Remove ads
Rail trail in Somerville, Massachusetts From Wikipedia, the free encyclopedia
The Somerville Community Path is a paved rail trail in Somerville, Massachusetts, running 3.2 miles (5.1 km) from the Alewife Linear Park at the Cambridge/Somerville border to East Cambridge via Davis Square.[2] The first portion opened in 1985 along part of the former Fitchburg Cutoff rail line. Extensions opened in 1994 and 2015. A further 1.9-mile (3.1 km) extension to East Cambridge opened in June 2023 as part of the Green Line Extension project. It is a section of the partially completed Mass Central Rail Trail.
Somerville Community Path | |
---|---|
Length | 3.2 miles (5.1 km) |
Began construction | 1985 |
Completed | 2023 |
Surface | Asphalt |
Right of way | Fitchburg Cutoff, Green Line Extension |
Maintained by | City of Somerville[1] |
Trail map | |
Somerville Community Path |
The east part of the Fitchburg Cutoff opened in 1870, connecting the Lexington and Arlington Railroad (Lexington Branch) to the Boston and Lowell Railroad. Only used for Boston and Maine Railroad freight trains after 1926, the line was abandoned as far east as Cedar Street in 1979 to allow construction of the Red Line Northwest Extension.[3] The Alewife Linear Park opened from Alewife to Davis in 1985.[4][5] The Somerville Community Path opened 0.6 miles (0.97 km) from Davis Square to Cedar Street in 1994, with the 0.4-mile (0.64 km) Cambridge/Somerville border–Davis Square segment of the Alewife Linear Park becoming part of the Community Path.[4][6] In 2013, construction began on a 0.3-mile (0.48 km) extension to Lowell Street.[7] The $2.2 million extension opened in mid-2015, with an official dedication ceremony on August 19.[8]
In April 2014, state officials announced that a 1.9-mile (3.1 km), $39 million extension of the Community Path to East Cambridge would be built as part of the Green Line Extension (GLX) project.[7] Beginning in 2015, the state began a major re-evaluation of the GLX project due to significantly increased costs. In May 2016, the state indicated that the Community Path would only be built as far as Washington Street in the revised plan to avoid a costly bridge. In some sections, the path would be lowered to track level to eliminate costly retaining walls, resulting in fewer connections to cross streets than previously planned.[9]
A consortium called GLX Constructors was selected as the winner for re-bid project in November 2017. Their proposal reduced costs enough to add the full Community Path extension back into the plan.[10] However, the plans call for a 10-foot (3.0 m)-wide path, narrower than existing portions and the 12-foot width recommended in federal guidelines. Cycling advocates have raised concerns about safety of the narrowed path given the expected levels of bicycle traffic.[11] The GLX and path extension were expected to be completed in late 2021; with was delayed to mid-2022, then November 2022.[12][13][14] The 1,400-foot (430 m)-long bridge over the Fitchburg Line and Green Line reaches 50 feet (15 m) tall, with grades of 4.8% on the approaches.[15]
The Medford Branch opened in December 2022, but the path remained closed. Somerville signed a lease agreement with the MBTA in February 2023.[16] The extension opened on June 10, 2023.[17] A separate project constructing Reavis Field for Somerville High School moved a small section of the path onto a protected on-street detour until October 18, 2023.[18] The path extension is an example of rails with trails.
Two proposed projects would connect to the extension: the Mystic to Charles Connector north to the Mystic Greenways network, and the Grand Junction Multi-use Path south to the Charles River Bike Path.[19][20]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.