Nanded railway division

Railway division of India From Wikipedia, the free encyclopedia

Nanded railway division is one of the three railway divisions the jurisdiction of South Central Railway zone of the Indian Railways.[1][2] This railway division was formed on 1 April 2002 and its headquarter is located at Nanded in the state of Maharashtra in India. Secunderabad railway division and Hyderabad railway division are the other railway divisions under SCR Zone headquartered at Secunderabad.[3][4][5]

Routes & Jurisdiction

More information Section, Type of track ...
Section Type of track Traction Distance
Mudkhed Jn-Hazur Sahib Nanded -Purna Junction -Parbhani Jn(B.G.) Double Electric 81 km
Parbhani Jn-Aurangabad railway station-Manmad Jn(excl) (B.G.) Single Electric 290 km
Mudkhed Jn-Adilabad-Pimpal khuti(excl) (B.G.) Single Electric 185 km
Parbhani Jn-Parli Vaijnath(excl) (B.G.) Single Electric 64 km
Purna Junction -Akola Jn(excl)(B.G.) Single Electric 208 km
Akola Jn(excl)-Akot(B.G.)-Khandwa Jn(excl)(Meter Gauge) Single Electric 176 km
Total 1001 km Route
Close
  • Electrification of all the sections except akola-khandwa has been sanctioned and the work is under progress .
  • Gauge conversion is under progress between Akot and khandwa Jn(excl).


The list includes the stations under the Nanded division and their station category.[6][7][8]

More information Category of station, No. of stations ...
Category of station No. of stations Names of stations
A-1 3 Aurangabad railway station, Hazur Sahib Nanded, Parbhani Junction
A 3 Purna Junction, Jalna, Nagarsol
B 3 Mudkhed, Adilabad
C (Suburban Station) - -
D 12 Akot, Potul, Gangakher, Hingoli Deccan, Manwath Road, Partur, Rotegaon, Selu, Kinwat, Bhokar, Himayatnagar, Washim & Mukundwadi Halt
E 60
F (Halt Station) 23 Chikhalthana, Mukundwadi Halt
Total 103 -
Close

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.