British Rail Class 350

British electric passenger train From Wikipedia, the free encyclopedia

British Rail Class 350

The British Rail Class 350 Desiro is a class of electric multiple unit passenger train built by Siemens Transportation Systems to its Desiro design between 2004 and 2014. All 87 are now operated by West Midlands Trains, having previously been operated by Central Trains, Silverlink, Southern, London Midland, First TransPennine Express and TransPennine Express.

Quick Facts British Rail Class 350 Desiro, In service ...
British Rail Class 350
Desiro
Thumb
2 London Northwestern Railway Class 350s at Milton Keynes Central
Thumb
Refurbished standard-class interior of a Class 350/1 unit
In serviceJune 2005  present
ManufacturerSiemens Transportation Systems
Built at
Family nameDesiro
Replaced
Constructed
  • 2004–2005 (350/1)[3]
  • 2008–2009 (350/2)[4]
  • 2013–2014 (350/3 and /4)[5]
Refurbished2023- (350/3)[6]
Number built87
Number in service80
Successor
Formation4 cars per unit[3]
Fleet numbers
  • 350101–350130
  • 350231–350267
  • 350368–350377
  • 350401–350410
Capacity
  • First class: 24 seats
  • Standard class: 206–246 seats
  • plus 117–149 standees[7]
Owners
OperatorsLondon Northwestern Railway
DepotsKings Heath (Northampton) Bletchley (Milton Keynes)
Specifications
Car length20.34 m (66 ft 9 in)
Width2.80 m (9 ft 2+14 in)
DoorsSliding plug[10]
Maximum speed110 mph (180 km/h)
Weight175 tonnes (172 long tons; 193 short tons)[3]
Traction systemSiemens SIBAS32 IGBT-VVVF
Traction motors
Power output
  • 250 kW (335 hp) per motor
  • 2,000 kW (2,680 hp) total
Electric system(s)
Current collector(s)
BogiesSiemens SGP SF5000[10]
Braking system(s)Disk, regenerative[10]
Safety system(s)
Coupling systemDellner 12[11]
Multiple workingWithin class
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Notes/references
Sourced from [8] unless otherwise noted.
Close

Description

Summarize
Perspective
Thumb
The neutral colour scheme interior of the Class 350/1

The Class 350/1 units were originally part of an order for 32 five-car Class 450 units for South West Trains. However, they were never built as such. Of the 160 carriages ordered, 40 were diverted as an additional 10 four-car Class 450 units, and the remaining 120 were modified as 30 four-car Class 350/1 units.[citation needed] These entered service in 2005 and were used jointly by Central Trains and Silverlink, both owned by National Express. The top speed of the fleet was originally 100 mph (160 km/h), but all 350/1s were modified to allow 110 mph (180 km/h) running from December 2012, in order to make better use of paths on the busy West Coast Main Line.[12][13]

In late 2007, a second batch of 37 was ordered by London Midland to replace its Class 321s.[14] Designated as Class 350/2 units, they entered service between 2008 and 2009. Class 350/2s differ from the Class 350/1 units in two key aspects: having 3+2 seating in standard class (because they work short-hop commuter services; the Class 350/1 used for longer distance services are 2+2 throughout[3]:40[15] and lack the dual-voltage capability of the 350/1. Initially, Class 350/2 units had a maximum speed of 100 mph (160 km/h), but the fleet was upgraded to allow 110 mph running during 2018.[16] This was to allow the operators to run mixed 350/1 and 350/2 services without causing delays, especially important given the capacity changes which HS2 works at London Euston were expected to cause.[17]

Between 2013 and 2014, a further 20 were manufactured for London Midland and First TransPennine Express. Each took on ten units, the former designated the Class 350/3 and the latter the Class 350/4.

Class 350 trains are nearly identical to those of Class 450. The latter class is only fitted with traction equipment for Southern Region 750 V DC third rail, whilst the Class 350/1 units can operate from either 25 kV 50 Hz AC OLE, as is done in regular service, or alternatively third rail.[3] This dual-voltage capability was utilised when several units were leased to Southern in 2009, in order to cover for similarly equipped Class 377/2 units temporarily sub-leased to First Capital Connect.[18][19] All Class 350 units built since are not equipped for third-rail use but, like most modern British EMUs, can be retrofitted if necessary.

Every set of doors has its own set of guard-operated door controls behind a lockable panel. The cabs have three radio systems - Cab Secure Radio (CSR), National Radio Network (NRN), and the newest system, GSM-R. CCTV and dot-matrix destination screens are fitted throughout the train.

Current operation

West Midlands Trains

All of London Midland's 77 Class 350s were inherited by West Midlands Trains on 9 December 2017. WMT operate all of the units primarily under its London Northwestern Railway brand,[citation needed] however some units also run routes under the West Midlands Railway brand on the Chase Line.[20] A further 10 were transferred from TransPennine Express in 2019–20.[21]

The fleet is based at the purpose-built Kings Heath depot at Kingsthorpe, which opened in June 2006.[22] In May 2021, they took over services on the Abbey line from Class 319s.[23]

The first Class 350/2s were sent off lease in October 2024.[24]

Former operations

Summarize
Perspective
Thumb
Class 350 at London Euston. The first order of Class 350 units were delivered in a neutral grey and blue livery, as they were operated by both Central Trains and Silverlink.

Central Trains and Silverlink shared the 30 Class 350/1 units from 2005 to 2007. They were operated as a common user fleet in a neutral grey and blue livery.[25]

They first entered service in June 2005 with Central Trains.[15][26] These operated on services between Birmingham and Northampton via Coventry, and all Birmingham - Liverpool services, replacing Class 170s. Later on, the units also took over some peak services between Birmingham and Walsall.

Silverlink began operating the fleet in June 2005 between London Euston, Milton Keynes Central and Northampton.[27]

The Central Trains and Silverlink franchises expired in November 2007.

London Midland

Thumb
London Midland Class 350 arrives at Watford Junction

Once the Central Trains and Silverlink franchises expired, the entire Class 350 fleet transferred to London Midland with the West Midlands franchise.

As part of the franchise agreement, London Midland ordered 37 additional Class 350s.[14] On 8 October 2008, the first of these was handed over to Porterbrook and carried invited guests around the Wildenrath Test Track.[4] The first ten 350/2 units entered service in December 2008[4] and the final unit was officially delivered to London Midland on 30 July 2009.[28] In addition to the existing operations, these units took over the new Crewe - London Euston service running via Stoke-on-Trent and stopping at most of the Trent Valley line stations.

Several Class 350/1 units were subleased to Southern in 2009, to provide cover for Class 377/2 units subleased to First Capital Connect, themselves to cover for delays in the construction of the Class 377/5 fleet.[18] All were returned within the year.[19]

A further 10 four-car units were built later on in the franchise to provide additional capacity,[5][29] entering service from October 2014 as Class 350/3s.

First TransPennine Express / TransPennine Express

Thumb
TransPennine Express Class 350 at Glasgow Central

In 2013, ten Class 350/4 units were introduced for First TransPennine Express services between Manchester and Edinburgh / Glasgow, coinciding with the completion of the electrification of the eastern section of the Manchester to Liverpool via Newton-le-Willows line.[5][30] The first First TransPennine Express Class 350/4 services ran on 30 December 2013 between Manchester Piccadilly and Glasgow Central.[31] The introduction of these units allowed most services on the Manchester to Scotland route to be operated using EMUs, displacing the Class 185s which were cascaded to other routes to enhance capacity.[30] The units were based at Siemens' existing Ardwick depot in Manchester, with the government providing funding for the required electrification.[32]

Following the transfer of the franchise to TransPennine Express (itself still a FirstGroup company) in 2016, 12 Class 397 Civity units were ordered to replace the Class 350s on TransPennine North West services. All ten moved to West Midlands Trains, in 2019 and 2020.[21]

Future

London Northwestern Railway has said it will be replacing the Class 350/2 units with Class 730 Aventras.[33] In October 2018, Porterbrook, which owns the Class 350/2 units, announced that it was considering to convert them into battery electric multiple units for potential future cascades to non-electrified routes.[34][page needed][35]

Fleet details

The Class 350/1s, 350/3s and 350/4s are owned by Angel Trains,[8] and the Class 350/2s are owned by Porterbrook.[9]

More information Class, Operator ...
Class Operator No. Built Year Built Unit nos. Standard class seating Notes
350/1 London Northwestern Railway 30 20042005 350101350130 2+2[36] Dual voltage
350/2 30 20082009 350232350235, 350237350238, 350239, 350241350243, 350246350250, 350252, 350254350267 3+2[24]
Stored 7 350231, 350236, 350240, 350244350245, 350251, 350253[37]
350/3 London Northwestern Railway 10 2014 350368350377[38] 2+2
350/4 10 20132014 350401350410[38] 2+2
Close

Named units & Special liveries

In May 2023, unit 350104 was decorated with special Eurovision Song Contest 2023 livery.[44]

Accidents and incidents

Summarize
Perspective

In 2005, units 350105 and 350108 were damaged after colliding with a falling tree. Both were returned to Germany for repairs.[45]

On 11 April 2011, a fire broke out in a toilet cubicle on unit 350232, following an explosion, while working the 16:25 from Northampton to London Euston, as it approached Leighton Buzzard, resulting in the death of the female occupant of the toilet. Her death turned out to be suicide, as she carried a can of petrol into the toilet and locked the door. All other passengers and the train crew escaped unharmed.[46]

On 16 September 2016, unit 350264 struck a landslide at the entrance to Watford Tunnel and derailed. It was then hit by unit 350233 travelling in the opposite direction. Two people were injured and unit 350264 was severely damaged. The leading carriage of unit 350233 was severely damaged, and all four carriages were damaged along one side.[47] The consequences were not as serious as they could potentially have been because the derailed train was fortuitously kept from diverging too far from its line by equipment on the bottom of the train catching on the rail, meaning unit 350233 struck only a glancing blow.[48] On 10 November 2016, unit 350264 was moved to Germany by low-loader,[49] followed later by 350233. Both re-entered service in early 2018.[50]

Notes

  1. 350/1, 350/2 DMSO and 350/2 Assembly[1]
  2. 350/2 TCO & 350/2 PTSO[1]
  3. 350/3 & 350/4[2]

References

Further reading

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.