Loading AI tools
Railway line in Zhejiang, China From Wikipedia, the free encyclopedia
The Hangzhou–Haining Intercity Rail (Chinese: 杭海城际, abbreviation: HHCJ), also known as the Hanghai line, is a commuter rail line connected to, but operated independently of the Hangzhou Metro that connects the cities Hangzhou and Haining in Zhejiang, China. The total length is 46.38 km (28.819 mi) and has 12 stations, including 4 underground stations and 8 elevated stations and 2 stations with passing loops for express services.[3] The line began construction in late 2016 and opened on 28 June 2021.[4][5]
Hangzhou–Haining Intercity Rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | Hangzhou–Haining Intercity Railway (杭州至海宁城际铁路、杭海城际铁路) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Hangzhou and Haining, Zhejiang, China | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 12 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Commuter Rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Hangzhou Metro (connected to the system, but independent from it) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Zhejiang Rail Transit Operation Management Group Co., Ltd[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 4 car CRRC Nanjing Puzhen PM143[2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 28 June 2021 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 46.38 km (28.819 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Underground and Elevated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Loading gauge | Type B | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Overhead line, 1500 V DC | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 120 km/h (75 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
In November 2012, the Haining Municipal Government started preliminary work on the project. In December of the same year, an agreement was signed with the Yuhang District of Hangzhou.[6]
In February 2013, the Zhejiang Provincial Development and Reform Commission submitted the "Recent Construction Plan for the Intercity Railway in the Metropolitan Area of Zhejiang Province" to the National Development and Reform Commission, the plan includes the Hangzhou-Haining Intercity Railway.[7] This plan was approved by the NDRC on 16 December 2014.[8] construction started on the first section of the Hangzhou–Haining intercity railway project between Chang'an to Zhouwangmiao Stations on 15 December 2016.[9]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Yuhang Railway Station (now Linpingnan Railway Station) — International Campus, ZJU | 28 June 2021 | 46.38 km (28.819 mi) | 12 |
Fares for the line start at ¥2 for a trip of 4 km (2.485 mi) or less. For trips between 4 and 12 km (2.485 and 7.456 mi), each additional 4 km (2.485 mi) or less costs ¥1. For trips between 12 and 24 km (7.456 and 14.913 mi), each additional 6 km (3.728 mi) or less costs ¥1. For trips over 24 km (14.913 mi), each additional 8 km (4.971 mi) costs ¥1. A trip along the entire line from Linpingnan Railway Station to International Campus, ZJU costs ¥9.[10]
Hangzhou Metro and Shaoxing Metro farecards (including senior cards) and the Hangzhou Metro and Shaoxing Metro ride code can be used on the line. It is possible to buy a ticket from any metro station in Hangzhou or Shaoxing directly to a station on the Hangzhou-Haining Intercity Rail, as passengers do not pass through ticket gates when transferring at Linpingnan Railway Station. However, Hangzhou Metro adult farecard discounts (i.e. monthly 10%/30%/50% discount) and day passes are not valid on the Hangzhou-Haining Intercity Rail.
The line begins in the Linping district of Hangzhou at the Linpingnan Railway Station metro station, which connects the line to Line 9 (formerly the Linping branch of Line 1) of the Hangzhou Metro and is the only place on the line where passengers can transfer to the Hangzhou Metro. The line starts underground in its first tunnel (out of three tunnels) parallel to the Shanghai-Hangzhou high-speed railway and proceeds eastward underground, where it surfaces and rises to a viaduct before reaching Xucun station. The line continues eastward, continuing to parallel the Shanghai-Hangzhou high-speed railway, until it reaches Hainingxi Railway Station, where passengers can transfer to the high-speed rail station of the same name, which parallels the Hangzhou-Haining Intercity Rail station.
Past Hainingxi Railway Station, the line enters its second tunnel, where it curves away from the Shanghai-Hangzhou high-speed railway. The line then rises back to a viaduct and reaches the town of Chang'an and makes several stops there. Past Chang'an, the line reaches Zhouwangmiao station, which contains the first of the line's two passing loops for express trains. The train travels through the rural countryside until it reaches Yanguan station, located north of the Yanguan Town Tide-Viewing Park.
The line then passes by the Yanguan Depot, located north of the tracks, which stores and maintains the fleet of trains used on the line, and Tongjiu Highway station, a station at a road that leads northwards to Tongxiang. At Xieqiao station, the line reaches its second and final passing loop for express trains.
Arriving in downtown Haining, the line descends into its third and final tunnel, making three final stops at Leather City, Haichang Road, and International Campus, ZJU, all three of which are located underground. The tail tracks, which are used for reversing trains, extend a couple hundred metres past International Campus, ZJU station, ending just before reaching the station's namesake campus.[11]
The line does not share tracks with any other line, and its trackage is completely isolated from the Hangzhou Metro and the national railway system.
Notes on service routes as of June 2024:
Service
Routes |
Station name | Connections | Distance km |
Location | ||||
---|---|---|---|---|---|---|---|---|
L | Ex | English | Chinese | |||||
● | ● | Linpingnan Railway Station | 临平南高铁站 | 9 EVH | Linping | Hangzhou | ||
● | | | Xucun | 许村 | Haining | Jiaxing | |||
● | ↑ | Hainingxi Railway Station | 海宁高铁西站 | EUH | ||||
● | ↓ | Chang'an (Dongfang College) | 长安 (东方学院) | |||||
● | | | Chang'an East | 长安东 | |||||
● | | | Zhouwangmiao | 周王庙 | |||||
● | | | Yanguan | 盐官 | |||||
● | | | Tongjiu Highway | 桐九公路 | |||||
● | | | Xieqiao | 斜桥 | |||||
● | ● | Leather City | 皮革城 | |||||
● | ● | Haichang Road | 海昌路 | |||||
● | ● | International Campus, ZJU | 浙大国际校区 | |||||
Biyun (construction deferred) | 碧云 | |||||||
Passing loops for express trains are located at Zhouwangmiao and Xieqiao stations.
There is a police checkpoint at Linpingnan Railway Station. Passengers’ identity documents may be checked by the police when passing through the transfer corridor from the Hangzhou–Haining Intercity Rail to the Hangzhou Metro.
The line uses Class B rolling stock with a top speed of 120 km/h. Seating is arranged in a 2+2 fashion with soft padded seats.
Stock | Class | Year built | Builder | Number built | Numbers | Formation | Depots | Line assigned | Notes |
---|---|---|---|---|---|---|---|---|---|
PM143 | B (Express train) | 2020-2021 | CRRC Nanjing Puzhen | 68 (17 sets) | HH 001 - HH 017 (HH0011-HH0174) | TMc+Mp+Mp+TMc | Yanguan Depot | Hanghai | |
PM258 | 2023-2024 | 24 (6 sets) | HH 018 - HH 021 (HH0181-HH0214) |
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.