Remove ads
Passenger train From Wikipedia, the free encyclopedia
The San Diegan was one of the named passenger trains of the Atchison, Topeka and Santa Fe Railway, and a “workhorse” of the railroad. Its 126-mile (203-kilometer) route ran from Los Angeles, California, south to San Diego. It was assigned train Nos. 70–79 (Nos. 80–83 were added in 1952 when RDCs began operating on the line).
Overview | |
---|---|
Service type | Inter-city rail |
Status | Discontinued |
Locale | Southern California |
First service | March 27, 1938 |
Last service | June 1, 2000 |
Successor | Pacific Surfliner |
Former operator(s) | Atchison, Topeka and Santa Fe Railway (1938–1971) Amtrak (1971–2000) |
Route | |
Termini | Los Angeles, California San Diego, California |
Stops | 16 (total) |
Technical | |
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) |
Track owner(s) | ATSF Railway |
The Los Angeles-San Diego corridor was to the Santa Fe what the New York City–Philadelphia corridor was to the Pennsylvania Railroad. Daily traffic could reach a density of ten trains (each way) during the summer months. From the Los Angeles/Orange County border to San Diego, it ran along the Surf Line (officially, the Fourth District of the Los Angeles Division), which was so named because much of its trackage came within fewer than 100 feet of the Pacific Ocean.
The first San Diegan ran on March 27, 1938, as one set of equipment making two round trips a day. A second trainset delivered in 1941 made possible four streamlined trains each way. A set of heavyweight equipment made a fifth trip in each direction. During and after World War II, furlough business from San Diego's military bases necessitated extra (albeit heavyweight) sections of San Diegans, and racetrack specials during horseracing season at Del Mar added to passenger train miles.
Amtrak continued to operate the San Diegan when it took over operation of the nation's passenger service on May 1, 1971. After extending the route to the Central Coast in the 1980s and 1990s, Amtrak rebranded the route as the Pacific Surfliner on June 1, 2000.
Construction of the Surf Line between Los Angeles and San Diego began on October 12, 1880, with the organization of the California Southern Railroad Company. On January 2, 1882, the California Southern commenced passenger and freight service between National City and Fallbrook Junction, just north of Oceanside.[1] The Santa Fe assumed control of the California Southern and on August 12, 1888, completed the line between Los Angeles and San Diego. Initially known as the "Short Line", the route replaced the Santa Fe's existing circuitous route via Temecula Canyon.[2] In the 1930s the Surf Line hosted four round-trips per day, with an average trip time of 3+1⁄2 hours.[3]
Santa Fe San Diegan | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Amtrak San Diegan | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1971–2000 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
In the late 1930s streamlined trains were in transition. While fixed consists such as the Union Pacific Railroad's M-10000 were out (the last, the Illinois Central 121, had been built in 1936),[4] railroads still ordered sets of equipment with the intention that those sets stay with a particular train. In 1937–1938, the Santa Fe embarked on a massive program to upgrade its passenger fleet: it introduced new sets on the Chief, Super Chief and El Capitan, and added three new trains — the Chicagoan, Kansas Cityan, and the San Diegan.[5][6]
On March 27, 1938, the Santa Fe inaugurated the San Diegan, operating on a schedule of 2+1⁄2 hours. The single equipment set could make two round-trips per day. A second San Diegan consist entered service on June 8, 1941, doubling the schedule to four daily round trips.[7] The San Diegan was supplemented by two conventional heavyweight trains.[8]
Amtrak assumed control of most intercity passenger trains in the United States on May 1, 1971. It retained two of the San Diegan's three round-trips.[16] Between November 1971–April 1972 the long-distance Coast Daylight/Coast Starlight operated along the entire length of the Pacific Coast from Seattle to San Diego. The Daylight/Starlight was cut back to Los Angeles in April, and Amtrak restored the third San Diegan round trip to maintain the same level of service along the corridor[17] Beginning in 1976 the state of California funded additional service: a fourth round-trip on September 1, 1976, a fifth on April 24, 1977, a sixth on February 14, 1978, and a seventh on October 26, 1980.[18] Between April 29, 1984, and April 28, 1985, Amtrak experimented with an express service between Los Angeles and San Diego. This was targeted at business customers and made fewer stops than the regular San Diegan trains. Dubbed Metroliner after the high-speed service on the Northeast Corridor, it was unpopular and suffered from low ridership. After its discontinuance Amtrak restored the seventh San Diegan and introduced Custom class on the route.[19]
The original San Diegan consist included a baggage car, two coaches (60 seats each), a lunch counter-tavern car, and a parlor-observation car.[21] Motive power consisted of a single 1,800 hp (1,300 kW) EMC E1A locomotive sporting the familiar Warbonnet paint scheme.[8] These units would, in time, be replaced by ALCO PA and PB power and EMD F3 and F7 locomotives. Santa Fe's lone trio of Fairbanks-Morse (FM) "Erie-built" locomotives and the odd GE U28CG could also be seen occasionally running the line.
A lone pair of 90-seat self-powered Budd Rail Diesel Cars (RDCs) were acquired for express service. They operated "back-to-back" as a single train unit from May 21, 1952, until the Redondo Junction derailment on January 22, 1956.[22]
Three additional coach units were added for weekend traffic.[citation needed] The San Diegan also enjoyed almost exclusive use of Santa Fe's "pendulum-suspension" chair car, No. 1100, after World War II.[23]
In June 1941, the railroad added a second eight-car trainset, also built by Budd, to handle the high demand. Its original consist was similar to the above save for an additional coach. Subsequent consists varied according to traffic levels.
A representative, all-lightweight consist from the Summer of 1955:
Under Amtrak ex-Santa Fe Hi-Level coaches were used in the early 1970s.[24] Modern Amfleet coaches arrived in 1976.[25] For a six-month period in 1978 service on the route was supplemented by the El Camino cars owned by Los Angeles County.[26]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.