West Coast MRT station
Future Mass Rapid Transit station in Singapore From Wikipedia, the free encyclopedia
West Coast MRT station is a future underground Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) and Cross Island line (CRL) located in Clementi, Singapore. It will serve West Coast Road, West Coast Highway and West Coast Drive. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.[3] It is also planned to be a Jurong Region Line interchange by the late 2030s.
Future Mass Rapid Transit (MRT) station | ||||||||||||||||
![]() Artist's impression of West Coast MRT station | ||||||||||||||||
General information | ||||||||||||||||
Location | 301 West Coast Road | |||||||||||||||
Coordinates | 1°18′39″N 103°45′28″E | |||||||||||||||
Owned by | Land Transport Authority | |||||||||||||||
Line(s) | ||||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opening | 2032 | (Cross Island Line)|||||||||||||||
Electrified | Yes | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
History
Summarize
Perspective
West Coast station was first announced on 20 September 2022 by Transport Minister S Iswaran. The station will be constructed as part of Phase 2 of the Cross Island line (CRL), a 15-kilometre (9.3 mi) segment spanning six stations from Turf City station to Jurong Lake District station.[4] The station is expected to be completed in 2032.[5]
The station will be located at the former Tanglin Secondary School, which was merged with New Town Secondary School from 2024.[6][7] Two properties belonging to JTC at Pandan Loop Industrial Estate southwest of the station will be acquired for the construction of the exits.[8] The contract for the construction of West Coast station and associated tunnels was awarded to Gamuda Berhad Singapore Branch for S$510 million (US$373.8 million) in December 2023.[9][10][11] In June 2024, the contract for the construction of tunnels between the West Coast and Jurong Lake District stations was awarded to a joint venture between Nishimatsu Construction Co Ltd and Okumura Corporation for S$242 million (US$177.4 million).[12]
Jurong Region line interchange
On 5 March 2025, transport minister Chee Hong Tat announced West Coast station would interchange with the Jurong Region line as part of the first phase of the JRL West Coast extension. The first phase was planned to be completed in the 2030s. In the 2040s, the JRL would be extended to Kent Ridge station on the Circle MRT line.[13]
Details
West Coast station will serve the Cross Island line (CRL) and have an official station code of CR18. Residents raised concerns that the station was not situated in the West Coast town centre, but transport minister Iswaran clarified that the site was chosen for its proximity to residential estates and future industrial developments, which would allow the station to serve both areas.[14][15] A mixed-use development above the station is being planned and will be integrated with the station.[16]
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.