Loading AI tools
Planned commuter rail line in Mexico From Wikipedia, the free encyclopedia
El Insurgente (transl. The Insurgent), formerly called the Toluca–Mexico City commuter rail (Spanish: Tren Interurbano de Pasajeros Toluca-Valle de México) project is a 57.7 km (35.9 mi) commuter rail line between the State of Mexico and Mexico City that is partially operational. Also known as Interurban Train Mexico City–Toluca, the passenger railway line will connect the cities of Toluca and Mexico City. The project was announced by President Enrique Peña Nieto on 1 December 2012,[3] and construction began in 2014.
El Insurgente | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Mexico City and State of Mexico | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 7 (5 opened, 2 planned) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | trenelinsurgente | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Commuter rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | September 15, 2023 (Zinacantepec–Lerma) August 31, 2024[1] (Lerma–Santa Fe) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Extended (planned) | December 2024[2] (Santa Fe–Observatorio) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 57.7 km (35.9 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Overhead lines | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 160 km/h (99 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
On 1 September 2023, it was announced that the interurban train would bear the name of El Insurgente, after Miguel Hidalgo.[4] On 15 September 2023, the first section from Zinacantepec to Lerma opened, with four trains initially running on the section.[5] On 31 August 2024, the second section from Lerma to Santa Fe inaugurated.[6][7] The opening of the entire line is expected in 2024.
As a part of then-President Enrique Peña Nieto's plan to offer public transport from Toluca to Mexico City, a cost–benefit analysis report was drafted and published in November 2013.[8]: 1 The report proposed several routes. The three routes were concentrated to the metro terminals of Cuatro Caminos, Tacubaya, and Observatorio.[8]: 45 Ultimately, the third route along Avenida Las Torres to Observatorio was chosen in order to avert future sprawl, avoid deforestation in the Sierra de las Cruces, and prevent pollution of aquifers that supply water to residents.[8]: 11 and 12 A section of the chosen route was altered by 4.3 km (2.7 mi) in October 2015 to no longer run above Avenida Vasco de Quiroga in Cuajimalpa.[9]
The railway line will be electrified and elevated with a tunnel portion between the State of Mexico and Mexico City.[8]: 18 [10] There are six stations planned. Four stations will be located in the State of Mexico and the remaining two will be located in Mexico City.[11] The line is designed to complement the Mexico City Metro by terminating at Observatorio station of Line 1 and provide heavy railway service to the Santa Fe business district.[8]: 13 [11][12] A shuttle will provide connection to Toluca International Airport at the Metepec station (formerly named Tecnológico). The commuter line will run parallel to Avenida Las Torres and Mexican Federal Highway 15/Mexican Federal Highway 15D.[11] The total cost of the project was estimated at $38.6 billion MXN in 2014.[10]
The Secretariat of Communications and Transportation (SCT) divided the project into three sections for contractors to bid on:
For its rolling stock, Spanish manufacturing company CAF was awarded a contract in 2014 to construct 30 EMUs for $11.6 billion MXN (€690 million).[16] Each EMU will have five cars, have a capacity of 700 passengers, and operate at a maximum speed of 160 km/h (99 mph).[17] Deliveries for the trainsets began in January 2017.[18]
The train depot will be located west of Zinacantepec station at a cost of MXN942 million. The contract was awarded to a consortium in March 2016.[19]
In July 2014, a formal ceremony was carried out by the head of SCT, Gerardo Ruiz Esparza, to mark the start of construction.[20]
There have been several construction accidents during the project. On 4 May 2016, the temporary support structures gave way, causing the concrete decking to collapse near the intersection of Avenida Las Torres and Avenida Colón in Toluca.[21] On 2 June 2016, bad weather caused concrete-reinforced rebar to fold onto traffic near the intersection of Avenida Las Torres and Avenida Díaz Mirón in Toluca.[22] On 7 July 2016, a work site caved in killing one worker and injuring two.[23] On 16 July 2016, a construction worker was killed when a truck lost control and struck the worker on a construction site in Metepec.[24]
In July 2019, the SCT determined the project's completion would be delayed to the end of 2022.[25] Javier Jiménez Espriú, head of the SCT, announced the project was 87% complete, however, there have been cost overruns from $42.72 billion MXN in 2015 to $73.72 billion MXN in 2019.[26] President Manuel Lopez Obrador inaugurated the opening of Section 1 of the rail line in September of 2023, but since the train runs only through stations in Toluca and does not run through to Mexico City, ridership was exceptionally low as of December 2023.[27]
No. | Pictogram | Station[lower-alpha 1] | Level | Connection | Location | Date opened | |
---|---|---|---|---|---|---|---|
01 | Zinacantepec | Elevated level, overground access |
|
Toluca | México | 15 September 2023 | |
02 | Toluca Centro |
| |||||
03 | Metepec |
|
Metepec | ||||
04 | Lerma |
|
Lerma | ||||
05 | Santa Fe |
|
Cuajimalpa de Morelos | Mexico City | 31 August 2024[28][29] | ||
06 | Pending opening |
Vasco de Quiroga |
(at distance) |
Álvaro Obregón | Expected December 2024[30][31] | ||
07 | Observatorio |
|
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.