Pink Line (CTA)
rapid transit line in Chicago, Illinois From Wikipedia, the free encyclopedia
Remove ads
rapid transit line in Chicago, Illinois From Wikipedia, the free encyclopedia
The Pink Line is an 11.2 mi (18.0 km) rapid transit line in Chicago, run by the Chicago Transit Authority (CTA) as part of the Chicago "L" system.
Pink Line | |
---|---|
Overview | |
Status | Operational |
Locale | Chicago and Cicero, Illinois, United States |
Termini | 54th/Cermak The Loop |
Stations | 22 |
Service | |
Type | Rapid transit |
System | Chicago "L" |
Operator(s) | Chicago Transit Authority |
Rolling stock | 5000-series |
Daily ridership | 33,737 (avg. weekday September 2012) |
History | |
Opened | June 25, 2006 |
Technical | |
Line length | 11.2 mi (18.0 km) |
Character | Elevated and Street Level |
Track gauge | 4 ft 8 1⁄2 in (1,435 mm) |
Minimum radius | 90 feet (27 m) |
Electrification | Third rail, 600 V DC |
It is CTA's newest rail line and began operation for a 180-day trial period on June 25, 2006,[1] running between 54th/Cermak Station in Cicero, Illinois and the Loop in downtown Chicago. The route to the Loop follows tracks shared with Green Line trains on Lake Street, connected by the previously non-revenue Paulina Connector. In September 2012, the average weekday boardings on the Pink Line was 33,737. The Pink Line does not make any 'L' train transfers on the Douglas Branch.
The Pink Line operates between 54th/Cermak and the Loop, weekdays from 4:05 a.m. to 1:25 a.m., and Saturdays and Sundays from 5:05 a.m. to 1:25 a.m.
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.