Nevada Solar One

Concentrated solar power station From Wikipedia, the free encyclopedia

Nevada Solar Onemap

Nevada Solar One is a concentrated solar power plant, with a nominal capacity of 64 MW and maximum steam turbine power output up to 72 MW net (75 MW gross), spread over an area of 400 acres (160 ha). The projected CO2 emissions avoided are equivalent to taking approximately 20,000 cars off the road. The project required an investment of $266 million USD,[1] and the project officially went into operation in June 2007.[2] Electricity production is estimated to be 134 GWh (gigawatt hours) per year.[3]

Quick Facts Country, Location ...
Nevada Solar One
Thumb
Photograph of Nevada Solar One, with the Las Vegas Valley beyond the mountains behind it
Thumb
CountryUnited States
LocationEldorado Valley, Boulder City, Nevada
Coordinates35°48′N 114°58.6′W
StatusOperational
Construction beganFebruary 2006 (2006-02)
Commission dateJune 2007 (2007-06)
Construction cost$266 million
OwnerAcciona Energy
Solar farm
TypeCSP
CSP technologyParabolic trough
Site resource2,606 kWh/m2/yr
Site area400 acres (162 ha)
Power generation
Units operational1 x 75 MWe (gross)
Make and modelSiemens SST-700
Nameplate capacity72 MW
Capacity factor18.4% (2014-2018)
Annual net output115.9 GW·h
External links
Websitenevada solar one
CommonsRelated media on Commons
Close

In 2007, when the plant came on line, it was the second solar thermal energy (STE) power plant built in the United States in more than 16 years,[4] and in 2007, the largest STE plant built in the world since 1991.[5] It is located in Eldorado Valley in the southwest fringe of Boulder City, Nevada, and was built in that city's Energy Resource Zone, which requires renewable generation as part of plant development permits; Nevada Solar One was approved as part of Duke Energy's larger El Dorado Energy project, which built 1 GW of electrical generation capacity. The solar trough generation was built by Acciona Solar Power, a partially owned subsidiary of Spanish conglomerate Acciona Energy.[6] Lauren Engineers & Constructors (Abilene, TX) was the EPC contractor for the project.[7] Acciona purchased a 55 percent stake in Solargenix (formerly Duke Solar), and Acciona owns 95 percent of the project.[8] Nevada Solar One is unrelated to the Solar One power plant in California.

History

In 2006, located 30 miles (48 km) north of Tucson, Arizona Public Service's Saguaro Solar Facility opened, with 1 MW of electrical generation capacity.[9] Nevada Solar One went online for commercial use on June 27, 2007. It uses similar technology and was constructed over a period of 16 months. The total project site is approximately 400 acres (1.6 km2; 0.63 sq mi), while the solar collectors cover 300 acres (1.2 km2).

Technology

Summarize
Perspective

Nevada Solar One uses proprietary technology to track the sun's location and concentrate its rays during peak demand hours. The plant uses 760 parabolic trough concentrators with more than 182,000 mirrors that concentrate the sun's rays onto more than 18,240 solar receivers placed at the focal axis of the troughs. These contain a heat transfer fluid that heats up to 735 °F (391 °C) and is used to produce steam that drives a Siemens SST-700[10] steam turbine, adapted to the specific requirements of the CSP technology,[11] which is connected to a generator to produce electricity.

The mirrors are manufactured by Flabeg AG in Germany.[12] In contrast to the power tower concentrator concept that California's original Solar One project uses. The specially coated tubes, made of glass and steel, were designed and produced by Solel Solar Systems[13] as well as by Schott Glass in Germany.[14] Motion control was supplied by Parker Hannifin, from components by Ansco Machine Company.

Solar thermal power plants designed for solar-only generation are well matched to summer noon peak loads[dubious discuss] in areas with significant cooling demands, such as the southwestern United States. Using thermal energy storage systems, solar thermal operating periods can be extended to meet base load needs.[15] Given Nevada's land and sun resources, the state has the theoretical ability to have more than 600 GW of electrical generation capacity using solar thermal concentrators like those used by Nevada Solar One.[16] It has been proposed that massive expansion of solar plants such as Nevada Solar One has the potential to provide sufficient electricity to power the entire United States.[17]

Parabolic concentrator facilities have been successfully operating in California's Mojave Desert commercially since 1984, with a combined generating capacity of 354MW from the Solar Energy Generating Systems.[as of?]

Production

Summarize
Perspective

Nevada Solar One's production is as follows (values in GW·h).[18]

More information Year, Solar ...
YearSolarFossilTotal
200741.210.3841.59
2008122.690.91123.31
2009120.652.43123.07
2010133.001.16134.16
2011128.261.99130.26
2012128.941.39130.33
2013112.792.31115.10
2014116.232.58118.80
2015105.652.14107.79
2016116.892.24119.13
2017118.032.58120.60
2018110.382.57112.95
Close

Fossil backup, night time preservation, and morning pre-heating, is provided by natural gas and provides up to 2% of total output.

More information Year, Jan ...
Solar generation (MW·h) of Nevada Solar One [19]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
2007 1,8768,82710,25110,1866,0753,101896 41,212
2008 1,9424,83711,69614,75914,86819,30813,93512,98712,7859,1414,2072,222 122,687
2009 2,2393,97111,98213,92016,09611,63813,83916,11713,3148,7545,8382,940 120,648
2010 2,1474,14310,34913,26118,85020,67414,86317,98916,2207,1865,4761,842 133,000
2011 3,1376,3708,77214,62516,51620,69813,69816,73210,7529,4204,3333,210 128,263
2012 2,7405,8149,71913,15219,73321,71014,14012,15912,7989,6795,0032,288 128,935
2013 2,6417,02310,35514,61317,06318,40210,55210,1665,1499,3824,1423,302 112,790
2014 3,3364,97610,12012,32115,50119,69812,01111,98712,0078,1454,6091,516 116,227
2015 2,0516,3759,99313,9829,99315,33712,56511,3089,2216,6845,6242,519 105,652
2016 1,6937,7978,4038,54716,62817,83517,66912,51712,2746,7154,9241,885 116,887
2017 2,5603,87610,68313,30516,75319,67210,77013,11110,2369,8393,9083,312 118,025
2018 2842,9477,99613,49215,67719,51712,64511,29612,6367,3104,4742,105 110,379
2019 2,0414,1859,03510,89812,16816,32115,33515,31710,3169,7363,5831,306 110,241
2020 2,1056,1216,3488,28415,58115,38817,36712,7179,6348,0403,8411,940 107,366
2021 8825,5658,05613,26116,03812,1738,57111,9188,6015,4663,7611,417 95,709
2022 2,2775,0857,71711,90915,30312,20410,4306,7348,7827,3232,7911,201 91,756
2023 1,7063,1054,94211,59712,82312,97313,9719,4858,1497,4743,3191,759 91,303
Total (2007–2023)1,851,080
Close

Nevada Solar One served as inspiration for the HELIOS One solar power plant's geographic location in the 2010 videogame Fallout: New Vegas.[20]

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.