Anzac railway station
Rapid transit station in Melbourne, Victoria, Australia From Wikipedia, the free encyclopedia
Rapid transit station in Melbourne, Victoria, Australia From Wikipedia, the free encyclopedia
Anzac railway station is a rapid transit railway station on the Cranbourne, Pakenham and Sunbury lines, serving the Melbourne CBD in Victoria, Australia. When opened as part of the Metro Tunnel project, Anzac will be an underground premium station, featuring an island platform with two faces. The station will connect directly to the Anzac tram interchange at street level. Major construction commenced in April 2018, and was completed in September 2024, with minor finishing works to continue until its opening in 2025.[1][2]
Anzac | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Future PTV rapid transit station | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | St Kilda Road Melbourne, Victoria 3004 City of Melbourne Australia | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 37°49′59″S 144°58′20″E | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owned by | VicTrack | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operated by | Metro Trains (projected) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line(s) | Sunshine–Dandenong | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Connections |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | Yes—step free access | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Under construction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Fare zone | Myki Zone 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | Anzac station | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opening | 2025 (scheduled) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrified | Yes (1500 V DCoverhead) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Originally announced under the working title of Domain, after the nearby Kings Domain, following a naming competition the station was named Anzac for the nearby Shrine of Remembrance and in honour of the Anzac spirit of "service and sacrifice".[3] Construction on the station commenced in 2018 using the cut-and-cover method.[4][5] The station will provide a direct platform transfer to services on the busy tram corridor along St Kilda Road and will provide access to the nearby Royal Botanic Gardens and Albert Park.
Anzac station is being built below St Kilda Road in Melbourne, and is planned to feature four entrances.
The station will also feature the first platform-to-platform connection between trains and trams in Melbourne, as half of all passengers are expected to interchange between the two modes of transport.[6] The Anzac Station tram stop opened to passengers on the 19 December 2022,[7] replacing the Domain Interchange which formerly existed on the same site prior to Metro Tunnel construction. The train station underneath remains under construction.[8][9]
The station entrance features a large wooden canopy designed by RSHP, Hassell and Weston Williamson.[10]
G | Street level | Entrances/Exits, Tram interchange |
B1 | Concourse | Customer Service, Retail |
B2 Platforms |
Platform 1 | Sunshine Dandenong Line towards Sunbury (Town Hall) → |
Island platform, doors will open on the right | ||
Platform 2 | ← Sunshine Dandenong Line towards Pakenham or Cranbourne (Caulfield) |
Yarra Trams operates eight routes via the tram/train interchange
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.