Milan Metro Line 1

Subway line serving Milan, Italy From Wikipedia, the free encyclopedia

Milan Metro Line 1

Line 1 (Linea Uno in Italian) is the first underground rapid transit line built in Milan, Italy. It is part of the Milan Metro and it is operated by ATM. Works on the line began in 1957, and the first part was opened on 1 November 1964,[4][5] running from Sesto Marelli to Lotto station. The line is also called Red Line (Linea Rossa in Italian), as it is visually identified by red signs. Due to its premiership, the line gave its red color to the Milan Metro logo.

Quick Facts M1, Overview ...
M1
Thumb
Thumb
Cordusio station
Overview
Statusoperational
LocaleMilan, Italy
Termini
Connecting lines
Stations38[1]
Service
TypeRapid transit
SystemMilan Metro
Operator(s)Azienda Trasporti Milanesi
Depot(s)Gallaratese, Precotto
Rolling stock63 trains:[2]
UdT (various series)
AnsaldoBreda Meneghino
AnsaldoBreda Leonardo [it]
Daily ridership500,000[3]
History
Opened1 November 1964 (1964-11-01)
Technical
Line length27 km (17 mi)[1]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC fourth rail or overhead catenary (overground depots only)
Route map
Thumb
Close

Route

Summarize
Perspective

The line runs underground from the northern suburb of Sesto San Giovanni to the city centre, then to the western district with two different branches, one northwest to Rho, the other to the west to Bisceglie. It is 27 km (17 mi) long and serves 38 underground stations.[6]

Key points served by the line are Duomo, considered the center of Milan; Castello Sforzesco (with Cairoli station); Cadorna, one of the busiest stations in Milan and in Italy; Corso Buenos Aires (with stations Porta Venezia, Lima and Loreto), an important shopping street; and Rho Fiera, one of the largest fairgrounds in the world.[7]

More information Station Name, Transfer ...
Station Name Transfer Branch Opening
Sesto I Maggio Main route 28 September 1986
Sesto Rondò
Sesto Marelli 1 November 1964
Villa San Giovanni
Precotto
Gorla
Turro
Rovereto
Pasteur
Loreto
Lima
Porta Venezia
Palestro
San Babila
Duomo
Cordusio
Cairoli
Cadorna

Conciliazione
Pagano
Buonarroti Rho Fieramilano branch 1 November 1964
Amendola
Lotto
QT8 8 November 1975
Lampugnano 12 April 1980
Uruguay
Bonola
San Leonardo
Molino Dorino 28 September 1986
Pero 19 December 2005
Rho Fieramilano
Wagner Bisceglie branch 2 April 1966
De Angeli
Gambara
Bande Nere 18 April 1975
Primaticcio
Inganni
Bisceglie 21 March 1992
Close

History

Thumb
The mezzanine floor of the Amendola station just before opening in 1964.
Thumb
The San Babila station's poster during the 1960s.

On 6 April 1952 the city administration asked for a project of a metro system and on 6 October 1955 a new company, Metropolitana Milanese, was created to manage the construction of the new infrastructure.[8] The project was funded with 500 million from the municipality and the rest from a loan. The construction site of the first line was opened in viale Monte Rosa on 4 May 1957.[8] Stations on the new line were designed by Franco Albini-Franca Helg architecture studio. Bob Noorda designed the famous wayfinding and signage system.[8]

At first, stations were designed without the mezzanine floor. However, these were added to the final design to allow street crossing and the use of gates to collect tickets.

The line from Lotto to Sesto Marelli (21 stations) opened on 1 November 1964, after seven years of construction works.[9]

Rolling stock

There are 3 types of trains running on the line: revamped original trains, the "Meneghino" trains, and the "Leonardo [it]" trains.

The original first series trains were phased out between 2014 and 2015. The track gauge is the 1,435 mm (4 ft 8+12 in) standard gauge. The entire line is electrified by means of a third or fourth rail at 750 V DC.[10]

Among the 63 trains running on the line, 20 entered service between 1964 (opening of the line) and 1970. Those trains were replaced by the "Meneghino" trains,[2] and more were replaced by the "Leonardo" trains. Subsequently, the original first series trains were retired and dismantled.[11] These new trains fully replaced the older, non-upgraded series still operating on Line 1.

On November 17, 2024, the first of 21 "Galileo" trains produced by Hitachi Rail at the Reggio Calabria plant was delivered for Line 1.[12][13][14] These trains are set to completely replace the refurbished original sets. Their entry into service is scheduled for 2025.[12]

Extension

An extension towards the north from Sesto Primo Maggio to Monza Bettola is currently under construction. It is expected to be completed by 2023.[15] The new section will be 1.9 km (1.2 mi) long with 2 stations (Sesto Restellone and Monza Bettola), entirely underground. The total cost will be €206 million.[16]

More information Station Name, Transfer ...
Station Name Transfer Grade
Sesto Restellone Underground
Monza Bettola Underground
Close

An extension of the western branch from Bisceglie towards the city limits has been approved. The new stations will be located at Baggio, via Valsesia and at Quartiere Olmi. The national government will provide €210 million, while the total cost is estimated at €350 million.[17]

More information Station Name, Transfer ...
Station Name Transfer Grade
Valsesia Underground
Baggio Underground
Quartiere Olmi Underground
Close

Notes

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.