Line 9 (Hangzhou Metro)

Metro line of the Hangzhou Metro system in China From Wikipedia, the free encyclopedia

Line 9 (Hangzhou Metro)

Line 9 of the Hangzhou Metro (simplified Chinese: 杭州地铁九号线; traditional Chinese: 杭州地鐵九號線; pinyin: Hángzhōu Dìtiě Jiǔhào Xiàn) is a metro line in Hangzhou. The line is 29.45 km (18.30 mi) long and runs in a north–south direction between Guanyintang and Long'an.[1] The line is colored brown on system maps.

Quick Facts Overview, Status ...
Line 9
 9 
Line 9 train
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations21
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)Hangzhou Metro Corporation
Depot(s)Changda Road Depot
Sibao Stabling Yard
Rolling stockPM145
History
Opened10 July 2021; 3 years ago (2021-07-10)
Technical
Line length29.45 km (18.30 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed80 km/h (50 mph)
Route map

North extension to Tangqi
Changda Road Depot
1
Long'an
2
Wuzhou Road
3
Heyu Road
4
Qiushan Avenue
5
Linping
6
Nanyuan
International Campus, ZJU
7
Linpingnan Railway Station
8
Wengmei
9
Qiaosi
10
South Qiaosi
11
Coach Center
 1 
Line 1 interconnection
12
Jiumu Road
13
South Hongpu Road
14
Liubao
15
Wubao
Sibao Stabling Yard
16
Yudao
 19 
17
Sanbao
 6 
18
Jianghehui
19
Qianjiang Road
 2   4 
20
Xinye Road
21
Guanyintang
 7 
Close
Line 9 drawn to scale.

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Coach Center — Linping 24 November 2012; 12 years ago (2012-11-24)[a]
10 July 2021; 3 years ago (2021-07-10)[b]
12.5 km (7.8 mi)[3] 7 Central section of Phase 1
Linping — Long'an 17 September 2021; 3 years ago (2021-09-17)[4] 6.2 km (3.9 mi)[5] 4 North section of Phase 1
Guanyintang — Coach Center
(except Liubao and Wubao)
1 April 2022; 2 years ago (2022-04-01)[6][7] 12 km (7.5 mi)[6] 10 South section of Phase 1
Liubao and Wubao 14 December 2022; 2 years ago (2022-12-14)[8] 2 Infill stations
Close
  1. as part of Line 1
  2. Line 9 commencement[2]

Stations

Legend

  - Operational
  - Under construction

More information Section, Station name ...
Section Station name[1] Connections Distance
km
Location
English Chinese
North Long'an 龙安 0 0 Linping
Wuzhou Road 五洲路
Heyu Road 荷禹路
Qiushan Avenue 邱山大街
Central Linping 临平
Nanyuan 南苑
Linpingnan Railway Station 临平南高铁站  Hanghai 
Linpingnan railway station EVH
Wengmei 翁梅
Qiaosi 乔司
South Qiaosi 乔司南
Coach Center 客运中心  1  Shangcheng
South Jiumu Road 九睦路
South Hongpu Road 红普南路
Liubao 六堡
Wubao 五堡
Yudao 御道  19 
Sanbao 三堡  6 
Jianghehui 江河汇
Qianjiang Road 钱江路  2   4 
Xinye Road 新业路
Guanyintang 观音塘  7 
Close

Rolling stock

More information Stock, Class ...
Stock Class Year built Builder Number built Numbers Formation Depots Line assigned Notes
PM145 B 2020-2022 CRRC Nanjing Puzhen 186 (31 sets) 09 001 - 09 031 (090011-090316) Tc+Mp+M+M+Mp+Tc Changda Road Depot
Sibao Yard
 9 
Close

See also

References

Wikiwand - on

Seamless Wikipedia browsing. On steroids.