Launch facilities used by SpaceX From Wikipedia, the free encyclopedia
As of 2023[update], SpaceX operates four launch facilities: Cape Canaveral Space Launch Complex 40 (SLC-40), Vandenberg Space Force Base Space Launch Complex 4E (SLC-4E), Kennedy Space Center Launch Complex 39A (LC-39A), and Brownsville South Texas Launch Site (Starbase). Space Launch Complex 40 was damaged in the AMOS-6 accident in September 2016 and repair work was completed by December 2017.[1] SpaceX believes that they can optimize their launch operations, and reduce launch costs, by dividing their launch missions amongst these four launch facilities: LC-39A for NASA launches, SLC-40 for United States Space Force national security launches, SLC-4E for polar launches, and South Texas Launch Site for commercial launches.[2]
COO Gwynne Shotwell stated in 2014 that "we are expanding in all of our locations" and "you will end up seeing a lot of SpaceX launch sites in order to meet the future demand that we anticipate."[3] As of June 2016[update], SpaceX discussed preliminary plans to launch an average of 90 rockets per year after 2019.[4] SpaceX has indicated that, depending on market demand, it may need another commercial launch site in addition to the Texas location.[2]
In 2016, SpaceX signed a five-year lease to use a 53,000 square foot (4,900 m2) former Spacehab building at Port Canaveral.[5] A new building nearby is also planned, and these facilities would be used to refurbish rockets.[6]
In addition, SpaceX uses a suborbital test facility, the SpaceX Rocket Development and Test Facility in McGregor, Texas. A high-altitude suborbital test facility was under construction in New Mexico,[2] but was abandoned following the switch to flight tests on commercial missions.
SpaceX has indicated that they see a niche for each of the four orbital facilities currently in use or under construction, and that they have sufficient launch business to fill each pad,[7] particularly so by the end of the decade if SpaceX business remains strong.[2]
In 2007, the US Air Force leased Cape Canaveral Space Launch Complex 40 to SpaceX to launch the Falcon 9 rocket.[8] During April 2008, construction started on the ground facilities necessary to support the launch of the SpaceX Falcon 9 rocket. Renovations included installation of new liquid oxygen and kerosene tanks and construction of a hangar for rocket and payload preparation.
The first Falcon 9 rocket arrived at SLC-40 in late 2008, and was first erected on January 10, 2009.[9] It successfully reached orbit on its maiden launch on June 4, 2010, carrying a dummy payload qualification unit. SpaceX modified the launch pad in 2013 in order to support launches of the Falcon 9 v1.1 launch vehicle, a 60 percent heavier rocket with 60 percent more thrust on realigned engines[10] and 60 percent longer fuel tank than the v1.0 version of the Falcon 9, requiring a modified transporter/erector.[11]
In September 2016, the pad was damaged when a Falcon 9 rocket exploded during liquid oxygen loading in preparation for a hot-fire test.[12] The pad was repaired and used for the first time since the explosion in the SpaceX CRS-13 mission in December 2017.[13]
In December 2013, NASA and SpaceX were in negotiations for SpaceX to lease Kennedy Space Center Launch Complex 39A, after SpaceX was selected in a multi-company bid process, following NASA's decision in early 2013 to lease the unused complex as part of a bid to reduce annual operation and maintenance costs of unused government facilities.[14] The SpaceX bid was for exclusive use of the launch complex to support their future crewed missions,[15] but SpaceX said in September 2013 that they are also willing to support a multi-user arrangement for LC-39A,[16] and they reiterated that position in December 2013.[17]
A competing bid for commercial use of the launch complex was submitted by Jeff Bezos' Blue Origin, who bid for a shared non-exclusive use of the complex such that the launchpad can interface with multiple vehicles, and costs of pad operational expenses could be shared over the long term. One potential shared user in the Blue Origin notional plan was with United Launch Alliance.[15] In September 2013—prior to completion of the bid period, and prior to any public announcement by NASA of the results of the process—Blue Origin filed a protest with the U.S. General Accounting Office (GAO) over what it said was "a plan by NASA to award an exclusive commercial lease to SpaceX for use of mothballed space shuttle launch LC-39A."[18] NASA planned to complete the bid award and have the pad transferred by October 1, 2013, but the protest delayed a decision until after the GAO resolved the protest.[18] Following the eruption of the controversy, on September 21, SpaceX said that they were willing to support a multi-user arrangement for LC-39A.[2][16] In December 2013, the GAO denied the protest and sided with NASA, which argued that the solicitation contains no preference on the use of the facility as multi-use or single-use. "The [solicitation] document merely asks bidders to explain their reasons for selecting one approach instead of the other and how they would manage the facility."[19]
SpaceX began architectural and engineering design work on the pad modifications in 2013, and signed the contractual documents to lease the pad for 20 years[20] from NASA in April 2014.[21] SpaceX is building a large Horizontal Integration Facility (HIF) just outside the perimeter of the existing launch pad in order to "house the Falcon [rockets] and associated hardware and payloads during processing."[22] This is a marked difference from the vertical integration facility used by previous US government rockets that used the launch pad (Apollo Program and the Space Shuttle)—plus the installation of all new instrumentation and control systems, with substantial new plumbing for a variety of rocket liquids and gasses.[20]
The Falcon rockets will be transported from the HIF to the launch pad aboard a Transporter Erector (TE) which will ride on rails up the former crawlerway path.[22] In February 2016, it was reported that the pad was completed and activated indicating it is ready for launches of Falcon 9 Full Thrust.[23] The first SpaceX launch from LC-39A occurred in February 2017, followed by a successful first-stage landing at Landing Zone 1. Further work was needed to support Falcon Heavy and crewed launches took over 60 days and occurred after Cape Canaveral LC-40 reopened.[1] Demo-2, SpaceX's first crewed space mission launched from the Kennedy Space Center (KSC) LC-39A launch pad in May 2020.
In April 2018, SpaceX completed a draft environmental assessment for a new facility "that would include a booster processing hangar and launch control center on 67 acres (27 ha) of KSC property" to support a faster flight rate of "Falcon rockets, including processing of landed booster stages and recovered payload fairings for reuse."[24]
In 2024, a proposal for SpaceX to add 100 acres to their existing footprint at KSC was approved pending the signing of a lease.[25]
The SpaceX Starship was initially deemed too large to launch from any existing SpaceX facility. In 2014, SpaceX indicated that the historic Florida launchpad LC-39A would not be large enough, and they planned to build a new site to accommodate the 9-meter-diameter (30 ft) rocket.[26] The Starship is projected to be powered by 28 Raptor liquid oxygen/liquid methane engines producing approximately 72 MN (16,000,000 lbf) of thrust at liftoff.[27][28][29][30] In his September 2016 presentation, Elon Musk stated that the large launch vehicle would indeed be launched from LC-39A.[31] However, SpaceX instead opted to build their South Texas Launch Site for exclusive use by Starship.
SpaceX currently operates a West Coast launch site located at Vandenberg Space Force Base Space Launch Complex 4 in order to deliver satellites to polar or Sun-synchronous orbits with Falcon 9 and Falcon Heavy launches.
SpaceX broke ground at Vandenberg in July 2011.[32][33] A 2011 estimate showed that the project was expected to cost between $20 and $30 million for the first 24 months of construction and operation; thereafter, operational costs were expected to be $5–10 million per year. The sixth flight of the Falcon 9 launch vehicle launched in September 2013, which was the maiden flight of Falcon 9 v1.1.[2] The site was used for a second time in January 2016 for the Jason-3 launch (which was the last flight of Falcon 9 v1.1) and for a third time in January 2017 for the first of the Iridium Next launches.
On April 24, 2023, the United States Space Force announced that it was leasing Vandenberg Space Launch Complex 6 (SLC-6) to SpaceX for Falcon 9 and Falcon Heavy launches. SpaceX expects to begin Falcon 9 launches from SLC-6 in 2025 and Falcon Heavy launches in 2026.[34] Since then, SpaceX has started reconfiguring the launch pad.[35]
This section needs to be updated. The reason given is: section does not reflect latest Starship development activity. (May 2024) |
Until 2019, SpaceX was building a new spaceport at Boca Chica Village near Brownsville, Texas for their private use, with an emphasis on commercial space transport work.[36][37] The site is to be optimized for launches of commercial telecommunication satellites that would be launched to the east, across the Gulf of Mexico into geostationary transfer orbits.[2]
During 2011–2014, SpaceX considered as many as seven potential locations around the country for a new private launch facility for orbital flights, including Alaska, California, Florida,[38] Texas, Virginia,[39] Georgia,[40] and Puerto Rico.[41] One of the proposed locations for the new commercial-mission-only spaceport was south Texas, which was revealed in April 2012, via preliminary regulatory documentation. The FAA's Office of Commercial Space Transportation began a multi-year process to conduct an Environmental Impact Statement[42] and public hearings on the new launch site, which would be located in Cameron County, Texas. The site was to initially support up to 12 commercial launches per year, including two Falcon Heavy launches.[43][44][45]
As early as March 2013, Texas became the leading candidate for the location of the new SpaceX commercial launch facility, although Florida, Georgia and other locations remained in the running. Legislation was introduced in the Texas Legislature in early 2013 that would enable temporary closings of State beaches during launches, limit liability for noise and some other specific commercial spaceflight risks, while the legislature also considered a package of incentives to encourage SpaceX to locate at the Brownsville, Texas location.[46] The Texas incentive package and beach closing legislation is in place. In October 2013, CEO Musk said that "Texas is looking increasingly likely," waiting for final regulatory approvals.[2] The FAA released the draft Environmental Impact Statement in April 2013, and "found that 'no impacts would occur' that would force the Federal Aviation Administration to deny SpaceX a permit for rocket operations near Brownsville."[47]
SpaceX originally intended to launch their first launch vehicle, the Falcon 1, from Space Launch Complex 3 West (SLC-3W) at Vandenberg Space Force Base. SLC-3W was modified by SpaceX to support the Falcon 1, and the Falcon 1 was erected on the pad in 2005. Problems arose when SpaceX was unable to obtain sufficient launch window availability because the pad would overfly other Air Force pads that were frequently left occupied for weeks or months at a time, thus severely restricting SpaceX launches.[32] Ultimately, this launch pad was never used for orbital launch, although it was used for a number of ground tests.
SpaceX proceeded to then[when?] build a launch facility in the northern Pacific Ocean at the Ronald Reagan Ballistic Missile Defense Test Site, on Omelek Island, a part of the Kwajalein Atoll, Marshall Islands. SpaceX began launching Falcon 1 rockets from Omelek in 2006. Falcon 1 Flight 4 was the first successful privately funded, liquid-propelled launch vehicle to achieve orbit, and was launched from Omelek Island on 28 September 2008, followed by another Falcon 1 launch on 13 July 2009, placing RazakSAT into orbit.[48]
SpaceX originally planned to upgrade the Omelek launch site for use by the Falcon 9 launch vehicle, but later cancelled their plans to do so, and have since disassembled the entire installation. In December 2010, the SpaceX launch manifest listed Omelek (Kwajalein) as a potential site for several Falcon 9 launches, the first planned for as early as 2012.[49] The "Falcon 9 Overview" document also offered Kwajalein as a launch option in 2010.[50] Since then, the FAA Environmental Impact Report of May 2014 lists this site as non-operational and returned to its original state, to no longer be used, "Five Falcon 1 launches occurred at Omelek Island, Kwajalein Atoll. After these launches of the Falcon 1, the site was no longer needed and SpaceX closed the site and returned the property to pre-launch conditions".[51] All Falcon 1 launches took place at this location, five launches from 2006 to 2009. SpaceX abandoned Omelek when Falcon 1 was retired, due to the expense of logistics.
SpaceX has two rocket test facilities for vertical takeoff, vertical landing rockets: the SpaceX Rocket Development and Test Facility in McGregor, Texas and a leased test facility at Spaceport America in southern New Mexico.[2] All SpaceX rocket engines are tested on rocket test stands, and low-altitude VTVL flight testing of the Falcon 9 Grasshopper v1.0 test vehicle are done at McGregor. High-altitude, high-velocity flight testing of Grasshopper v1.1 were planned to be done at Spaceport America. In addition to atmospheric flight testing, and rocket engine testing, the McGregor facility is also used for post-flight disassembly and defueling of the SpaceX Dragon following orbital missions.
Both flight test facilities are principally involved in developing and testing various elements of the SpaceX reusable launch system development program, with a goal to making future SpaceX launch systems fully and rapidly reusable.[52]
SpaceX's Rocket Development and Test Facility in McGregor, Texas is a rocket engine test facility. Every rocket engine and thruster manufactured by SpaceX must pass through McGregor for rigorous final testing, ensuring their reliability and performance before being used on flight missions.[53][54] The facility also tests various components and engines during the research and development process.[55] In addition to engine testing, after splashdown and recovery, Dragon spacecraft make a stop at McGregor to have their dangerous hypergolic propellant fuels removed, before the capsules continue on to Hawthorne for refurbishment.[53]
SpaceX calls the facility the most advanced and active rocket engine test facility in the world, and said that as of 2024[update], over 7,000 tests had been conducted at the facility since it opened, with seven engine test fires on a typical day. Despite its low-profile compared to the company's other facilities, is a critical part of SpaceX's operations, and company president and COO Gwynne Shotwell maintains her primary office in McGregor.[56][53]
Leased by SpaceX in 2003,[57] the McGregor facility was originally the site of the Bluebonnet Ordnance Plant during World War II,[55] then was used as a testing facilities for Beal Aerospace. In its early days, SpaceX reused many of the leftover facilities from the previous occupants of the site to test its first Merlin engines, but over time it has undergone significant expansion and improvements. SpaceX has purchased adjacent farmland, increasing the facility's size from 256 acres (104 ha),[55] to over 600 acres (240 ha) by April 2011,[58] and to 4,000 acres (1,600 ha) by March 2015.[59]
In 2011, SpaceX announced plans to upgrade the facility for launch testing of a VTVL test rocket, known as Grasshopper.[60] A half-acre concrete launch facility was constructed to support the test flight program,[61] which included eight flights of Grasshopper and five flights of its successor, "F9R Dev1." The flight test campagn ended in 2014.[62]
By October 2012, the McGregor facility operated seven test stands, running 18 hours a day, six days a week.[53] Since then, the number of test stands has increased to meet the growing demands of SpaceX's production. By March 2015, the facility operated 12 test stands and had run over 4,000 Merlin engine tests, including some 50 firings of the integrated nine-engine first stage.[59] In August 2016, testing began on the new methane-fueled Raptor rocket engine.[63] As of 2024, the facility sees seven engine test fires on a typical day.[56]
In July 2021, SpaceX announced plans to build a second production facility for Raptor engines at the McGregor facility. The new facility is expected to produce 800 to 1,000 rocket engines per year, approximately 2 to 4 each day, significantly expanding SpaceX's production capacity.[64][65]
As part of the SpaceX reusable launch system development program, SpaceX announced in May 2013 that the follow-up to Grasshopper, a high-altitude, vertical takeoff, vertical landing (VTVL) suborbital technology demonstrator would be tested at Spaceport America near Las Cruces, New Mexico. SpaceX signed a three-year lease for land and facilities at the recently operational spaceport.[66][67] As of May 2013[update], SpaceX indicated that they did not yet know how many jobs would move from McGregor, Texas to New Mexico to support the second phase of VTVL Grasshopper testing.[68]
In 2013, SpaceX constructed a 30-by-30-meter (98 ft × 98 ft) pad at Spaceport America, 7 kilometers (4.3 mi) southwest of the spaceport's main campus, and will lease the pad for US$6,600 per month plus US$25,000 per Grasshopper flight. The spaceport administrator expected SpaceX to be operational at the Spaceport between October 2013 and February 2014, and anticipated that the lease payments would begin at that time.[69][70] By May 2014, SpaceX expended more than US$2 million on construction of the New Mexico facility, and is using more than 20 local firms to work on the project. Work items have included modifying the Range Operations Plan as well as a variety of fire-prevention measures.[71]
While in July 2014 the first test flight was still expected to occur sometime in 2014,[72] reports in October 2014 indicated that the first flight of F9R Dev2 at Spaceport America would not occur until the first half of 2015.[73] On 19 February 2015, SpaceX announced that the F9R Dev2 would be discontinued indicating that ocean tests using operational Falcon 9 rockets were sufficiently successful that it was no longer necessary.[74] Instead the New Mexico site will be used for testing the returned first stages.[citation needed]
During April 2015, SpaceX performed tanking tests on the In-Flight Abort rocket on the Vandenberg Space Force Base SLC-4E. Since this rocket only possessed three Merlin 1D engines, it was speculated that the discontinued F9R Dev2 was re-purposed as the launch vehicle in the In-Flight Abort Test.[75]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.