |
|
[44] |
George E. Turner Power Plant | NG | Volusia County | 147 | n/a | 1970 | n/a | Progress Energy | Combustion turbine | [16] |
Grange Hall | PV | Hillsborough County | 61.1 | 447 | | 595,213 | TECO | | [20] |
Gulf Clean Energy Center |
NG |
Escambia County |
1047 |
n/a |
|
n/a |
FPL |
Natural gas fired combustion turbine; NG gas steam turbine. Formerly Crist. |
[45] |
Gulf Coast Solar Center I | PV | Valparaiso | 30 | 240 | 2017 | 371,325 | Gulf Power | | [46] |
Gulf Coast Solar Center II | PV | Navarre | 40 | 336 | 2017 | 472,800 | Gulf Power | | [46] |
Gulf Coast Solar Center III | PV | Bellview | 50 | 366 | 2017 | 599,775 | Gulf Power | | [46] |
H.L. Culbreath Bay Side | NG | Hillsborough County | 1854 | n/a | 1999 | n/a | FPL | Natural gas | [47] |
Hamilton | PV | Jasper, Florida | 74.9 | | 2018/12 | | Duke | | [48] |
Hammock | PV | Hendry County | 74.5 | 957 | 2018/03 | ~330,000 | FPL | | [49] |
Hardee Power Station | NG | Pinellas County | 471 | n/a | | n/a | FPL | 2-on-1 combined cycle unit | [50][51] |
Higgins | NG | Pinellas County | 114 | n/a | 1969 | n/a | Progress | 4-unit combustion turbine | [16] |
Hillsborough County SW Energy Recovery Facility |
WA |
Hillsborough County |
47 |
n/a |
1984/12 |
n/a |
Hillsborough County |
|
[10][52] |
Hines Energy Complex | NG | Polk County | 2054 | n/a | 1999 | n/a | Progress | 4-unit combined cycle | [16] |
Horizon Solar Energy Center | PV | Putnam County | 74.5 | 684 | 2018/01 | ~330,000 | NextEra Energy | | [53] |
Indian River Power Plant | NG | Brevard County | 290 | n/a | | n/a | FPL | Converted to natural gas, waiting state approval to operate in 2015 | [54] |
Indian River Solar | PV | Indian River County | 74.5 | 695 | 2018/01 | ~330,000 | FPL | | [55] |
Intercession City | NG | Osceola County | 534 | n/a | 1974 | n/a | Progress Energy | 14-unit combustion turbine | [16] |
Intercession City |
PE |
Osceola County |
417 |
n/a |
1993/10 |
n/a |
Duke Energy |
|
[56] |
Interstate Solar | PV | St. Lucie County | 74.5 | 543 | | ~330,000 | FPL | | [57] |
J.D. Kennedy Generating Station | NG | Duval County | 357.2 | n/a | 2000/06 | n/a | JEA | 1-unit oil/gas combustion turbine, 3 peaking units | [58] |
Jacksonville Solar | PV | Duval County | 15 | 100 | 2010 | 200,000 | PSEG Solar Source LLC | | [59] |
Jim Woodruff Dam | HY | Gadsden County | 43.5 | n/a | 1957 | n/a | USACE-Mobile | Net summer | |
Lake County Resource Recovery Facility |
WA |
Lake County |
14.5 |
n/a |
1991/03 |
n/a |
Covanta Lake II |
|
[10][60] |
Lake Hancock | PV | Polk County | 49.6 | 356 | | 467,820 | TECO | | [20][61] |
Lansing Smith Electric Generating Plant | NG | Bay County | 543 | n/a | | n/a | FPL | 2-on-1 natural gas combined-cycle (1 unit) | [62] |
Larsen Memorial | NG | Polk County | 124 | n/a | | n/a | FPL | Natural gas, diesel backup | [28][63] |
Lansing Smith Electric Generating Plant |
PE |
Bay County |
32 |
n/a |
2002/04 |
n/a |
Florida Power & Light |
[64] |
[62] |
Lauderdale Power Station | NG | Broward County | 1223.6 | n/a | | n/a | FPL | 2 (2x1 combined cycle) with 2 units gas/oil | [30] |
Lee County Waste-to-Energy Facility |
WA |
Lee County |
57.4 |
n/a |
2001 |
n/a |
Reworld |
Two 600 ton-per-day (TPD) waterwall furnaces and one 636 TPD with Martin® reverse-reciprocating grates and ash handling system |
[65] |
Lithia | PV | Hillsborough County | 74.5 | 580 | | 742,194 | TECO | | [20] |
Loggerhead | PV | St. Lucie County | 74.5 | 565 | 2018/03 | ~330,000 | FPL | | [66] |
Manatee Power Plant | NG | Hillsborough County | 1224 | n/a | | n/a | FPL | 4-on-1 combined-cycle consisting of four 170 MW combustion turbines with 470 MW steam turbine-electric generator | [30][67] |
Manatee Combined Cycle Power Plant |
PE |
Manatee County |
1618 |
n/a |
2005/06 |
n/a |
FPL |
[68] |
[67] |
Manatee Solar | PV | Manatee County | 74.5 | 762 | 2016/12 | 338,000 | FPL | | [69] |
Marathon Generating Plant |
PE |
Monroe County |
11 |
n/a |
|
n/a |
Marathon Petroleum |
|
|
Martin Next Generation Solar Energy Center | IS | Martin County | 75 | 500 | 2010/12 | 6,864 | FPL | (192,192 mirrors) | [70] |
Martin Power Plant | NG | Martin County | 2209 | n/a | | n/a | FPL | 500 MW 2-on-1 combined-cycle generators (2 units), 1100 MW 4-on-1 combined-cycle generator |
[30][71] |
McKay Bay Refuse-to-Energy Project |
WA |
Hillsboro County |
22.5 |
n/a |
1985 |
n/a |
City of Tampa |
|
[10][72] |
Miami-Dade County Resource Recovery |
WA |
Miami-Dade County |
77 |
n/a |
1978/01 |
n/a |
Miami-Dade County |
|
[10][73] |
Miami-Dade County Solar | PV | Miami-Dade County | 74.5 | 465 | | ~330,000 | FPL | | [74] |
Midulla Power Station | NG | Hardee County | 853 | n/a | | n/a | FPL | 2-on-1 combined cycle unit | [75][76] |
North Broward County Resource Recovery |
WA |
Broward County |
68 |
n/a |
1987/03 |
n/a |
Waste Innovations |
|
[10][77] |
Northern Preserve Solar | PV | Baker County | 74.5 | 565 | 2020 | 301,948 | FPL | [78] | |
Northside Generating Station | NG | Duval County | 524 | n/a | | n/a | FPL | 3-unit steam, 4-unit diesel peaking | |
Northside Generating Station |
PE |
Duval County |
212 |
n/a |
|
n/a |
JEA |
Unit ST3 |
|
Osprey Energy Center | NG | Polk County | 583 | n/a | | n/a | FPL | 1-unit: combined-cycle | [79] |
P. L. Bartow Combined Cycle Power Plant |
PE |
Pinellas County |
82 |
n/a |
2009/06 |
n/a |
Duke Energy |
|
[80] |
Palm Beach Renewable Energy Facility No. 1 |
WA |
Palm Beach County |
62 |
n/a |
1989 |
n/a |
Solid Waste Authority of Palm Beach County |
|
[10][81] |
Palm Beach Renewable Energy Facility No. 2 |
WA |
Palm Beach County |
95 |
n/a |
2015/07 |
n/a |
Solid Waste Authority of Palm Beach County |
|
[10][82] |
Pasco County Solid Waste Resource Recovery |
WA |
Pasco County |
49 |
n/a |
1988/08 |
n/a |
Pasco County |
|
[10][83] |
Payne Creek Generating Station | NG | Hardee County | 350 | n/a | | n/a | FPL | Gas-fired combined cycle | |
Payne Creek Solar | PV | Polk County | 70.3 | 503 | | 711,012 | TECO | | [20] |
Pea Ridge | NG | Santa Rosa County | 12 | n/a | | n/a | FPL | 5 MW natural-gas generators (3 units) |
[84][85] |
Peace Creek | PV | Polk County | 55.4 | 422 | | 467,820 | TECO | | [20] |
Pinellas County Resource Recovery Facility |
WA |
Pinellas County |
75 |
n/a |
1979/07 |
n/a |
Pinellas County |
|
[10][86] |
Pioneer Trail | PV | Volusia County | 74.5 | 1,219 | 2019 | ~330,000 | FPL | | [87] |
Polk Power Plant |
NG |
Polk County |
1281 | n/a | | n/a | FPL | Unit 1 integrated coal gasification combined-cycle, units 2&3 gas/oil combustion turbine, units 4&5 natural gas | [88][89] |
Polk Power Plant |
PE |
Polk County |
59 |
n/a |
1994 |
n/a |
TECO |
|
[90] |
Port Everglades | NG | Broward County | 1237 | n/a | | n/a | FPL | 12 unit gas/oil - repowered to 1 3x1 gas/oil unit | [30][91] |
Rio Pinar | NG | Orange County | 12 | n/a | 1970 | n/a | Progress Energy | Oil-fired peaker 1-unit combustion turbine | [16] |
Riviera |
NG |
Palm Beach County | 1290 | n/a | | n/a | FPL | 1 unit gas/oil (3x1 combined cycle) | [30] |
S. O. Purdom |
NG |
Volusia County |
226 | n/a | | n/a | FPL | Natural gas fired combined cycle | [92] |
Sanford | NG | Volusia County | 2352 | n/a | | n/a | FPL | 2 4x1 units gas | [30] |
Santa Rosa Energy Center | NG | Santa Rosa County | 235.9 | n/a | | n/a | FPL | 1-unit: combined-cycle | [93] |
South Broward County Resource Recovery |
WA |
Broward County |
66 |
n/a |
1986/06 |
n/a |
Waste Innovations |
|
[94] |
Space Coast Next Generation Solar Energy Center | PV | Brevard County (Kennedy Space Center) | 10 | 60 | 2010/04 | 35,000 | FPL NASA | | [95] |
St. Lucie Nuclear Power Plant |
NU |
Santa Rosa County |
1968 |
n/a |
1976/12 |
n/a |
FPL |
2 × C-E 2-loop nuclear PWR |
[30] |
Standby Generation Plant |
NG |
Santa Rosa County |
14 |
n/a |
|
n/a |
FPL |
Natural gas internal combustion engine |
|
Stanton Energy Center | NG | Orange County | 295 | n/a | | n/a | FPL | Unit A&B combined cycle, units 1&2 coal, 6 MW solar farm | [96][97][98] |
Stock Island Power Plant |
PE |
Monroe County |
114.5 |
n/a |
|
n/a |
Keys Energy Services |
four combustion turbine, two medium speed diesel and one high speed diesel |
[99] |
Sub 12 |
NG |
Leon County |
18.6 |
n/a |
|
n/a |
FPL |
Natural gas internal combustion engine |
[100] |
Sunshine Gateway | PV | Columbia County | 74.5 | 953 | 2019/01 | ~330,000 | FPL | | [101] |
Suwannee River | NG | Suwannee County | 99 | n/a | 1953 | n/a | Progress Energy | 3-unit combustion turbine | [16] |
Suwannee Solar Facility | PV | Suwannee County | 8.8 | 70 | 2017/12 | <44,000 | Duke Energy Florida | | [102] |
Tallahassee Solar Farm 1 | PV | Leon County | 20 | 120 | 2018/01 | ~200,000 | City of Tallahassee | | [103] |
Tallahassee Solar Farm 2 | PV | Leon County | 42 | 240 | 2020/02 | ~400,000 | City of Tallahassee | | [103] |
Tiger Bay Cogeneration Facility | NG | Polk County | 200 | n/a | 1999 | n/a | Progress Energy | Combustion turbine, heat recovery steam turbine generator, and steam generation boiler | [104] |
Tom G. Smith Power Plant | NG | Palm Beach County | 57.5 | n/a | | n/a | FPL | 30 MW combined-cycle generator | [105] |
Tom G. Smith Power Plant |
PE |
Palm Beach County |
36 |
n/a |
1976 |
n/a |
City of Lake Worth Utilities |
30 MW combined cycle unit (Unit S-5), a 30 MW simple cycle gas turbine, a 26 MW fossil fuel steam generating unit (Unit S-3) |
[106] |
Treasure Coast Energy Center | NG | St. Lucie County | 318 | n/a | | n/a | FPL | 1-unit natural gas | [107] |
Turkey Point Gas-fired Plant |
NG |
Miami-Dade County |
1253 |
n/a |
|
n/a |
FPL |
1 combined-cycle gas-fired turbine |
|
Turkey Point Nuclear Plant |
NU |
Miami-Dade County |
1658 |
n/a |
|
n/a |
FPL |
2 × Westinghouse 3-loop nuclear PWR |
[30][108] |
University of Florida | NG | Alachua County | 42.5 | n/a | 1994 | n/a | Progress Energy | 1-unit combustion turbine | [16] |
Vero Beach | NG | Indian River County | 117 | n/a | | n/a | FPL | | |
West County Energy Center | NG | Palm Beach County | 3756 | n/a | | n/a | FPL | 1250 MW 3-on-1 natural gas-fired combined cycle turbines (3 units) | [30][109] |
Wildflower | PV | DeSoto County | 74.5 | 721 | 2018/01 | ~330,000 | FPL | | [110] |
Winston Power Station |
PE |
Polk County |
50 |
n/a |
2001 |
n/a |
City of Lakeland |
Fuel oil |
[111] |