Loading AI tools
Defunct New Zealand railway operator From Wikipedia, the free encyclopedia
Tranz Metro (formerly Cityrail and before that Cityline) was a New Zealand public transport operator. Beginning as the New Zealand Railways Corporation's Cityline division as a result of restructuring in the 1980s, in its final form Tranz Metro was the operator of Metlink's suburban trains owned by the Greater Wellington Regional Council in the Wellington Region of New Zealand.
Tranz Metro | |
---|---|
Overview | |
Owner | KiwiRail |
Locale | Wellington Region, New Zealand |
Transit type | Suburban rail |
Number of lines | 5 |
Number of stations | 49 |
Annual ridership | 11.6 million (2013-14)[1] |
Headquarters | Wellington railway station, Wellington |
Operation | |
Began operation | July 1938 (electric trains introduced in Wellington)[2] 1984 (Cityrail created) 1995 (Renamed Tranz Metro) |
Ended operation | 2 July 2016 (replaced by Transdev Wellington) |
Number of vehicles | 166 |
Technical | |
System length | 154 km (96 mi) |
Track gauge | 1,067 mm (3 ft 6 in) |
Electrification | 1,500 V DC overhead catenary (95 km or 59 mi) |
Since 3 July 2016, Wellington's commuter rail services have been operated by Transdev Wellington.[3]
Suburban passenger rail services in Auckland and Wellington were a part of the New Zealand Railways Department, while bus services were owned either by city corporations or Railways Road Services. With the restructuring of the department into the New Zealand Railways Corporation in 1982, the Auckland suburban rail operation was branded "Cityrail Auckland" from 1984 and later in the mid 1980s, suburban bus and rail services were branded Cityline as part of the Corporation's Rail Passenger Group. Further restructuring of the rail network came in 1991, and the suburban rail operations were renamed "Cityrail" after they were transferred to New Zealand Rail Limited in 1991. That year the Auckland Regional Council bought the Auckland Cityrail fleet and contracted New Zealand Rail to run it, extending the contract until 1993 and again for 10 years until 2003.[4]
In 1993, New Zealand Rail Limited was privatised, renamed Tranz Rail in 1995, with Cityrail rebranded Tranz Metro. On 15 December 2000, as part of management changes at Tranz Rail, the company split Tranz Metro into wholly owned subsidiaries Tranz Metro Auckland Ltd[5] and Tranz Metro Wellington Ltd,[6] with the intention of selling them. Stagecoach New Zealand and Greater Wellington Regional Council (GWRC) announced their intention to bid for the Wellington company, but both were barred by the Commerce Commission from doing so. Tranz Rail did not bid for the Auckland contract when it expired in 2003. Connex (later Veolia and now Transdev) won the contract, and took over from 23 August 2004.[7] Tranz Metro Wellington reverted to a business unit of Tranz Rail, with new contracts being signed with GWRC in 2006 for network access, rolling stock maintenance and service delivery. The contracts expired in 2016.[8]
In 2004, Toll Holdings bought a majority shareholding in Tranz Rail and renamed the company Toll NZ, and on 1 July 2008, it was bought (less the Tranz Link trucking and distribution arm) by the government and renamed KiwiRail. In October 2009, Cabinet agreed on a Metropolitan Rail Operating Model, which requires the operating contracts for metropolitan rail operations to be "contestable". This is in line with Auckland's rail contract.[9]
An agreement signed in July 2011 transferred ownership of KiwiRail's station buildings, excluding Wellington railway station, to the GWRC, along with the D/DM class and EM/ET units (the FP/FT units were already owned by GWRC). KiwiRail retained ownership of the tracks, platforms, electric traction and signalling systems.[10] The assets were valued at $107.5 million.[11] Ownership of the fleet transferred on 1 July 2011 to Greater Wellington Rail Ltd, formed by Greater Wellington Regional Council in 2006.[12]
In 2014, Transdev announced its intention to bid for the operations contract when it came up for renewal in 2016.[3] The contract was awarded to a partnership between Transdev and Hyundai Rotem effective from July 2016.[13]
Metlink trains are operated under contract from the GWRC, which subsidises the operation and owns station buildings and rolling stock. Typically, 60% of that subsidy comes from central government through the NZ Transport Agency (formerly Land Transport New Zealand), which approves such funding after analysis of the economics and net benefits, the remainder coming from the GWRC. Public consultation in 2005–2006 resulted in some changes of emphasis in the new contract, which runs for ten years from June 2006.[14] The September 2006 fare rises and section changes were stated to part-pay for a major upgrade of trains and facilities over the next few years in conjunction with regional bus service improvements.
Rolling stock as at 2 July 2016:
Image | Class | Type | Number | Seats | Routes operated | Introduction | |
---|---|---|---|---|---|---|---|
FP class Matangi |
electric multiple unit | 83× 2-car sets | 149 | Kapiti Line Melling Line Hutt Valley Line Johnsonville Line |
2011–16 | ||
SW class | passenger carriage | 12× SW 3× SWG 3× SWS |
64 (SW) 37 (SWG/SWS) |
Wairarapa Connection | 2007 | ||
SE class | passenger carriage | 4× SE 1× SEG 1× SES |
64 (SE) 37 (SEG/SES) |
Wairarapa Line Kapiti Line (former) Hutt Valley Line (former) |
2008 (HVL and KPL, withdrawn 2011) 2013 (WRL) | ||
AG class | luggage van | 1 | - | Wairarapa Connection | 2007 | ||
DFB class | diesel-electric locomotive | 5 | - | Wairarapa Connection | 2015 |
Image | Class | Type | Number | Seats | Routes operated | Introduction | Withdrawal |
---|---|---|---|---|---|---|---|
EM/ET class Ganz Mavag |
electric multiple unit | 44× 2-car sets | 148 | Kapiti Line Melling Line Hutt Valley Line |
1981–82 | 2011–16 | |
DM/D class English Electric |
electric multiple unit | 49 | 132 | Hutt Valley Line Johnsonville Line |
1938–1954 | 1983–2012 | |
EO class | electric locomotive | 3 | - | Kapiti Line Hutt Valley Line |
2008 | 2011[15] | |
EW class | electric locomotive | 7 | - | Kapiti Line Melling Line Hutt Valley Line Johnsonville Line |
1952 | 1988 | |
NZR 56-foot carriage | passenger carriage | up to 56 | Kapiti Line Melling Line Hutt Valley Line Johnsonville Line Wairarapa Connection |
1937–1945 | 1988 (except Wairarapa and Capital Connection) 1998 (Capital Connection) 2007 (Wairarapa Connection) | ||
DC class | diesel-electric locomotive | 4 | - | Wairarapa Connection | 1978–80 | 2015 |
In 2008-2011, KiwiRail and GWRC undertook a major upgrade of the Metlink network, dubbed the Wellington Regional Rail Programme (WRPP). The $390 million programme included:[16]
Work started on the programme in 2008, and was largely completed in February 2011.[17]
In 2011/2012, Tranz Metro had annual operational expenses of $80.437m, and revenues of $80.442m. Most revenue (47% or $37.8m) comes from fares, 22% or $17.69m comes from Wellington Regional Council rates, and 30% or $24.13m from NZ Transport Agency public transport funding.[18]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.