List of power stations in New Zealand

From Wikipedia, the free encyclopedia

List of power stations in New Zealand

This is a list of power stations in New Zealand.

Thumb
Coal/oil/gas
Coal/oil/gas
Geothermal
Geothermal
Hydro
Hydro
Wind
Wind
Huntly
Huntly
Stratford
Stratford
Whirinaki
Whirinaki
Wairakei
Wairakei
Nga Awa Purua
Nga Awa Purua
Mokai
Mokai
Kawerau
Kawerau
Manapouri
Manapouri
Benmore
Benmore
Clyde
Clyde
Maraetai
Maraetai
Roxburgh
Roxburgh
Tokaanu
Tokaanu
Rangipo
Rangipo
Aviemore
Aviemore
Ohau A
Ohau A
Ohau B
Ohau B
Ohau C
Ohau C
Arapuni
Arapuni
Tekapo B
Tekapo B
Ohakuri
Ohakuri
Waitaki
Waitaki
Whakamaru
Whakamaru
Tararua
Tararua
West Wind
West Wind
Location of major power stations (100 MW or over) in New Zealand
KML is from Wikidata
Thumb
Graph of New Zealand electricity generation capacity by year

The list is not exhaustive – only power stations over 0.5 MW and significant power stations below 0.5 MW are listed.

Power plants in New Zealand have different generating roles – for baseload, intermediate or peaking. Baseload generators are those that run continuously (except for maintenance), and include all geothermal and run-of-the-river hydroelectric plants, which must 'use it or lose it'. Intermediate generators are load-following power plants. Peaking power plants generate only for minutes or hours at a time, during the sharpest peaks in electricity demand.[2] Nuclear power is not used in New Zealand.

Bioenergy

More information Name, Territorial authority ...
Name Territorial authority Coordinates Type Capacity (MW) Commissioned Operator
Greenmount LandfillAuckland (Howick)36°56′12″S 174°53′45″EBiogas5.51992Envirowaste / Mighty River Power[3]
KinleithSouth Waikato38°16′24″S 175°52′50″EWood cogeneration401997Oji Fibre Solutions
OmarunuiHastings39°32′48″S 176°46′57″EBiogas12014LMS Energy / Hastings District Council
Pan PacHastings39°22′41″S 176°53′19″EWood cogeneration12.82005Pan Pac Forest Products
RosedaleAuckland (Upper Harbour)36°44′50″S 174°42′58″EBiogas2.81992Mercury Energy
Silverstream LandfillLower Hutt41°09′37″S 174°59′49″EBiogas2.71994LMS Energy
Southern LandfillWellington41°19′42″S 174°44′40″EBiogas1.12022LMS Energy[4]
TirohiaHauraki37°26′11″S 175°39′21″EBiogas2.02008Mercury Energy
Redvale Landfill and Energy Park Auckland (Upper Harbour) 36°39′51″S 174°37′44″E Biogas 12 1993 Waste Management
Waipa Mill (Red Stag Timber) Rotorua 38°10′57″S 176°16′14″E Wood cogeneration 10 2018 Red Stag Timber[5]
Kate Valley Landfill Hurunui 43°05′59″S 172°50′11″E Biogas 4.3 2014 Transwaste
Close

Geothermal

Summarize
Perspective
More information Name, Territorial authority ...
Name Territorial authority Coordinates Type Capacity (MW) Commissioned Operator
Te Ahi O Maui Kawerau 38°03′47″S 176°42′10″E Binary 24 2018 Eastland Generation
Geothermal Development Limited Kawerau 38°03′38″S 176°43′21″E Binary 8 2008 Eastland Generation
Kawerau TG1 & TG2KawerauBinary61989, 1993Nova Energy
Kawerau TOPP1Kawerau38.065312°S 176.721028°E / -38.065312; 176.721028Binary262012Eastland Generation
KawerauKawerau38°03′47″S 176°43′38″EFlash steam1052008Mercury Energy
MokaiTaupō38°31′52″S 175°55′39″EBinary1122000Mercury Energy
Nga Awa PuruaTaupō38°36′50″S 176°11′02″EFlash steam1402010Mercury Energy
NgatamarikiTaupō38.54709°S 176.19497°E / -38.54709; 176.19497Binary822013Mercury Energy
NgāwhāFar North35°25′03″S 173°51′07″EBinary57Aug 2020Top Energy
OhaakiTaupō38°31′37″S 176°17′31″EFlash steam701989Contact Energy
PoihipiTaupō38°37′49″S 176°2′30″EFlash steam501997Contact Energy
RotokawaTaupō38°36′45″S 176°11′37″EBinary331997Mercury Energy
Tauhara Taupō 38.66676°S 176.15780°E / -38.66676; 176.15780 Flash steam 174 2024 Contact Energy
Te HukaTaupō38°40′1″S 176°7′5″EBinary792010

(Unit 3) 2024

Contact Energy
Te MihiTaupō38.619113°S 176.047476°E / -38.619113; 176.047476Flash steam1662014Contact Energy
Wairakei A & BTaupō38°37′37″S 176°06′19″EFlash steam & binary1321958 (Binary added 2005)Contact Energy
Close

Hydroelectric

Summarize
Perspective
More information Name, Territorial authority ...
Name Territorial authority Scheme Coordinates Capacity (MW) Commissioned Operator
AmethystWestland7.62013Westpower
AniwhenuaWhakatane38°17′37.3″S 176°47′32.5″E251980Southern Generation Partnership
ArapuniSouth WaikatoWaikato River38°04′17″S 175°38′36″E196.71929, 1946Mercury Energy
AratiatiaTaupōWaikato River38°36′57″S 176°8′33″E781964Mercury Energy
ArgyleMarlboroughBranch River41°40′15″S 173°12′12″E3.81983Manawa Energy
ArnoldGrey42°31′45″S 171°24′41″E3.01932Manawa Energy
AtiamuriSouth Waikato / TaupōWaikato River38°23′35″S 176°1′24″E841962Mercury Energy
Aviemore[6]WaitakiLower Waitaki44°39′21″S 170°21′18″E2201968Meridian Energy
Benmore[6]WaitakiLower Waitaki44°33′51″S 170°11′50″E5401965Meridian Energy
Cleardale Ashburton43°27′08.8″S 171°35′03.8″E0.92010MainPower
ClydeCentral OtagoClutha River45°10′46″S 169°18′25″E4321992Contact Energy
CobbTasman41°06′13″S 172°41′16″E34.31956Manawa Energy
ColeridgeSelwyn43°21′51″S 171°31′37″E451914Manawa Energy
Deep StreamCluthaWaipori52008Manawa Energy
DillmansWestlandKumara3.51928Manawa Energy
DuffersWestlandKumara0.51928Manawa Energy
Ellis Central Otago Teviot Scheme 7.8 1981 Pioneer Energy
FallsCentral OtagoManuherikia River1.32003Pioneer Energy
FlaxyWhakataneWheao and Flaxy2.1[7]1982Manawa Energy
Fraser (Lower)Central OtagoFraser Power Scheme2.81956Southern Generation Partnership
Fraser (Upper) Central Otago Fraser Power Scheme 8 2019 Southern Generation Partnership
George Central Otago Teviot Scheme 1 1924 (refurbished 2002) Pioneer Energy
Highbank[8]AshburtonRangitata Diversion Race43°34′24″S 171°44′08″E25.21945Manawa Energy
Hinemaiaia ATaupōHinemaiaia38°53′24″S 176°05′27″E2.01952Manawa Energy
Hinemaiaia BTaupōHinemaiaia1.31966Manawa Energy
Hinemaiaia CTaupōHinemaiaia2.81982Manawa Energy
Horseshoe BendCentral OtagoTeviot Scheme4.31999Pioneer Energy
Kaimai 5Western Bay of PlentyKaimai0.351994Manawa Energy
KaitawaWairoaWaikaremoana38°48′12″S 177°07′52″E361948Genesis Energy
Kaniere ForksWestlandLake Kaniere0.431911Manawa Energy
KarapiroWaipaWaikato River37°55′26″S 175°32′21″E901948Mercury Energy
KourarauCarterton1.01923, 1925Genesis Energy
KowhaiCentral OtagoTeviot Scheme1.92010Pioneer Energy
KuratauTaupō38°52′46.1″S 175°44′8.1″E61962King Country Energy
KumaraWestlandKumara6.51928Manawa Energy
Lloyd MandenoWestern Bay of PlentyKaimai15.61972Manawa Energy
Lower MangapapaWestern Bay of PlentyKaimai6.01979Manawa Energy
ManapouriSouthland45°31′17″S 167°16′40″E8501971Meridian Energy
MangahaoHorowhenua40°34′36″S 175°27′1″E421924Todd Energy
MangoreiNew Plymouth39°06′18.5″S 174°07′07.7″E4.51906, 1931Manawa Energy
Maraetai ISouth Waikato / TaupōWaikato River38°21′09″S 175°44′38″E2521954Mercury Energy
Maraetai IISouth Waikato / TaupōWaikato River1081971Mercury Energy
Maraetai (mini)South Waikato / Taupō0.1Mercury
MatahinaWhakatane38°06′54″S 176°48′52″E801967Manawa Energy
MatiriBuller41°39′43″S 172°20′4″E52020Southern Generation Partnership
McKays CreekWestlandLake Kaniere1.11931Manawa Energy
Michelle Central Otago Teviot Scheme 1.6 1982 Pioneer Energy
MonowaiSouthland45°46′32.5″S 167°36′59.7″E6.61926Pioneer Energy
Montalto[8]AshburtonRangitata Diversion1.81982Manawa Energy
MotukawaNew Plymouth4.51927-1938Manawa Energy
OhakuriSouth Waikato / TaupōWaikato River38°24′30″S 176°5′22″E1121962Mercury Energy
Ōhau A[6]MackenzieUpper Waitaki44°15′52″S 170°1′56″E2641980Meridian Energy
Ōhau B[6]WaitakiUpper Waitaki44°17′58″S 170°6′44″E2121984Meridian Energy
Ōhau C[6]WaitakiUpper Waitaki44°20′31″S 170°10′56″E2121985Meridian Energy
Omanawa FallsBay of Plenty37°50′46.6″S 176°05′21.3″E0.31915, extended 1921Omanawa Falls Hydro Limited
OnekakaTasman40°46′56″S 172°41′15″E0.942003Onekaka Energy
OpuhaMackenzie7.51999Opuha Water / Manawa Energy
Oxburn/GlenorchyQueenstown Lakes0.41968Pioneer Energy
PaerauCentral OtagoStrath Taieri101984Manawa Energy
PateaSouth Taranaki39°32′46″S 174°34′13″E321984Manawa Energy
PatearoaCentral OtagoStrath Taieri2.31984Manawa Energy
PiriakaRuapehu38°54′42″S 175°20′34″E1.31924King Country Energy
PiripauaWairoaWaikaremoana38°50′21″S 177°10′05″E421943Genesis Energy
PupuTasman0.31929Pupu Hydro Society
RangipoTaupōTongariro39°09′12″S 175°50′12″E1201983Genesis Energy
RimuHastingsEsk2.42013Manawa Energy
Roaring Meg lowerCentral Otago / Queentown LakesRoaring Meg3.01936Pioneer Energy
Roaring Meg upperCentral Otago / Queentown LakesRoaring Meg1.31936Pioneer Energy
RoxburghCentral OtagoClutha River45°28′33″S 169°19′21″E3201956Contact
RuahihiWestern Bay of PlentyKaimai201981Manawa Energy
Tekapo A[6]MackenzieUpper Waitaki44°00′50″S 170°27′38″E251951Genesis Energy
Tekapo B[6]MackenzieUpper Waitaki44°07′21″S 170°12′43″E1601977Genesis Energy
TokaanuTaupōTongariro38°58′52″S 175°46′06″E2401973Genesis Energy
ToronuiHastingsEsk1.42013Manawa Energy
TuaiWairoaWaikaremoana38°48′25″S 177°09′03″E601929Genesis Energy
Wahapo/Ōkārito ForksWestland 3.11960Manawa Energy
Waihi Hydro Waihi 5.0 1986 Eastland Generation
WaihopaiMarlborough39°09′12″S 175°50′12″E2.51927Manawa Energy
WaipapaSouth WaikatoWaikato River38°17′32″S 175°41′01″E511961Mercury Energy
Waipori 1ACluthaWaipori10Manawa Energy
Waipori 2ACluthaWaipori58Manawa Energy
Waipori 3CluthaWaipori7.6Manawa Energy
Waipori 4CluthaWaipori8Manawa Energy
WairereWaikato38°31′54″S 175°00′30″E4.61925King Country Energy
WairuaWhangarei35°45′27″S 174°04′03″E5.01916Northpower
Waitaki[6]WaitakiLower Waitaki44°41′23″S 170°25′34″E901935Meridian Energy
WhakamaruSouth Waikato / TaupōWaikato River38°25.178′S 175°48.493′E1241956Mercury Energy
Brooklyn (hydro) near Motueka, Tasman 0.2 1934 Brooklyn Electricity Ltd
Drysdale near Marton, Manawatu-Wanganui 0.1 Drysdale Hydro Company
Feredays Island Canterbury 0.3 2005 Kea Energy
Fox West Coast 0.2 Manawa Energy
Mangapehi Waikato 1.6 2008 Clearwater Hydro
Mangatangi Franklin, Auckland 0.6 Watercare Services
Mangatawhiri Franklin, Auckland 0.2 Counties Power
Marokopa Waitomo area, Waikato 2.0 Clearwater Hydro
Mataura near Gore, Southland 0.9 Niblick Trust
Matawai Gisborne 2.0 2009 Clearwater Hydro
Mokauiti Central North Island 1.9 1925, 1938, 1963 King Country Energy
Ngahere West Coast 0.1 Birchfield Minerals
Normanby Normanby, Taranaki 1.0 1903, 2015 Greenfern Industries
Onekaka Tasman District 1.0 Onekaka Energy
Opunake Opunake, Taranaki 0.3 Manawa Energy
Raetihi Raetihi, Manawatu-Wanganui 0.3 Manawa Energy
Rochfort Westport, West Coast 4.2 2013 Kawatiri Energy
Talla Burn Central Otago 2.6 2010 Talla Burn Generation
Teviot Bridge Roxburgh, Otago Teviot Scheme 1.1 1972 Pioneer Energy
Turitea (hydro) near Palmerston North 0.1 Palmerston North City Council
Waihi Station near Wairoa, Hawke's Bay 4.7 1913 Manawa Energy
WheaoWhakataneWheao and Flaxy38°38′00″S 176°34′41″E241982Manawa Energy
Close

Source:[9]

Decommissioned hydroelectric

More information Name, Location ...
NameLocationTypeCapacity (MW)CommissionedDecommissionedLast operatorNotes
BullendaleQueenstown2 Pelton wheels0.0418861907Phoenix MineFirst industrial generation in NZ
Okere Fallsnorth-east of Rotorua0.219011936NZ GovernmentFirst power station owned by government. Dismantled in 1941.
One Mile CreekQueenstown1 Pelton wheel0.0619241966Otago Central Electric Power BoardDecommissioned but restored as heritage exhibit in 2005
Horahoraeast of Cambridge, Waikato10.319131947State Hydro DepartmentDrowned by formation of Lake Karapiro
ReeftonReefton, West Coast<118881949Grey Electric Power BoardDemolished
Wye CreekOtago-Southland1.319362008Pioneer EnergyMothballed after turbine/generator failure
Havelock North Maraetotara Valley 0.18 (250 hp) 1922 1941 Hawke’s Bay Electric Power Board Dam used as popular swimming spot.

Decommissioned due to lightning strike damage.

Close

Heritage hydroelectric

More information Name, Location ...
NameLocationTypeOutputCommissionedOperatorPurposeNotes
MokopekaMaraetotara Valley, Hawke's BayPrivate8KW at 110V DC1891John ChambersFarming tools, heating and cooking for nearby homesteadsBelieved to be the oldest hydro electric power station in the world that still operates. Currently maintained by volunteers.

Was never connected to national grid.

Close

Fossil-fuel thermal

Summarize
Perspective
More information Name, Coordinates ...
Name Coordinates Territorial authority Type Capacity (MW) Commissioned Closed/ decommissioning date Operator
Auckland HospitalAuckland (Waitemata)Gas/diesel cogeneration3.62005Auckland DHB / Pioneer Energy
Bream BayWhangareiDiesel recip engine92011Manawa Energy
EdgecumbeWhakataneGas cogeneration101996Nova Energy
Evans BayWellingtonCoal steam turbine2319241968Wellington MED
GlenbrookAuckland (Franklin)Coal/gas waste heat1121997Alinta
Junction RoadTaranakiGas1002020 [10]Nova Energy
Huntly 1,2, & 437°32′40″S 175°09′01″EWaikatoCoal/gas steam turbine7501983Genesis Energy
Huntly 337°32′40″S 175°09′01″EWaikatoCoal/gas steam turbine25019832012Genesis Energy
Huntly 537°32′35″S 175°08′57″EWaikatoGas combined-cycle3852007Genesis Energy
Huntly 637°32′38″S 175°08′53″EWaikatoGas/diesel open-cycle482004Genesis Energy
KapuniSouth TaranakiGas combined-cycle cogeneration251998Vector / Bay of Plenty Energy
Kawerau (TPP)KawerauGas cogeneration371966Tasman Pulp and Paper
KinleithSouth WaikatoWood/gas cogeneration401998Genesis Energy
Kings WharfAuckland (Waitemata)Coal steam turbine10.519131968Auckland EPB
MangahewaNew PlymouthGas9.02008Nova Energy
Marsden AWhangareiOil24019671997ECNZ
Marsden BWhangareiOil250never commissionedECNZ
McKee (recip)New PlymouthGas reciprocating2.02008Nova Energy
McKee (turbine)New PlymouthGas open-cycle1002013Todd Generation
MeremereWaikatoCoal steam turbine21019581991ECNZ
New PlymouthNew PlymouthGas/oil steam turbine60019742008Contact Energy
Otahuhu AAuckland (Otara-Papatoetoe)Gas open cycle1968late 1990sContact Energy
Otahuhu BAuckland (Otara-Papatoetoe)Gas combined cycle40420002015Contact Energy
Palmerston North[11]Palmerston NorthTown gas/diesel reciprocating219241992Palmerston North MED
QE2 ParkChristchurchDiesel recip engine42011-2Orion New Zealand
Southdown36°55′39″S 174°49′38″EAuckland (Maungakiekie-Tamaki)Gas combined-cycle cogeneration17019972015Mercury Energy
Springlands[12]MarlboroughDiesel reciprocating1.519302003Marlborough Lines
Stratford CC39°19′56″S 174°19′8″EStratfordGas combined-cycle3771998Contact Energy
Stratford peaker39°19′56″S 174°19′8″EStratfordGas open-cycle2002010Contact Energy
Te AwamutuWaipaGas turbine5419952007Genesis Energy
Te Rapa37°42′59″S 175°13′0″EHamiltonGas cogeneration4419992023Contact Energy
Wellington HospitalWellingtonGas/oil cogeneration81981Capital & Coast DHB / Vector / Meridian Energy
WhareroaSouth TaranakiGas combined-cycle cogeneration681996Fonterra / Todd Energy
Whirinaki39°22′59″S 176°53′16″EHastingsDiesel open-cycle1552004Contact Energy
Close

Source:[9]

Wind

Summarize
Perspective
More information Name, Territorial authority ...
Name Territorial authority Coordinates Number of turbines Capacity (MW) Commissioned Closed Operator
Awhitu Waikato 36°16′S 174°40′E 1 1 2020 Private developer
Brooklyn Wind Turbine (original) Wellington 1 0.23 1993 2015 Meridian Energy
Brooklyn Wind Turbine (new) Wellington 1 0.9 2016 Meridian Energy
Chatham Islands Wind Farm Chatham Islands 44°2′13″S 176°23′0″W 2 0.46 2010 CBD Energy / Chatham Islands Enterprise Trust
Flat Hill near Bluff, Southland 46°35′S 168°17′E 8 6.8 2015[13] Pioneer Generation
Gebbies Pass Christchurch 43°41′54″S 172°38′27″E 1 0.5 2003 Windflow Technology
Harapaki Wind Farm Hawkes Bay 39°11′2″S 176°41′35″E 41 176 2024 Meridian Energy
Hau Nui South Wairarapa 41°21′42″S 175°29′2″E 15 8.7 1996, 2004 Genesis Energy
Horseshoe Bend Central Otago 3 2.3 2009 Pioneer Energy
Kaiwera Downs - Stage 1 south-east of Gore, Southland 46°14′29″S 169°3′21″E 10 43 2023 Mercury Energy
Lulworth[14] Marlborough 4 1.0 2011 Energy 3
Mahinerangi Dunedin 45°45′38″S 169°54′18″E 12 36 2011 Mercury Energy
Mill Creek Wellington 41°12′44″S 174°44′20″E 26 60 2014 Meridian Energy
Mt Stuart[15] Clutha 46°04′20″S 169°46′2″E 9 7.7 December 2011 Pioneer Energy
Southbridge Selwyn 1 0.1 2005 Energy 3
Tararua Palmerston North / Tararua 40°20′46″S 175°46′48″E 134 161 1999, 2004, 2007 Mercury Energy
Te Āpiti Palmerston North / Tararua 40°17′46″S 175°48′30″E 55 91 2004 Meridian Energy
Te Rere Hau Palmerston North / Tararua 40°23′18″S 175°43′27″E 97 48.5 2006, 2009, 2011 New Zealand Windfarms
Te Uku Waikato 37°52′42″S 174°57′47″E 28 64.4 2011 Meridian Energy / WEL Networks
Turitea Palmerston North / Turitea 40°40′28″S 175°40′17″E 60 222 2021 (stage 1)

2023 (stage 2)

Mercury Energy
Waipipi South Taranaki 39°47′S 174°33′E 31 133 2021 Mercury Energy
Weld Cone Marlborough 3 0.8 2010 Energy 3
West Wind Wellington 41°16′35″S 174°39′37″E 62 143 2009 Meridian Energy
White Hill Southland 45°45′9″S 168°16′18″E 29 58 2007 Meridian Energy
Close

Sources:[9][16][17]

Solar

More information Name, Territorial authority ...
Name Territorial authority Coordinates Number of inverters Capacity (MWp DC) Capacity (MW AC) Commissioned Closed Operator
Wairau Valley Solar Farm[18] Marlborough 41°36′31″S 173°25′50″E 1 2 2021 Kea Energy
Kapuni Solar Plant[19] South Taranaki Not Stated 2.1[20] 2021 Sunergise
Kaitaia Solar Farm[21] Northland 6 32 23 Began 2023 Lodestone Energy
Te Ihi o te Ra Solar Farm Gisborne 5.2 2023 Eastland Generation
Rangitaiki Edgecumbe 32 2024 Lodestone Energy
New Plymouth Airport Solar Farm New Plymouth 10 2025 Lodestone Energy
Lauriston Solar Farm Canterbury 63 47 2025 Genesis Energy Limited

FRV Services

Te Herenga o Te Ra Edgecumbe 42 33 2025 Lodestone Energy
Close

Grid battery storage

More information Name, Territorial authority ...
Name Territorial authority Coordinates Type Capacity (MW/MWh) Commissioned Operator
Glen InnesAuckland (Manugakiekie-Tamaki)Tesla Powerpack1.0/2.32016Vector
Hobsonville PointAuckland (Upper Harbour)Tesla Powerpack1.0/2.32018Vector
Rotohiko Waikato Saft (company) 35/33 2023 WEL Networks
Snells BeachAuckland (Rodney)2.75/6.72018Vector
Warkworth SouthAuckland (Rodney)2.0/4.82018Vector
Whangamata (CBD standby power)Thames-Coromandel2.0/2.02020Powerco
Close

Proposed power stations

Summarize
Perspective
More information Name, Location ...
NameLocationTypePlanned
capacity (MW)
OperatorStatusNotes
Awhitunear Waiuku, AucklandWind15Private operator2MW under construction[16][22]
Castle Hillnortheast of MastertonWind300Genesis Energy Limitedconsented - seeking extension[16][23][24]
Edgecumbe Solar Farm Edgecumbe Solar 38 Far North Solar Farms consented [25]
Edgecumbe Solar Farm Genesis Edgecumbe Solar 114 Genesis Energy Limited acquired from Helios. FID due mid-2025
Foxton Solar Farm Foxton Solar 42 Far North Solar Farms consented [25]
Huriwaka (prev. Central Wind)(Moawhango)between Taihape and WaiouruWind230 (prev. 130)Manawa EnergyPreviously Meridian Energy, consents lapsed, re-consenting underway with new developer Manawa Energy[16]
Te Mihi Stage 2 Taupō Geothermal 101 Contact Energy partially replaces Wairakei A & B legacy power stations - under construction. online Q3 2027 [26]
Te Mihi Stage 3 Taupō Geothermal 100 Contact Energy Final replacement of Wairakei A & B legacy power stations
Glenbrook Battery Glenbrook Battery 100 Contact Energy under construction - online Q1 2026 [27]
Hauauru ma rakiWaikato coastWind504Contact Energyconsents lapsed[16]
HurunuiNorth CanterburyWind76Meridian Energyconsents lapsed[16][28]
Huntly Battery Huntly Battery 100 Genesis Energy Limited online Q1 2027
Huntly Wind Farm Huntly Wind 200-300 Mercury Energy In design
Kaimai Wind Farm northern Kaimai Range Wind 168 Ventus Energy applied for consent [29]
Kaiwaikawe Dargaville Wind 74 Mercury Energy Under construction - first power mid 2026 [30][31]
Kawerau TOPP2 Kawerau Geothermal 50 Eastland Joint venture Eastland and Ormat. under construction [32]
Kaiwera Downs Stage 2south-east of Gore, SouthlandWind155Mercury EnergyStage 2 - 155MW - under construction - first power mid-2026 - completion mid-2027[16]
Kowhai Park Solar Farm Christchurch Solar 168 Contact, Lightsource BP Under construction - online Q2 2026 [33]
Lodestone One Dargaville Solar 80 Lodestone Energy consented [34]
Lodestone Five Whitianga Solar 34 Lodestone Energy under construction - online late 2025 [34]
Pukaki Intakenear Twizel, CanterburyHydro35Meridian Energyconsents lapsed[35]
Manawatu Battery Manawatu Battery 100 Meridian Energy applied for consent
Mahinerangi stage 2Lake Mahinerangi, west of DunedinWind138Mercury Energyconsented[16]
Marsden PointNorthlandSolar26.7Refining NZ[36]
Mount Munro Eketahuna Wind 90 Meridian Energy applied for consent [37]
Rangiriri Waikato Solar 146 Island Green Power in development [38]
Ruakākā Battery Storage Northland Battery 100 Meridian Energy under construction [39]
Ruakākā Solar Farm Northland Solar 120 Meridian Energy seeking consents
Mount CassCanterburyWind93MainPowerconsented[40]
NgakawauWest CoastHydro24Hydro DevelopmentsConsents expire 2026[35]
Ngatamariki OEC5 Taupō Geothermal 46 Mercury Energy consented - construction starts early 2024

first power late 2025

[41]
Ngawha OEC5 Kaikohe Geothermal 32 Top Energy consented [42]
Onslow Otago Pumped hydro 1200 New Zealand Government detailed investigation; cancelled after change of government [43][44]
PukenuiTe Aupōuri peninsulaSolar22Far North Solar Farmunder construction[45][46]
PuketoiManawatuWind228Mercury Energyconsents expire 2031[47]
Rakaia RiverCanterburyHydro16Ashburton Community Water Trustconsented
Rangitaiki Taupō Solar 400 Nova Energy consented [48]
RototunaNorthlandWind500Meridian Energy
Slopedowneast of Gore, SouthlandWind150Genesis Energy Limited[49]
Stratford Battery Stratford, Taranaki Battery 100 Contact Energy consented [50]
Swannanoa Christchurch Solar 200 Meridian Energy seeking consent
Taheke Okere Falls, Rotoiti Geothermal 35 Eastland consented
Taumatatotara 10 km south of Taharoa Wind 92 Ventus Energy consented stage 1 (seeking amendment for stage 2 tip height of up to 180m) [29]
Te Rere Hau Wind Farm re-power Palmerston North / Tararua Wind 126 NZ Windfarms-Meridian replace Windflow 91x500 kW with 30x4.2 MW turbines raising wind farm capacity to 126 MW
Tararua Wind Farm re-power Palmerston North / Tararua Wind 60MW uplift to 221MW Mercury Energy replace turbines for uplift of 60MW to 221MW
Tuahei Te Aroha Solar 150 First Renewables

Harmony Energy

under construction, first power 2026 [51]
Tory ChannelMarlboroughTidal10Energy Pacifica
Upper KaitunaBay of PlentyHydro14Bay of Plenty Energyconcession granted. project not being pursued
Waikato Solar Waikato Solar 100 Meridian Energy design
Waitahe Solar Farm Waiotahe Solar 81 Far North Solar Farms consented [25]
Waiinu Energy Park Taranaki Wind/Solar/

Battery

350 Wind

550 Solar

Meridian seeking fast track consent
Waerenga Waikato Solar 190 Island Green Power in development [52]
Waikato Power StationTihiroa, WaikatoGas360Todd Generationconsented (expires 2027)[53]
Western Bay Solar Project Kuratau Solar 500 Meridian seeking fast track consent
Whakamaru Battery Whakamaru Battery 150 Mercury Energy preliminary design
Close

Source:[16]

See also

References

Further reading