Loading AI tools
Road bridge in Kingston, Ontario, Canada From Wikipedia, the free encyclopedia
The Waaban Crossing (known as the Third Crossing bridge during development) is a 1.2-kilometre crossing of the Cataraqui River in Kingston, Ontario, linking John Counter Boulevard on the western side of the river with Gore Road on the eastern side. Built at a cost of $180 million, the bridge was funded by equal contributions from the city, provincial, and federal governments.[1] The bridge opened to the public on December 13, 2022.[2]
Waaban Crossing | |
---|---|
Coordinates | 44.258762°N 76.471801°W |
Crosses | Cataraqui River |
Locale | Kingston, Ontario, Canada |
Begins | John Counter Boulevard |
Ends | Gore Road |
Other name(s) | Third Crossing |
Owner | City of Kingston |
Website | thirdcrossing |
Characteristics | |
Total length | 1.2 km (0.75 mi) |
No. of lanes | 2 |
History | |
Architect | Hatch |
Constructed by | Kiewit Construction |
Construction cost | $180 million |
Opened | December 13, 2022 |
Location | |
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.