Beijing National Stadium
Stadium in Beijing, China / From Wikipedia, the free encyclopedia
For the indoor stadium in Beijing, see National Indoor Stadium.
The National Stadium[3] (国家体育场), a.k.a Bird's Nest (鸟巢),[4] is a stadium at Olympic Green in Chaoyang, Beijing, China. The National Stadium, covering an area of 204,000 square meters with 91,000 capacity, broke ground in December 2003, officially started construction in March 2004, and was completed in June 2008.[5]
Quick Facts Full name, Location ...
国家体育场·鸟巢 | |
Bird's Nest | |
Full name | National Stadium |
---|---|
Location | 1 National Stadium South Road, Beijing, China |
Public transit | 8 15 Olympic Park 8 Olympic Sports Center |
Executive suites | 140 |
Capacity | 80,000 (91,000 with temporary seats)[1] |
Record attendance | 89,102 (Nigeria–Argentina Olympic football match, 23 August 2008) |
Surface | Grass, All-weather running track |
Construction | |
Broke ground | 24 December 2003; 20 years ago (2003-12-24) |
Built | 2003–2008 |
Opened | 28 June 2008; 16 years ago (2008-06-28) |
Construction cost | CN¥2.3 billion |
Architect | Herzog & de Meuron[2] ArupSport China Architectural Design & Research Group Ai Weiwei (Artistic consultant) |
Structural engineer | Arup[2] |
Tenants | |
China national football team (selected matches) China women's national football team (selected matches) China national basketball team (2009–2010) | |
Website | |
n-s.cn |
Close
Quick Facts Simplified Chinese, Traditional Chinese ...
Beijing National Stadium | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 北京国家体育场 | ||||||||||||||||||||
Traditional Chinese | 北京國家體育場 | ||||||||||||||||||||
| |||||||||||||||||||||
Alternative Chinese name | |||||||||||||||||||||
Simplified Chinese | 鸟巢 | ||||||||||||||||||||
Traditional Chinese | 鳥巢 | ||||||||||||||||||||
Literal meaning | Bird's Nest | ||||||||||||||||||||
| |||||||||||||||||||||
Close
The National Stadium is owned and operated by a partnership company between Beijing Municipal State-owned Assets Management Co Ltd (58%) and CITIC Group (42%).[6]
The stadium was designed for the 2008 Summer Olympics and Paralympics. It was also used during the 2022 Winter Olympics and Paralympics.