Milan Metro Line 4
Metro line in Milan, Italy From Wikipedia, the free encyclopedia
Metro line in Milan, Italy From Wikipedia, the free encyclopedia
Line 4 is an underground rapid transit line in Milan, Italy, part of the Milan Metro. The line color is blue. The first section opened on 26 November 2022[2] and as of 2023 it is 7.3 km (4.5 mi) long with 8 stations.[3] The full line opened on 12 October 2024[3] The line is 15.2 km (9.4 mi) long with 21 stations.[4]
M4 | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Locale | Milan, Italy | ||
Connecting lines | |||
Stations | 21 | ||
Website | Official website | ||
Service | |||
Type | Rapid transit | ||
System | Milan Metro | ||
Operator(s) | Azienda Trasporti Milanesi | ||
Rolling stock | Hitachi Rail Italy Driverless Metro | ||
Daily ridership | 40,000 (July 2023-February 2024)[1] | ||
History | |||
Opened | 26 November 2022 (first phase) | ||
Last extension | 12 October 2024 (full line) | ||
Technical | |||
Line length | 15.2 km (9.4 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 750 V DC third rail | ||
|
The line features automatic driverless trains[5] and is designed for a capacity of 24–28,000 passengers per hour in each direction.[6] The expected annual ridership is 87 million.
The first three stations of the line (Linate-Repetti-Forlanini) was originally planned to be completed in 2015, as part of the works for the Milan Expo. However, delays in planning, financing[7] and construction works forced to postpone the opening, with the first section opening on 26 November 2022[2][8] and the rest of the line expected to open by 2023.[9] Once completed, the line will be 15 km (9.3 mi) long with 21 stations, compared to its current 8 operational stops. The remaining 13 stops opened on 12 October 2024.[10]
The consortium ATM-Webuild is responsible for the construction works.[11][12]
Of the total estimated cost of about €1.7 billion, the Government of Italy will cover €786 million via a grant, the municipal government of Milan will cover €400 million, and €512 million will be funded by private investors.[11]
The line is planned to connect the south-western neighborhood of Lorenteggio with Linate Airport on the east, passing through the city center. All stations are underground.
Station Name | Transfer | Opening |
---|---|---|
San Cristoforo FS | 12 October 2024[10] | |
Segneri | ||
Gelsomini | ||
Frattini | ||
Tolstoj | ||
Bolivar | ||
California | ||
Coni Zugna | ||
Sant'Ambrogio | ||
De Amicis | ||
Vetra | ||
Santa Sofia | ||
Sforza-Policlinico | (Missori) | |
San Babila | 4 July 2023 | |
Tricolore | ||
Dateo | 26 November 2022[2] | |
Susa | ||
Argonne | ||
Stazione Forlanini | ||
Repetti | ||
Linate Aeroporto |
The line uses Hitachi Rail Italy Driverless Metro automatic driverless trains.[5] The line will be operated by 37 four-car EMUs manufactured by Hitachi Rail Italy at Reggio Calabria. Because of production problems caused by the COVID-19 pandemic, some were sent to Hitachi Newton Aycliffe in England for final fitting out.[13]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.