Texas State Highway 249

Highway in Texas From Wikipedia, the free encyclopedia

Texas State Highway 249

State Highway 249 (SH 249), also known depending on its location as West Mount Houston Road, the Tomball Parkway, Tomball Tollway, MCTRA 249 Tollway, or the Aggie Expressway, is a 49.443-mile (79.571 km) generally north–south highway in Southeast Texas. The southern terminus is in North Houston at Interstate 45 (I-45). The current northern terminus of the highway is east of Navasota at SH 105.

Quick Facts State Highway 249, Route information ...
Thumb Thumb
State Highway 249
Thumb
SH 249, highlighted in red
Route information
Maintained by TxDOT, HCTRA, and MCTRA
Length49.443 mi[1] (79.571 km)
Existed1988–present
Major junctions
South end I-45 in Houston
Major intersections
North end SH 105 near Navasota
Location
CountryUnited States
StateTexas
CountiesHarris, Montgomery, Grimes
Highway system
SH 248 SH 250
Close

Route description

Summarize
Perspective

West Mount Houston Road section

The section of SH 249 along the east–west section between I-45 and West Montgomery is called West Mount Houston Road, a local arterial road. West Mount Houston Road, however, actually extends east past the intersection of SH 249 at I-45 to an intersection with Airline Drive.

Tomball Parkway section

The section of SH 249 between West Montgomery Road and Spring Cypress Road is called Tomball Parkway. South of its intersection with Hollister Road, Tomball Parkway is a local arterial road, whereas north of it, it becomes a non-tolled freeway until it reaches Northpointe Boulevard, where the Tomball Tollway begins.

Tomball Tollway section

Phase I

Thumb
Tomball Tollway shield

Phase one runs for 6 miles (9.7 km) from just north of Spring Cypress Road, the current terminus of the existing free lanes to just north of the existing Tomball bypass. The Tomball Tollway is three lanes in each direction that are used to bypass seven stoplights and will only accept electronic toll-tags (EZ Tag, TollTag and TxTag) as no cash payments will be allowed; the total cost of the toll for HCTRA's segment is $1.50 for two-axle vehicles, while the SH 249 frontage roads will remain free to all drivers.[2][3] Construction of phase one began in fall 2013 and was completed on April 12, 2015.[4]

Business Route and Tomball Bypass

Quick Facts Business State Highway 249-B, Location ...
Business plate.svg
Business State Highway 249-B marker
Business State Highway 249-B
LocationHarris County
Length2.3 mi (3.7 km)
ExistedSeptember 25, 2003[5]–present
Close

In 1999, a bypass around the central business district of Tomball was proposed that would reroute SH 249 along the west side of the city, this would allow commercial and thru traffic to avoid the downtown and hopefully alleviate traffic.[6][7] The alignment of SH 249 from Hicks Road to Holderreith Road that went through the city proper was re-designated as SH 249 Business-B on September 25, 2003.[5] Construction of the bypass was delayed many times,[8] but eventually began in 2005 and was completed in 2008.[9] This bypass was eventually incorporated into Phase I of the Tomball Tollway as the free to use frontage roads running alongside the tolled main lanes.

Phase II

Phase two extends the tollway into Montgomery County from Business SH 249-B to Sentinel Oaks in Montgomery County north of Spring Creek. This $335 million project was overseen by the Harris and Montgomery County toll road authorities.[10] Construction on Phase 2 commenced in fall 2016 and was opened to traffic on December 19, 2019.[11]

MCTRA 249 Tollway section

Thumb
Westbound Zion Road at SH 249. Tomball Tollway is maintained by HCTRA, while the 249 Tollway is maintained by MCTRA. SH 249 is signed only on the frontage roads.

From Spring Creek to FM 1774 in Pinehurst, the tolled mainlanes of SH 249 will be maintained by the Montgomery County Toll Road Authority.[12] Signed as MCTRA 249 Tollway, the first section to open was between Spring Creek and Sentinel Oaks (coinciding with Phase two of the HCTRA segment) on December 19, 2019. Construction on the next segment of MCTRA 249 Tollway from Sentinel Oaks to FM 1774 commenced in spring 2018.[11] The next section of MCTRA 249 Tollway opened from Sentinel Oaks to Woodtrace Boulevard on March 26, 2020. The remaining MCTRA segment connecting to the TxDOT maintained section north of Woodtrace Boulevard opened on August 8, 2020.[13][14] The total cost of the toll for MCTRA's segment is $1.47 for two-axle vehicles and, like HCTRA's Tomball Tollway, will only accept electronic toll-tags (EZ Tag, TollTag and TxTag).[15]

Aggie Expressway section

Segment 1A

From FM 1774 in Pinehurst to FM 1488 east of Magnolia, the toll road continues as SH 249 Toll, also known as the Aggie Expressway. The tolled mainlanes of Section 1A are maintained by TxDOT and were opened on August 8, 2020, with no tolls charged until December 2020. The cost to drive segment 1A is $1.95; however, unlike the HCTRA and MCTRA sections of the toll road, TxDOT allows a pay-by-mail option for all users in addition to EZ Tag, TollTag and TxTag, though at a higher cost per toll.

Segment 1B

Another eight miles of the Aggie Expressway from FM 1488 up to FM 1774 north Todd Mission opened to traffic on March 26, 2021. The current cost to drive segment 1B is $2.54 for two-axle vehicles, which took effect on the day of opening.[16][17][18][19]

Segment 2

The final segment of SH 249, Segment 2 of the Aggie Expressway began construction in late 2018 and was opened to all traffic on October 28, 2022. It is 2 lanes with intermittent passing lanes that stretches from FM 1774 near Todd Mission to SH 105 east of Navasota. The segment is not tolled.[20][21]

History

Summarize
Perspective

Originally a part of FM 149, the highway was given the designation of SH 249 in 1988.[1] Previously, SH 249 was designated on June 22, 1937[22] from then-SH 73 (now Interstate 10) near San Felipe north to the Brazos River. The route was redesignated on May 9, 1940, as Spur 99.[23] The route became part of Farm to Market Road 1458 on January 20, 1966.

The highway's importance grew after Compaq, a former information technology company, chose to locate its headquarters near at the intersection of SH 249 and Louetta Rd in Harris County in the 1980s.[24] The company became so important to Houston that it necessitated the expansion of SH 249 in the late 1980s, and many other technology companies appeared in what became known as the "249 Corridor".[25]

In 2015, SH 249 was extended northwest 24.4 miles from FM 149 and FM 1774 to SH 105 near Stoneham. A section of SH 249 from Woodtrace Boulevard to FM 149 was renumbered as a southern extension of FM 1774 in December 2019.[26] On June 25, 2020, the FM 1774 extension was modified so that it extended only over the frontage roads of SH 249 from FM 149 to Woodtrace Boulevard while the main lanes from Woodtrace Boulevard to FM 1774 and on to SH 105 retained the SH 249 designation. On August 8, 2020, the section of SH 249 from FM 1774 to FM 1488 was opened. On March 26, 2021, the section of SH 249 from FM 1488 to FM 1774 was opened.

Since the designation of SH 249, TxDOT had long-term plans to extend the highway to Grimes County. Continued growth in the Bryan/College Station, Conroe and northwest Houston regions have congested existing roadways, including SH 105 and FM 1774. Texas A&M University and businesses in the Bryan/College Station area would benefit from faster connections to Bush-Intercontinental Airport, the Port of Houston and the Texas Medical Center. A bypass of Magnolia was desirable because of the large traffic load every October due to the annual Texas Renaissance Festival. Decreased funding for road projects in recent years had stalled the extension of SH 249. However the rapid growth in the area has led to a renewed push in 2012 to build further segments.

Plans for the middle segments (Pinehurst–Todd Mission) and north segment (Todd Mission–Navasota) were revived by TXDOT in early 2013. TxDOT has formed a working group with local officials and stakeholders to discuss alternatives for the SH 249 corridor.[27][28][29] The segment from Sentinel Oaks to FM 1774 in Pinehurst (maintained by MCTRA) opened in spring 2020.[14] From FM 1774 in Pinehurst, north up to SH 105 in Grimes County, SH 249 was under the jurisdiction of TxDOT. The remaining portion of SH 249 in Montgomery County from FM 1488 to FM 1774 in Todd Mission was completed on March 26, 2021.[30][31] In Grimes County, the north segment was constructed as a non-tolled two-lane freeway.[32] Construction in Grimes County began in late 2018 and was completed in October 2022.[33][34][21]

Major intersections

All exits are unnumbered.

More information County, Location ...
CountyLocationmikmDestinationsNotes
HarrisHouston0.000.00West Mount Houston RoadContinuation east of I-45
1.452.33 I-45 (North Freeway)Southern terminus of SH 249; I-45 exit 57B
2.904.67 Beltway 8 (Frontage Road) / Sam Houston Tollwayinterchange; south end of freeway; southbound traffic has two direct ramps to westbound and eastbound Sam Houston Tollway
4.367.02Greens Road / Gessner Road
5.819.35 FM 1960 / Gessner RoadAccess to Methodist Hospital Willowbrook
7.2711.70Grant Road / Schroeder Road / Perry Road
8.7214.03Cypresswood Drive / Compaq Center Drive
10.1716.37 Chasewood Park Drive / Compaq Center Drive / Cypresswood Drive / Perry RoadAccess to CHI St. Luke's Health - The Vintage Hospital
11.6318.72Louetta Road / Jones Road
13.0821.05Spring-Cypress Road
14.5423.40 SH 249 (Frontage Road) / Northpointe Boulevard / Boudreaux RoadLast free northbound exit before entering the Tomball Tollway[35]
15.9925.73
Tomball Tollway begins
Southern terminus of the Tomball Tollway[35]
17.4528.08Tomball Tollway Mainlane Toll Plaza[36]
Electronic toll tags only, no cash allowed
18.9030.42 SH 99 Toll (Grand Parkway)Direct ramps to east and westbound Grand Parkway (SH 99) from northbound Tomball Tollway
Tomball20.3532.75

Bus. SH 249 north / Holderrieth Road / Alice Road
Southern terminus of Bus. SH 249;[37] access to HCA Houston Healthcare Tomball
21.8135.10

FM 2920 / Bus. SH 249 south Tomball, Hooks Airport / Alice Road
Access to HCA Houston Healthcare Tomball
23.2637.43Brown Road / Baker Road / Zion RoadAccess to Lone Star College-Tomball campus
HarrisMontgomery
county line
24.7239.78
Tomball Tollway ends
MCTRA 249 Tollway begins
Northern terminus of HCTRA's Tomball Tollway;
southern terminus of MCTRA 249 Tollway[35]
Montgomery26.1742.12Decker Prairie Road / Hardin Store Road[38]
27.6244.45Decker Prairie Tolling Zone[39]
Electronic toll tags only; cash and pay-by-mail not allowed.
29.0846.80 FM 1774 / Woodtrace Boulevard MagnoliaSouthern terminus of FM 1774 (not signed southbound);[38] last southbound exit for traffic paying by mail.
30.5349.13MCTRA 249 Tollway ends

SH 249 Toll begins
Northern terminus of MCTRA 249 Tollway;
southern terminus of SH 249 Toll (Aggie Expressway)[35]
31.9951.48 FM 149[40]
33.4453.82Mainlane Toll Gantry North of FM 149[41]
Electronic toll tags or pay-by-mail (cash not accepted)[17][18]
34.9056.17Audubon BoulevardRoad not connected yet[42]
36.3558.50 FM 1488
37.8060.83
FM 1488 west (Magnolia Relief Route) Hempstead
Proposed exit; eastern terminus of proposed Magnolia Relief Route[43]
39.2663.18Jackson RoadProposed exit; would connect to FM 149 northeast of Magnolia[44]
40.7165.52 FM 1486
42.1767.87Mainlane Toll Gantry North of CR 115[41]
Electronic toll tags or pay-by-mail (cash not accepted)
GrimesTodd Mission43.6270.20 FM 1774Northbound terminus of toll road and start of two-lane freeway; last free southbound exit before start of toll road[40][45]
45.0872.55
SH 249 Toll ends

SH 249 begins
Northern terminus of SH 249 Toll;
Aggie Expressway continues as SH 249 without tolls
46.5374.88CR 304[45][32]
47.9877.22

CR 306 to SH 105 east
Northbound exit and southbound entrance; provides access to eastbound SH 105 via CR 306 west and FM 1748 north[45][32]
49.4479.57
SH 105 west

SH 249 ends
Northern terminus of SH 249; no exit to SH 105 east[45][32]
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
Close

References

Notes

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.