USCGC James

Legend-class cutter of the U.S. Coast Guard From Wikipedia, the free encyclopedia

USCGC James

USCGC James (WMSL-754) is the fifth Legend-class cutter of the United States Coast Guard.

Quick Facts History, United States ...
USCGC James
Thumb
James arriving in Boston for her commissioning August 8, 2015.
History
United States
NameJames
NamesakeJoshua James
AwardedSeptember 9, 2011
BuilderHuntington Ingalls Industries, Pascagoula, Mississippi, U.S.
Cost$482.8 Million
Laid downMay 17, 2013
LaunchedMay 3, 2014
Sponsored byCharlene Benoit
ChristenedAugust 16, 2014
AcquiredJune 15, 2015[1]
CommissionedAugust 8, 2015[2]
HomeportCharleston, South Carolina
Identification
StatusIn service
BadgeThumb
General characteristics
Displacement4500 LT
Length418 ft (127 m)
Beam54 ft (16 m)
Height140 ft (43 m)
Draft22.5 ft (6.9 m)
Decks4
PropulsionCombined diesel and gas
Speed28+ knots
Range12,000 nm
Endurance60 days
Complement111 (15 Officers, 15 CPO, 81 Enlisted) and can carry up to 148 depending on mission[3]
Sensors and
processing systems
  • EADS 3D TRS-16 AN/SPS-75 Air Search Radar
  • SPQ-9B Fire Control Radar
  • AN/SPS-79 Surface Search Radar
  • AN/SLQ-32
Electronic warfare
& decoys
  • AN/SLQ-32 Electronic Warfare System
  • 2 SRBOC/ 2 x NULKA countermeasures chaff/rapid decoy launcher
Armament
ArmorBallistic protection for main gun
Aircraft carried2 x MH-65C Dolphin MCH, or 4 x VUAV or 1 x MH-65C Dolphin MCH and 2 x VUAV
Aviation facilities50-by-80-foot (15 m × 24 m) flight deck, hangar for all aircraft
Close

Etymology

USCGC James is named for Joshua James (1826–1902), an American sea captain and a U.S. Life-Saving Service station keeper credited with saving over 600 lives.[4]

History

Summarize
Perspective
Thumb
USCGC James pulls into Boston Harbor in August 2015

Huntington Ingalls Industries, Ingalls Shipyard in Pascagoula, Mississippi was awarded the $482.8 million construction contract September 9, 2011.[5] Construction officially began May 14, 2012 with the ceremony marking the cutting of the first 100 tons of steel.[6] The keel was laid on May 17, 2013.[7] The cutter's sponsor is James' great great niece, Charlene Benoit. She is the great grand daughter of Joshua James' brother, Samuel James.[8]

James was launched on May 3, 2014. She was christened August 16, 2014 and was commissioned in Boston on August 8, 2015.[2][9]

James served as a command and control platform in San Juan, Puerto Rico, Sept. 25, 2017. The cutter's crew deployed to aid in Hurricane Maria response operations and the ship's communications capabilities were used to help first responders coordinate efforts on the island.[10]

On August 8, 2022, James was damaged when the cutter ran aground while underway. After an investigation Captain Marc Brandt was permanently relieved of duties as the commanding officer of James.[11]

In April 2024, James will deploy to Argentina for training exercise against illegal fishing with the Prefectura Naval Argentina[12] but all of this lacks the authorization of Argentine Congress, required by law 25,880 on the entry of foreign military personnel. The ship that arrived in Buenos Aires on April 29, 2024 does not have authorization from Argentine Congress, as required by law, although there are controversies about this interpretation of the law .[13]

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.