Top Qs
Timeline
Chat
Perspective

Peckham Rye railway station

National rail station in London, England From Wikipedia, the free encyclopedia

Peckham Rye railway stationmap
Remove ads

Peckham Rye is an interchange station between the Windrush line of the London Overground and National Rail services operated by Southeastern, Southern and Thameslink, located in Peckham town centre in South London.

Quick Facts Location, Local authority ...
Remove ads
Remove ads

History

It opened on 1 December 1865 for London, Chatham and Dover Railway (LCDR) trains and on 13 August 1866 for London, Brighton and South Coast Railway (LBSCR) trains.[2] It was designed by Charles Henry Driver (1832–1900), the architect of Abbey Mills and Crossness pumping stations, who also designed the grade II listed Denmark Hill and Battersea Park stations between here and London Victoria.

Layout and routes

It is between Denmark Hill and Queens Road Peckham on the Windrush line, between Denmark Hill and Nunhead on the Catford loop line, and between Queens Road Peckham and East Dulwich on the Portsmouth Line. It is in Travelcard Zone 2 and is 3 miles 36 chains (5.6 km) measured from London Bridge or 5 miles 13 chains (8.3 km) measured from London Victoria.

Peckham Rye is a major interchange served by four different routes. Its platforms are on two separate viaducts with a single ticket hall at ground level. Platforms 1 and 2 are on the south viaduct and served by Southern services (London Bridge via Tulse Hill to Beckenham Junction and East Croydon), and Windrush line (London Overground) services (Clapham Junction to Dalston Junction). Platforms 3 and 4 are on the north viaduct and served by Thameslink (Blackfriars to Sevenoaks) and Southeastern (Victoria to Dartford).

Remove ads

Station improvements

Refurbishment

Ticket gates were installed in May 2009 and during late 2010 the station was refurbished as part of a 'deep clean' by Southern. A former waiting room for platforms 2 and 3, bricked up for 55 years, was partially restored and temporarily re-opened with a permanent re-opening being planned.[3]

Future improvements

Peckham Rye is planned to become a step-free station. The project was planned to be completed in 2021, but has been delayed to 2024.[4] The step-free project, alongside a major station rebuild, is expected to request government funding in 2022, and if approved, construction will start in September 2023 and be completed in late Summer 2025.[5]

Services

Summarize
Perspective

Services at Peckham Rye are operated by London Overground (on the Windrush line), Southeastern, Southern and Thameslink using Class 377, 378, 465, 466 and 700 EMUs.

The typical off-peak service in trains per hour is:[6][7]

During the peak hours, additional services between Orpington, Kentish Town and Luton call at the station. In addition, the service to London Blackfriars is extended to and from Welwyn Garden City via Finsbury Park.

The station is also served by a limited London Overground service of one train per day to and two trains per day from Battersea Park.

On Sundays, the services between London Bridge and Beckenham Junction do not run.

Remove ads

Connections

London Buses routes 12, 37, 63, 78, 197, 343, 363, P12 and P13 and night routes N63 and N343 serve the station; some via the bus station.

In the first episode of The Sweeney, "Ringer", the station's platforms, steps, and entrance were filmed for Regan and Carter's chase on foot of Billy who had stolen Regan's girlfriend's car.[8]

It is shown in the introduction of the Channel 4 show "Desmond's".

References

Loading content...
Loading content...
Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads