Line 2 of the Chengdu Metro (Chinese: 成都地铁2号线; pinyin: Chéngdū Dìtiě Èr Hào Xiàn) is the second line on the metro network in Chengdu, Sichuan. Line 2 is a crosstown northwest-southeast trunk route. This line serves the Chengdu East railway station. Line 2 began operation on September 16, 2012.[3] An 11 km long mostly elevated extension to Longquanyi began testing in April 2014 opened in October 2014.[4]

Quick Facts Overview, Status ...
Line 2
2
Train of Line 2 at Xipu station
Overview
StatusOperational
OwnerChengdu
LocaleChengdu, China
Termini
Stations32
Service
TypeRapid transit
SystemChengdu Metro
Services1
Operator(s)Chengdu Metro Limited
Daily ridership927,200 (2018 Peak)[1]
History
Opened16 September 2012; 12 years ago (2012-09-16)
Technical
Line length42.32 km (26.30 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Hongguang depot
← Wangcongci
Lanjiagou →
Xipu 6 Chengdu–Dujiangyan intercity railway
Tianhe Road Line 2 (Chengdu Tram)  T2 
Baicao Road
Jinzhou Road 9
← Outer
Inner →
Jinke Road North
Chengdu Western ring railway
Yingbin Avenue
Chadianzi Bus Terminal Bus interchange
Yangxi Flyover
Yipintianxia 7
← Outer
Inner →
East Shuhan Road
Baiguolin
← Huilong
Huagui Road →
Chengdu University of TCM &
Sichuan Provincial People's Hospital
4 5
Tonghuimen
People's Park
Tianfu Square 1
← Science City/Wugensong
Weijianian →
Chunxi Road 3
← Shuangliu West station
Chengdu Medical College →
Dongmen Bridge
Niuwangmiao 6
← Lanjiagou
Wangcongci →
Niushikou
Dongda Road 8
← Lianhua
Shilidian →
Tazishan Park
East Chengdu Railway Station 7
← Inner
Outer →
Chengdu East Express train
Chengyu Flyover
Huiwangling
Honghe
Chengdu Academy
of Governance
9
← Inner
Outer →
Hongliu depot
Damianpu
Lianshanpo
Jiepai
Shufang
Longping Road
Longquanyi
Close
Cross-platform interchanges between different train categories in Xipu station, Chengdu. The double track of Line 2 of Chengdu Metro is in the middle, while the double track of National rail transport system (Chengdu–Dujiangyan intercity railway) is on both sides, respectively. It is the first implementation of Cross-platform interchanges between different train categories in China.[2]

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Chadianzi Bus Terminal — Chengdu Institute of Public Administration 16 September 2012 22.4 km (13.92 mi) 20 Phase 1
Xipu — Chadianzi Bus Terminal 8 June 2013 8.8 km (5.47 mi) 6 Phase 2 (eastern section)
Chengdu Institute of Public Administration — Longquanyi 26 October 2014 11.1 km (6.90 mi) 6 Phase 2 (western section)
Close

Stations

More information Service routes, Station № ...
Service
routes
Station

Station name Connections Distance
km
Location
English Chinese
02 32 Xipu 犀浦 6  CG  0.00 0.00 Pidu
02 31 Tianhe Road 天河路  T2  1.85 1.85
02 30 Baicao Road 百草路 1.65 3.50
02 29 Jinzhou Road 金周路  9  2.20 5.70 Jinniu
02 28 Jinke Road North 金科北路 1.15 6.85
02 27 Yingbin Avenue 迎宾大道 1.05 7.90
02 26 Chadianzi Bus Terminal 茶店子客运站 0.90 8.80
02 25 Yangxi Flyover 羊犀立交  27  1.50 10.30
02 24 Yipintianxia 一品天下 7 0.85 11.15
02 23 East Shuhan Road 蜀汉路东 1.10 12.25
02 22 Baiguolin 白果林 1.25 13.50
02 21 Chengdu University of TCM &
Sichuan Provincial People's Hospital
中医大·省医院 4 5 1.15 14.65 Qingyang
02 20 Tonghuimen 通惠门 0.85 15.50
02 19 People's Park 人民公园  10   17  0.85 16.35
02 18 Tianfu Square 天府广场 1 0.95 17.30
02 17 Chunxi Road 春熙路 3 1.40 18.70 Jinjiang
02 16 Dongmen Bridge 东门大桥 0.95 19.65
02 15 Niuwangmiao 牛王庙 6 0.80 20.45
02 14 Niushikou 牛市口 Chengdu BRT Chengdu BRT 1.60 22.05
02 13 Dongda Road 东大路 8 0.60 22.65
02 12 Tazishan Park 塔子山公园 1.15 23.80
02 11 East Chengdu Railway Station 成都东客站 7 Chengdu East railway station ICW 1.65 25.45 Chenghua
02 10 Chengyu Flyover 成渝立交 0.80 26.25
02 09 Huiwangling 惠王陵  30  1.60 27.85 Longquanyi
02 08 Honghe 洪河 0.95 28.80
02 07 Chengdu Academy of Governance 成都行政学院  9  1.50 30.30
02 06 Damianpu 大面铺 3.20 33.50
02 05 Lianshanpo 连山坡 1.25 34.75
02 04 Jiepai 界牌 1.25 36.00
02 03 Shufang 书房 1.85 37.85
02 02 Longping Road 龙平路 1.90 39.75
02 01 Longquanyi 龙泉驿 1.70 41.45
Close

Est. Completion

More information Est. Completion, Phase # ...
Est. Completion Phase # Starting station/Ending station Length (KM) stations
2012-9 Phase 1Chadianzi Bus TerminalChengdu Institute of Public Administration22.4720
2012-12 (opened on June 1, 2013) Phase 2 - West ExtensionXipuChadianzi Bus Terminal8.7386
2014-12 Phase 2 - East ExtensionChengdu Institute of Public AdministrationLongquanyi11.16
Close

References

Wikiwand in your browser!

Seamless Wikipedia browsing. On steroids.

Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.

Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.