Comac C919

Chinese medium-range narrowbody airliner From Wikipedia, the free encyclopedia

Comac C919

The Comac C919 is a narrow-body airliner developed by Chinese aircraft manufacturer Comac. The development program was launched in 2008. Production began in December 2011, with the first prototype being rolled out on 2 November 2015; the maiden flight took place on 5 May 2017. On 29 September 2022 the C919 received its CAAC type certificate. The first production airframe was delivered to China Eastern Airlines on 9 December 2022 and was put into commercial passenger service on 28 May 2023.

Quick Facts General information, Type ...
COMAC C919
Thumb
Thumb
China Eastern C919-100 STD at approach
General information
TypeNarrow-body airliner
RoleMainline airliner
National originChina
ManufacturerCommercial Aircraft Corporation of China, Ltd.
Designer
StatusIn service
Primary usersChina Eastern Airlines
Number built22 (including 6 prototypes)[1][better source needed] [a]
History
Manufactured2015–present
Introduction date28 May 2023 with China Eastern Airlines[2]
First flight5 May 2017 (2017-05-05)[3]
Initiated2008
In service2023present
Close

The aircraft, primarily constructed with aluminium alloys, is powered by CFM International LEAP turbofan engines and carries 156 to 168 passengers in a normal operating configuration up to 5,555 km (3000 nmi; 3,500 mi). In 2023, COMAC announced that it would develop both a shortened and a stretched version of the passenger jet – similar to the sub-variants offered for the competing Boeing 737 MAX and Airbus A320neo family.

Naming

In the model number, the C stands for "Comac" and "China".[4] The C also forms an "ABC" parallel situation with Airbus and Boeing.[5]

Development

Summarize
Perspective
Thumb
Model of the C919 from 2010.

The 2008 program launch initially targeted a maiden flight in 2014.[6] Comac applied for a type certificate for the aircraft from the Civil Aviation Authority of China on 28 October 2010.[7] At that time the company intended to manufacture up to 2,300 aircraft of the type.[8] In June 2011, COMAC and Irish low-cost airline Ryanair signed an agreement to co-operate on the development of the C919.[9] In 2012 Airbus' chief strategist Marwan Lahoud assumed that the aircraft would offer competition to Airbus by 2020.[10]

Preliminary design

On 24 November 2011, Comac announced the completion of the joint definition phase, marking the end of the preliminary design phase for the C919, with estimated completion of the detailed design phase in 2012.[11] Production of the first C919 prototype began on 9 December 2011.[12] The C919's aerodynamics were designed with the help of the Tianhe-2 supercomputer.[13] The annual production was targeted at 150 planes by 2020.[14] Canada's Bombardier Aerospace started collaborating in March 2012 on supply chain services, electrical systems, human interface, cockpit, flight training, flight-test support, sales, and marketing.[15]

Prototyping

Its announced development budget was CN¥58 billion (US$9.5 billion) but its actual cost was estimated at well over CN¥125 billion (US$20 billion).[16] The first prototype was expected to complete final assembly in 2014 and perform its first flight in 2015;[17] however, delivery was delayed again until 2018 due to technical difficulties and supply issues.[18] At the November 2014 Zhuhai Airshow, it was announced that the first flight would be delayed to 2017.[19] On 2 November 2015, Comac rolled out its first C919 aircraft.[20][21][22]

In May 2018, the development of a composite wing completed in 2012 was revealed years after abandoning it for a metallic one, as static and damage tolerance tests were completed, verifying the structural design and strength before full-size composite wingbox tests.[23] On 12 July, the static test aircraft simulated a 2.5g manoeuvre with a 150% ultimate load, bending the wings at the tips by nearly three metres for three seconds.[24]

US espionage allegations

According to a report from cybersecurity firm Crowdstrike and a US Justice Department indictment, from 2010 to 2015 the Chinese cyberthreat actor Turbine Panda, linked to the Ministry of State Security's Jiangsu Bureau, penetrated a number of the C919's foreign components manufacturers including Ametek, Capstone Turbine, GE Aviation, Honeywell, Safran, and others and stole intellectual property and industrial process data with the aim of transitioning component manufacturing to Chinese companies.[25][26][27][28] The report stated that the operations involved both cyber intrusion and theft as well as HUMINT operations, in most cases using a piece of code custom written for this industrial espionage operation.[25][26][27][28] As of 2019, four people have been arrested in the US as a result of investigations into this economic espionage and theft of trade secrets.[28]

In November 2022, a federal jury in Cincinnati convicted Yanjun Xu, 42, on counts of conspiracy to commit economic espionage, conspiracy to commit trade secret theft, attempted economic espionage and attempted trade secret theft. The US court found that Xu played a key role in a plot to steal trade secrets from western aerospace firms, for the purpose of helping the C919 commercial airliner program. He was sentenced to 20 years in prison.[29]

Flight testing

Thumb
The first prototype ground tested

2017

Thumb
The C919 during its maiden flight on 5 May 2017

High-speed taxi tests by the first C919 prototype were completed in April 2017[30] and the first flight took place on 5 May 2017.[31][32] At the time, Comac had a planned test programme of 4,200 flight hours and introduction to service in 2020.[3] It was estimated that this could be delayed into 2021.[33] The European Aviation Safety Agency is intended to validate the Chinese type certificate.[34] The 4,200 hours of testing planned were higher than the 3,000 hours typically required for the Airbus or Boeing narrowbodies, but lower than the 5,000 hours needed for the ARJ21.[35]

Comac had its second prototype ready on 28 July 2017, aiming to fly it within the year for engine, APU, fuel system and extreme weather tests. The flight-test plan included six aircraft.[36] On 28 September, it made its second flight at 10,000 ft (3,000 m), which lasted 2 hours 46 minutes, although it was supposed to last one more hour.[37] The five-month delay between first and second flights, while the second prototype was being ground-tested, was extraordinary: in 2013 the Airbus A350 flew again after five days and in 2015 the troubled Mitsubishi MRJ flew again after eight days.[38]

On 3 November, it made its third flight in 3h 45min, reaching 3,000 m (9,800 ft).[39] It was transferred on 10 November from Shanghai to Xi'an to continue its flight test program, a 2h 24min, 1,300 km (700 nmi; 810 mi) flight reaching 7,800 m (25,600 ft) and Mach 0.74 (825 km/h; 445 kn).[40]

Thumb
The second prototype first flight on 17 December 2017

The second prototype made its first flight on 17 December 2017. The flight test program allocated the first three prototypes for aircraft performance and engine and power systems testing, the fourth prototype for avionics and electrical system, and the fifth and sixth prototypes for passenger facilities, including the cabin and information system.[citation needed]

2018

The delay between first and subsequent flights underlined the program immaturity by maiden flight: flying early at low speed and altitude is possible but faster and higher is limited by aeroelastic flutter needing ground vibration testing and aircraft instrumentation which were not ready in May.[41] Due to flight testing problems, the 2020 introduction previously scheduled was delayed to 2021, for China Eastern Airlines.[42] In February 2018, the first prototype was flying more than once a week.[43]

In June 2018, Aviation Week reported flight-test aircraft grounding for modifications, extending the schedule by three months but maintaining a 2020 certification target. The two prototypes needed their flaps and tailplanes modified, due to delamination of the carbon-fiber reinforced plastic elevators.[44] The third test aircraft was also being modified and maximum-rate pressurization was tested. As three other planes were available in 2019, Comac maintained first deliveries for 2021.[45]

Comac denied any grounding and highlighted that modifications were part of the flight test process, stating the two first aircraft were flying stability tests and checking systems. The first was calibrated and had its counterweight and trailing cone systems modified while the second had its functions and systems checked. The third was in final assembly with its wing and fuselage joined, cables and systems were being installed for a first flight target by the end of the year.[46] On 12 July, the second prototype flew from Shanghai-Pudong to Dongying Airport in 1h 46min to allow for various meteorological conditions testing.[24] In September, Comac expected to conduct 1,500 test flights for over 2,000 flying hours before the first delivery and planned to fly the third prototype before the end of 2018.[47]

In October 2018, the flight-deck design was re-evaluated to comply with US FAR Part 25.1302, which is not required by CAAC but would be needed for FAA certification in order to sell the aircraft outside China. Developing a Chinese engine to replace the CFM Leap-1C would take at least another 15 years.[48] At that time the two prototypes had flown less than 150 h, averaging less than 5 h per month each. To achieve certification in December 2020 and first delivery in 2021, the planned 4,200 h of flight tests would need 33 hours a month each if the last four prototypes are evenly spaced before year-end-2019. Newest airliner designs like the Airbus A350 needed a 2,600 hour test program, and the Mitsubishi MRJ was expected to need 3,000 h.[49]

On 15 October 2018, ten Chinese nationals, including intelligence officials, were indicted by the US for allegedly working with COMAC to allegedly steal the secrets of thirteen foreign aerospace companies working on the C919.[50]

By the end of 2018, the first prototype was to enter flutter flight tests after having completed ground tests.[51] The third prototype made its maiden flight on 28 December for 1h 38 min.[52]

2019

A fourth prototype conducted its maiden flight on 1 August 2019 from Shanghai Pudong International Airport.[53][32] A fifth prototype conducted its first flight on 24 October 2019, also from Shanghai airport; the fifth prototype was expected to test for extreme weather conditions, the environmental control system, drainage systems and electrical supplies.[54] Comac rescheduled its certification target from 2020 to 2021, with the first delivery the following year.[55][32]

The sixth and final prototype, intended for the flight certification program, completed its maiden flight on 27 December 2019. Reports at the time indicated that the C919 was expected to commence commercial service with China Eastern Airlines in either 2021 or 2022.[56]

2020

Air display at Nanchang in 2020 (0:50–1:50)

On 27 November 2020, the C919 received its type inspection authorization from the CAAC, meaning that "the aircraft design has been finalised and verified, and that no major changes can be made to its structure."[57]

2021

After completing cold-weather testing in China's Inner Mongolia, the C919 was slated to conduct flight tests in natural icing conditions from London International Airport in Ontario, Canada during March 2021. However, these tests may have been delayed due to the COVID-19 pandemic.[58][needs update]

Commercial introduction

2022

The C919 completed its first pre-delivery flight test at Shanghai Pudong International Airport. Comac reported that the aircraft (B-001J, MSN107) successfully completed a 3-hour test session on 14 May 2022.[59] The aircraft, bearing the livery of China Eastern Airlines, was set to be delivered in 2022.[60] In May 2022, the heavily modified jet was listed for a price of 653 million yuan (US$101 million), almost matching the Airbus A320neo and the Boeing 737 MAX competitors, and twice the US$50 million price initially anticipated, albeit with composite wings.[61]

The airline flew a number of route-proving flights throughout 2022 to reinforce its viability on important segments. Many of the flights were flown between different Chinese cities. Around the same time, the first production aircraft, bound for China Eastern Airlines, started performing flight tests to ensure its preparation for commercial service. COMAC reported after the first flight that all pre-set tasks were accomplished successfully.[62] Plans foresaw that one C919 was to be delivered to China Eastern Airlines in 2022,[needs update] while the remaining four aircraft in the first batch of orders would be delivered in 2023.[63]

The aircraft received its airworthiness certification from the Civil Aviation Administration of China on 29 September 2022[64] and the first operational airframe intended for commercial service was delivered to launch customer China Eastern Airlines on 9 December 2022 in Shanghai.[65]

2023

Thumb
The first C919 commercial flight departed from Shanghai Hongqiao Airport on 28 May 2023
Thumb
C919 flight demonstration over Victoria Harbour, Hong Kong

The C919 aircraft delivered to China Eastern Airlines continued flying short test flights for most of January 2023, with a break from 20 to 28 January for the Lunar New Year celebrations.[citation needed] In February 2023, China Eastern Airlines' C919 flight-test verification program was delayed due to a malfunction in the jet's CFM International LEAP-1C engine's thrust reverser.[citation needed] On 7 May 2023, test flights resumed after a three-month break that had grounded the entire fleet of C919s; the airline continued to plan for passenger revenue-service to commence in spring 2023.[citation needed]

On 28 May 2023, COMAC C919 commercial service began with China Eastern Airlines flight MU9191 departing from Shanghai Hongqiao Airport and arriving at Beijing Capital Airport.[2]

On 29 May 2023, the C919 began routine flights MU9197 and MU9198 connecting Shanghai Hongqiao Airport and Chengdu Tianfu Airport on a daily basis.[66][67]

China Eastern Airlines inducted a second C919 aircraft, registered as B-919C, with a formal reception taking place on 14 July 2023 at the flight test complex building of Zhuqiao base.[68]

In July 2023, it was announced that Suparna Airlines, a Chinese airline owned by HNA, had signed a framework agreement with SPDB Financial Leasing valued at US $3.6 billion for leasing 30 COMAC C919 aircraft.[69]

On 20 September 2023, Brunei's GallopAir said the C919 aircraft will undergo certification processes by Brunei's Department of Civil Aviation prior to delivery, which is forecasted to begin in the third quarter of 2024. Once certified, GallopAir would be the first operator of C919 outside of China and the first in Southeast Asia.[70]

From 12 to 17 December 2023, the C919 and ARJ21 conducted static displays at Hong Kong International Airport for the first time outside the Chinese mainland, and the C919 conducted a flight demonstration over Victoria Harbour on the 16th.[71][72]

2024

Thumb
Comac C919 on static display at the Singapore Airshow.
Thumb
Air China took delivery of its first C919 on 29 August 2024.

The C919 aircraft made its debut outside China, staging a fly-by at the pre-show of the 2024 Singapore Airshow.[73] Also at the airshow, Comac announced an order from Tibet Airlines for 40 C919s. The high-altitude variant ordered will have a shortened fuselage and strengthened landing gear for short-field performance.[74]

In May 2024, about one year after the commencement of passenger revenue service, B-919A, the first delivered Comac C919 airframe, was subjected to "A-inspection" tests, a series of "deep level" safety inspections lasting four days; the parts tested included the aircraft's engines, landing gear, and cabin equipment. The inspections were conducted by China Eastern Airlines Technology, a subsidiary of the group that also owns China Eastern Airlines. The aircraft passed the battery of inspections.[75]

The type's first commercial flight outside of mainland China occurred on 1 June 2024. A C919 operated by China Eastern Airlines was chartered to fly a group of students from Hong Kong to Shanghai for an exchange program.[76][77]

Overseas certificate recognition

On 4 January 2024, CAAC expressed its intent to work with EASA to validate the C919's airworthiness certificate for Europe.[78]

Variants

Summarize
Perspective

In production

C919-100 STD (Standard)

The standard variant of the C919 is designated "C919-100 STD". Equipped with CFM International LEAP-1C28 engines, each rated of 29,220 pounds (129.98 kN) of take off thrust (MTOT) and 127.93 kN of max continuous thrust (MCT).[79][80]

In September 2023, COMAC Chairman He Dongfeng revealed, however, that shortened and extended variants of the C919 would also be built, covering a range from 130 to 240 seats.[citation needed]

C919-100 ER (Extended Range)

The extended range variant of the C919 is designated "C919-100 ER". Equipped with CFM International LEAP-1C30 engines, each rated at 30,821 pounds (137.14 kN) of max take off thrust (MTOT), the max continuous thrust (MCT) is also slightly increased to 133.22 kN.[79] Together with other improvements to enable a higher max take off weight (MTOW).[80]

Noticeably the extended range capability is enabled by higher MTOW and potential structural strengthening, no auxiliary fuel tanks are fitted, therefore it remains the same fuel capacity as the standard (STD) version.[80]

Proposed

Extended fuselage

At its maximum, the extended fuselage variant would fit nearly 50 more passengers than the current variant, which can seat 156192 people.[81]

Shortened fuselage (High altitude)

On 17 December 2023, COMAC signed a deal with Tibet Airlines to jointly develop the high-altitude version of the jet in order to serve passengers in the Tibetan-Himalayan plateau.[82]

The shortened version of the C919 is anticipated to serve routes with high-altitude landing sites, with a typical seating range of 140 to 160 passengers.[83] It is designed to be capable of operating at all the high-plateau airports in China including the highest commercial airport in the world[83]Daocheng Yading Airport (ZUDC/DCY) at 14,472 feet, which is only served by specially modified Airbus A319-115/133 at this time.

Design

Summarize
Perspective

Configuration and performance

The dimensions of the C919 are quite similar to those of the Airbus A320; its fuselage is 3.96 metres (13.0 ft) wide and 4.166 metres (13.67 ft) high with a 12.915 square metres (139.02 sq ft) cross-section. This may allow for a common unit load device to be used for both aircraft. It has a 33.6 metres (110 ft) wingspan (35.4 metres (116 ft) with winglets).[84] The aircraft's intended payload capacity will be 20.4 tonnes. The design calls for cruise at Mach 0.785 (450 kn; 834 km/h) with an operating ceiling of 12,200 metres (39,800 feet). There will be two variants: the standard version with a 4,075 km (2,200 nmi; 2,532 mi) range, and a 5,555 km (2,999 nmi; 3,452 mi) extended-range version.[84] The C919 is a conservative design, deemed by analysts to be similar to the 30 year-old A320[41] and less efficient than the A320neo and 737 MAX.[85]

Construction

The center wing box, outer wing box, wing panels, flaps, and ailerons are planned to be built in Xi'an, China; the center fuselage sections are planned to be built in Hongdu, China.[86] Aluminium-lithium alloys account for 8.8% of the structure and composite materials for 12%.[87] The air frame will be made largely of aluminium alloy. Aircraft design and assembly is performed in Shanghai.[88]

Wings

Thumb

The wing is of a supercritical design, increasing aerodynamic efficiency by 20% and reducing drag by 8% compared to a non-supercritical wing.[89] The center wing box was originally intended to use carbon fibre composites.[8] It was changed later to an aluminium design to reduce design complications.[90]

Systems

Thumb
The air conditioning made by Liebherr

The engine's nacelle, thrust reverser and exhaust system will be provided by Nexcelle, with such features as an advanced inlet configuration, the extensive use of composites and acoustic treatment and an electrically operated thrust reverser.[91] Michelin will supply Air X radial tyres.[92] Its integrated modular avionics architecture is based on Ethernet.[41] The landing gear is made in China by a joint venture of Germany's Liebherr and AVIC's Landing Gear Advanced Manufacturing Corp: Liebherr LAMC Aviation.[47]

While the airframe is entirely made by AVIC, some systems are sourced from a wide variety of international suppliers, similar to Airbus and Boeing. Most such components are sourced from joint-ventures with foreign companies located within China: with UTAS for the electric power, fire protection and lighting; with Collins Aerospace for the cabin systems and avionics, with Thales for the IFE, with Honeywell for the flight controls, APU, wheels and brakes; with Moog for the high lift system; with Parker for the hydraulics, actuators and fuel systems, with Liebherr for the landing gear and air management.

Very few components, such as the CFM International LEAP engine and Nexcelle nacelle are entirely foreign imported.[93] It has been reported that COMAC is working on a plan to become more self-sufficient in terms of suppliers, with a long-term goal of replacing all US-export controlled components, due to American export restrictions affecting their ability to boost jet output.[94]

Engines

CFM International LEAP-1C

Thumb
LEAP-1C engine on the C919

Pratt & Whitney and CFM International each offered an engine for the aircraft in 2009, the PW1000G and the LEAP-1C, respectively;[95] the LEAP-1C was selected.[96]

The LEAP-1C family consists of two variants with different thrust ratings, LEAP-1C28 for the C919-100 STD and LEAP-1C30 for the C919-100 ER with higher MTOW. -1C30 has a slightly higher max take off thrust and max continuous thrust compared to the -1C28.[79]

In February 2020, Reuters reported that the US government was considering blocking GE from selling the LEAP-1C engine to Comac, citing concerns that its technology could be stolen and put into the CJ-1000A engine being developed by the Aero Engine Corporation of China, the competition the C919 could present for Boeing, and military use of technology.[97] Then-President Donald Trump tweeted opposition to blocking sales.[98] The US eventually granted GE a license to sell the engines in April 2020.[99]

However, the -1C has been called a LEAP “in name only” as it reportedly lacks many of the efficiency improvements of the other LEAP models used on the Airbus A320neo and Boeing 737 MAX. Experts believe that the LEAP-1C is actually an upgraded version of the prior-generation CFM56.[100]

ACAE CJ-1000A

The Aero Engine Corporation of China was tasked with developing an indigenous engine for the aircraft in 2009.[101] Assembly of the first CJ-1000A engine was completed in 18 months in December 2017. The planned entry into service was 2021.[102] The engine first ran in May 2018 to 6,600 rpm core speed.[103]

In March 2023, reports emerged that the flight test campaign for the CJ-1000A engine had started on a Xi'an Y-20 test aircraft.[104] According to Chinese media reports, AECC has said that it expects the CJ-1000 engine to be certified by 2025.[105]

Cabin

Seats

The cabin has a 3-3 seat layout, which is typical among this class of aircraft like the Airbus A320 or Boeing 737. The middle seat in each 3-seat row is designed to be 1.5 cm wider than the window and aisle seat to provide better comfort for the passenge sitting in the middle.[106]

Currently seats in both business class and economy class are solely supplied by Chinese seat maker Jiatai aircraft equipment Co.,Ltd of AVIC cabin systems (ACS). Jiatai JT220B in business and Jiatai JT220E in economy.[107] They both provide a wide range of different configuration choices for the customer, for example adjustable headrest, mobile device holder or USB socket.[107]

Supplier summary

More information Category, System ...
Category System Picture Supplier Remarks Country Product Source
Airframe Body AVIC China
Airframe Cabin seats AVIC Cabin Systems Jiatai China JT220B/E
Airframe Landing gear Liebherr LAMC Aviation (Changsha) Co., Ltd JV: Liebherr, AVIC Germany, China [108]
Airframe Main and nose wheel Honeywell Aerospace Technologies US [109]
Airframe Brakes Honeywell Aerospace Technologies US Carbenix [109]
Airframe Tyres Michelin France Air X radial [110]
Avionics Weather radar ALRAC JV: Collins Aerospace, AVIC LETRI US, China [111]
Avionics Communication and navigation avionics RCCAC JV: Collins Aerospace, CETCA US, China [112]
Avionics Air data system Honeywell Aerospace Technologies US [109]
Avionics Aircraft flight control system (AFCS) Honeywell Aerospace Technologies US [109]
Avionics Inertial reference system (IRS) Honeywell Aerospace Technologies US LASEREF IV [109]
Avionics In-flight entertainment system (IFE) Thales, CETCA JV: Thales, CETCA France, China TopSeries [113]
Avionics Air management system
Thumb
Liebherr air conditioning unit
Liebherr Germany [108]
Avionics Flight management system (FMS) AVIAGE Systems JV: GE Aerospace, AVIC US, China TrueCourse™ [114]
Avionics Flight recorder AVIAGE Systems JV: GE Aerospace, AVIC US, China [114]
Avionics Integrated standby instrument system (ISIS) AVIAGE Systems JV: GE Aerospace, AVIC US, China [114]
Avionics Onboard maintenance system AVIAGE Systems JV: GE Aerospace, AVIC US, China [114]
Avionics Remote interface unit AVIAGE Systems JV: GE Aerospace, AVIC US, China [114]
Power systems Engine
Thumb
CFMI LEAP-1C
CFM International JV: GE Aerospace, Safran US, France
Power systems Auxiliary power unit (APU) Honeywell Aerospace Technologies US HGT750 [109]
Close

Market

Summarize
Perspective

In 2012 the C919 order book stood at 380 units worth US$26 billion,[115] and averaging $68.4 million per unit. FlightGlobal's Ascend market values in 2013 were $49.2 million for the Airbus A320neo, 51% less than its $100.2 million list price and $51.4 million for the Boeing 737 MAX-8, 49% less than its $100.5 million list price.[116]

The Chinese airlines that have placed orders for the C919 already have either the Boeing 737 or Airbus A320 in their fleets.[117] In 2013, Chinese state-owned newspaper Global Times complained that an Aviation Week editorial about the bleak prospects for the aircraft "maliciously disparaged the future outlook for the C919".[118]

COMAC aims to take a fifth of the global narrowbody market and a third of the Chinese market by 2035.[6] It expects 2,000 sales until 2037.[119] The Financial Times commented that China considers the success of the plane a source of national pride.[120]

The newspaper also claimed in 2017 that the C919 was outdated by 10–15 years compared to the Airbus A320neo and Boeing 737 MAX 8, and would probably cost more to operate.[121] Its range of 2,200–3,000 nmi (4,100–5,600 km; 2,500–3,500 mi) fell short of the 3,400 and 3,550 nmi (6,300 and 6,570 km; 3,910 and 4,090 mi) of the A320neo and the 737 MAX 8; the C919 payload-range and economics were similar to the current single-aisles, but would not be able to compete with the Neo and Max.

In 2018, FlightGlobal forecast a total of 1,209 deliveries: 687 standard and 522 stretched variants, 85% of these in China.[35] As of December 2024, all 16 operational C919 had carried more than one million revenue passengers.[122]

Deliveries and orders

Summarize
Perspective

Production capacity

In January 2023, COMAC said it wanted to expand its production capacity to 150 airliners per year within five years.[123] In January 2025, the aircraft manufacturer stated that it hoped to deliver 30 planes in 2025 as it scales up its production, while expanding general production capacity to a volume of up to 50 units per year.[124]

Deliveries

The first C919 airframe intended for commercial service was delivered to launch customer China Eastern Airlines on 9 December 2022.[65] The second, third, fourth, and fifth airframes were delivered to China Eastern on 14 July 2023, 9 December 2023, 29 December 2023, and 2 March 2024 respectively, thereby completing China Eastern's initial order. A sixth aircraft was delivered to China Eastern Airlines on 28 May 2024.[125][126][127][128][129][130][131] The seventh and eighth aircraft for China Eastern Airlines were delivered to the company on 29 July 2024 and 30 September 2024 respectively.[132][133] Air China and China Southern Airlines both received their first C919 aircraft on 28 August 2024.[134][135]

More information Airline, Annual Total ...
Deliveries[136][137][133][1]
Airline 2022 2023 2024 2025
Air China 0 0 3 TBD
China Eastern Airlines 1 2 7 TBD
China Southern Airlines 0 0 3 TBD
Annual Total 1 2 13 TBD
Total 16
Close

Orders

At the November 2010 Zhuhai Airshow, Comac announced orders for 55 C919 aircraft from 6 airlines, with an additional 45 options. The purchasing airlines or lessors included China Eastern Airlines, Air China, Hainan Airlines, China Southern Airlines, CDB Leasing Company, and GE Capital Aviation Services.[138] On 19 October 2011, Chinese ICBC Leasing ordered 45 C919s and agreed to be the launch customer.[139] On 11 November 2014, Comac announced at the 2014 Zhuhai Airshow that China Merchants Bank's aircraft leasing division made a firm commitment for 30 C919s, and that total orders were now up to 450 aircraft.[140]

At the June 2015 Paris Air Show, Ping An Leasing signed a letter of intent (LOI) for 50 C919s, becoming one of Comac's largest customers, and Puren Group signed a letter of intent for seven C919s and seven ARJ21s, intended for the start-up Puren Airlines.[141] In November 2016 COMAC received an order for 20 C919s including 5 firm from Shanghai Pudong Development Bank Financial Leasing and for 36 C919s from CITIC Group Financial Leasing including 18 firm.[142] While no down payments for the order were needed before C919's maiden flight, 500,000 yuan ($76,000) nevertheless were deposited subsequently for each of the firm order.[143] The 5 December 2017 ICBC Leasing order for 55 brought the order book to 785.[144]

In February 2018, the total order book for the C919 stood at 815, prior to the order for 200 from HNA Group in June 2018 which also included an order for 100 ARJ21s.[145] By August 2018, FlightGlobal counted 305 orders plus 45 options and 658 LOIs: 1008 commitments.[35]

In January 2023, COMAC reported having received more than 1,200 orders.[123] In September 2023, it was reported, however, that C919 orders had reached 1,061.[146]

On 20 September 2023, Brunei GallopAir placed an order worth US$2 billion for 15 units of C919 and 15 units of ARJ21 jets. Once completed, this would make Brunei GallopAir the first non-Chinese & Southeast Asian operator of C919.[147] In a stock exchange filing on 26 April 2024, Air China said that it had ordered 100 C919 aircraft, which would be delivered between 2024 and 2031, thereby adding another high-profile customer for the narrowbody programme.[146]

On 21 November 2024, Chairman of Hong Kong Airlines, Yan Bo was reported to have told Hong Kong-based media that the airline is in plans of acquiring Comac's C919 aircraft following 12 months of sustained fleet growth and the resumption of long-haul flights especially to North America.[148]

More information Customer, Orders ...
Orderbook[149]
Customer Orders Options
ABC Financial Leasing6510
AerCap20
Air China100[150]15
AVIC International Leasing1515
Bank of Communications Financial Leasing30
BOC Aviation20
Brunei GallopAir15
CCB Financial Leasing50
CDB Leasing10
China Aircraft Leasing Co.20
China Eastern Airlines105[151]15[152][153]
China Huarong Financial Leasing30
China Southern Airlines10515
Citic Financial Leasing18
Hainan Airlines60[154]
Hebei Airlines20
Huabao Leasing1515
ICBC Financial Leasing100
Industrial Bank20
Joy Air20
Nuclear Construction Financial Leasing2020
Ping An Leasing50
Sichuan Airlines20
Suparna Airlines30
SPDB Financial Leasing515
Tibet Airlines40[74]
Total1003120
Close

Potential buyers

More information Customer, Firm orders ...
Orders
Customer Firm
orders
Options
LOI/MOU
All Date
Total Linhas Aéreas[155]
Close

Cancelled orders

More information Customer, Firm orders ...
Orders
Customer Firm
orders
Options
LOI/MOU
All Date
Puren Group[156] 7 7 17 June 2015
City Airways[b][158] 10 (MOU)10 16 September 2015
Close

Operators

More information Airline, Country ...
Airline Country Photo Deliveries Model Refs
Air China China Thumb 3 C919-100 ER[159] [134]
China Eastern Airlines China Thumb 10 C919-100 STD[citation needed] [133]
China Southern Airlines China Thumb 3 C919-100 STD[citation needed] [134]
Close

Specifications

More information Variant, C919-100 STD ...
Variant C919-100 STD C919-100 ER
Cockpit crew 2 pilots
Seats 158 ((8J + 150Y)) to 192 (1-class HD)[160]
Cargo capacity 45.2 m3 (1,600 cu ft)
Length 38.9 m (127 ft 7 in)
Wingspan 35.8 m (117 ft 5 in)
Wing area 129.15 m2 (1,390.2 sq ft)
Height 11.95 m (39 ft 2 in)
Fuselage height 4.166 m (13 ft 8.0 in)
Fuselage width 3.96 m (13 ft 0 in)
Maximum payload 18,900 kg (41,700 lb)
OEW 45,700 kg (100,800 lb)
MTOW 75,100 kg (165,600 lb) 78,900 kg (173,900 lb)
Fuel capacity 24,917 L (6,582 US gal)
Engines (×2) CFMI LEAP-1C28 CFMI LEAP-1C30
Fan diameter 78 in (198 cm)
Max. takeoff thrust 130.0 kN (29,220 lbf)[79] 137.1 kN (30,821 lbf)[79]
Max. cont. thrust 127.93 kN (28,760 Ibf)[79] 133.22 kN (29,949 Ibf)[79]
Cruise Mach .785 (453 kn; 838 km/h; 521 mph)
Range (STD PL) 4,139 km (2,235 nmi; 2,572 mi) 5,576 km (3,011 nmi; 3,465 mi)
Ceiling 12,100 m (39,800 ft)[161]
Takeoff (MTOW, ISA) 2,052 m (6,732 ft) 2,125 m (6,972 ft)
Close

See also

Related development

Aircraft of comparable role, configuration, and era

Related lists

Notes

  1. This count includes only the number of airframes delivered to customers plus the 6 airframes produced for the program's airworthiness campaign. It does not include test articles and airframes in various stages of production and tests.