Loading AI tools
Canadian shipbuilding company From Wikipedia, the free encyclopedia
Saint John Shipbuilding was a Canadian shipbuilding company located in Saint John, New Brunswick. The shipyard was active from 1923 to 2003.
This article needs additional citations for verification. (May 2018) |
Formerly |
|
---|---|
Industry | Shipbuilding |
Founded | 1918 |
Defunct | Early 2000s |
Headquarters | , Canada |
Owner |
|
Numerous shipyards were located on the shores of Courtney Bay in the east end of Saint John Harbour where extensive mud flats dried at low tide.
In 1918 it was announced that the St. John Drydock & Shipbuilding Co. would be established as a subsidiary of the Canada Dredging Co., Ltd. of Midland, Ontario and would construct the largest drydock in the world.
St. John to Have Biggest Drydock.
The drydock to be erected at the City of Saint John, N.B., will be one of the largest in the world. The contract has already been let to the St. John Drydock and Shipbuilding Company by the Department of Public Works, Ottawa. The length of the new dock will be 1,150 feet and its width at the bottom 125 feet. It will accommodate the largest vessel, naval or mercantile, which is now afloat or planned. The St. John Drydock and Shipbuilding Company is controlled by the Canada Dredging Company, Limited of Midland, Ont. Among those connected with the organization are James Playfair, General Manager of the Great Lakes Transportation Company, Ltd.; W.H. Robertson, D.L. White, Jr., W.J. Sheppard, W.E.Phin, D.S. Pratt, George Y. Chown, R. Hobson, Colonel Thomas A. Duff, J.A. Paisley, and J.B. Craven.— August 11, 1918, The New York Times
The new shipyard with its massive drydock opened in 1923 at a location on the eastern shore of Courtney Bay. The first of its long list of vessels, the ferry MV Kipawo, which still exists, was launched on December 5, 1924. After fit-up, it went into service in 1926.[1]
The shipyard was sold in the 1950s to the industrialist K.C. Irving. The ensuing corporate restructuring saw the company renamed Saint John Shipbuilding & Dry Dock Co., Ltd.. By the 1980s, it came to be known simply as Saint John Shipbuilding and was the flagship of a collection of eastern Canadian shipyards operated by Irving Shipbuilding.
The shipyard was used to construct oil tankers for Irving Oil and freighters and other cargo vessels for Kent Lines, a shipping company owned by K.C. Irving. The facility also received a contract from Canadian Pacific Railway in 1969 to build a passenger-vehicle ferry for its Bay of Fundy service from Saint John to Digby. Similarly, the government-owned ferry operator CN Marine placed an order in the early 1980s for a passenger-vehicle ferry for its Northumberland Strait service to Prince Edward Island.
By far the largest contract placed with the shipyard, and the largest single shipbuilding order ever issued in Canadian history, was for the Royal Canadian Navy's Halifax-class frigate program, which saw nine warships built at Saint John during the early 1990s. Flush with revenues during this contract, Irving Shipbuilding went on a buying spree of several bankrupt or failing shipyards in eastern Canada as part of a strategy to assist with spreading the work at its overcrowded shipyard in Saint John.
The East Isle Shipyard in Georgetown, Prince Edward Island was purchased from the provincial government and used to construct modules for the Halifax-class frigates. Similarly, Irving Shipbuilding purchased the Shelburne Ship Repair shipyard in Shelburne and the Pictou Shipyard in Pictou to support the Halifax-class project. Irving Shipbuilding also purchased Halifax Dartmouth Industries after that shipyard was sub-contracted in 1992 to build the Kingston-class coastal defence vessel as part of the Maritime Coastal Defence Vessel Project by the winning consortium led by SNC Lavalin.
However, changing global economic conditions for Canada's shipbuilders during the late 1990s coupled with changes to federal government tariffs and tax policies for Canadian ship owners saw Saint John Shipbuilding left with little work after the Halifax-class frigates were completed. Kent Lines ordered several container ships and Irving Shipbuilding's shipyards in Nova Scotia and Prince Edward Island were kept moderately busy with repair and small contract construction, but there were no large contracts on the horizon. The skilled workforce at Saint John Shipbuilding dwindled as welders and engineers and other trades and professionals left for work on other projects in Canada and abroad. The yard was mothballed in 2000 after it completed its last ship.
Finally on June 27, 2003, Irving Shipbuilding announced that it had signed an agreement with the federal government for $55 million in economic readjustment funding provided that Saint John Shipbuilding be closed permanently. The Irving Group of Companies announced the intention of permanently decommissioning Canada's largest shipyard and building a new wallboard manufacturing plant and other businesses on the site.
For Canadian National Railways:
For CN Marine:
For Province of New Brunswick:
Saint John Shipbuilding services has been terminated and all work has been sent to the Halifax yards. The former dry dock cranes have been removed and the building is now Irving Wall board services. The train still can access the facility to remove shipments, but there is no and will not be in the foreseeable future.
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.