This is a list of the 211 operational coal-fired power stations in the United States.

Coal generated 15% of electricity in the United States in 2024,[1] an amount less than that from renewable energy or nuclear power,[2][3] and about half of that generated by natural gas plants. Coal was 16% of generating capacity.[4]
Between 2010 and May 2019, 290 coal power plants, representing 40% of the U.S. coal generating capacity, closed. This was mainly due to competition from other generating sources, primarily cheaper and cleaner natural gas, as a result of the fracking boom, which has replaced so many coal plants that natural gas in 2019 accounted for 40% of the total electricity generation in the U.S., as well as the decrease in the cost of renewables.[5] However, some coal plants remain profitable because costs to other people due to the health and environmental impact of the coal industry (estimated to average 5 cents per kWh)[6][7] are not priced into the cost of generation. Some coal plants are considering only operating during periods of higher electricity demand, from December to February and from June to August.[8] Most plants are expected to close by 2039.[9]
Remove ads
Coal-fired power stations
Summarize
Perspective
Go to: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
More information Name, State ...
Name | State | Location | Capacity (MW) |
Capacity factor | Annual generation (GWh) |
CO2 emissions annual generation (tons/year) |
CO2 emissions (tons/GWh) |
Owner | Fuel type | Retirement | Ref. |
---|---|---|---|---|---|---|---|---|---|---|---|
AES Petersburg | Indiana | 38°31′39″N 87°15′14″W | 2,146 | 48% | 6,141 (2020) | 8,708,619 (2019) | 995 (2019) | AES Indiana | Bituminous coal | 2042 (units 3–4) | [12][13][14] |
AES Puerto Rico | Puerto Rico | 17°56′45.4″N 66°09′04.5″W | 454 | 524 (2022) | AES Corporation | Coal | 2028 (planned) (units 1-2) | [15][16][14][17] | |||
Allen S. King | Minnesota | 45°01′49.2″N 92°46′45.2″W | 511 | 761 (2020) | 1,730,280 (2019) | 995 (2019) | Xcel Energy | Sub-bituminous coal | 2028 | [18][19][20] | |
Amalgamated Sugar Twin Falls | Idaho | 42°31′55″N 114°25′55″W | 10.2 | 52 (2019) | 224,652 (2019) | 4,320 (2019) | Amalgamated Sugar Company | Natural gas, bituminous coal |
[21][22][23] | ||
Antelope Valley | North Dakota | 47°22′14″N 101°50′16″W | 900 | 5,695 (2020) | 6,557,577 (2019) | 1,075 (2019) | Basin Electric Power Cooperative | Refined coal | [24][25][26] | ||
Apache | Arizona | 32°03′40″N 109°53′40″W | 408 | 2,210 (2020) | 1,458,894 (2019) | 728 (2019) | Arizona Electric Power Cooperative | Natural gas (204 MW), sub-bituminous coal (204 MW) |
2027 (unit 3)[note 1] | [27][28][29] | |
Archer Daniels Midland Cedar Rapids | Iowa | 41°55′38″N 91°41′24″W | 256 | 815 (2020) | 2,319,528 (2019) | 2,207 (2019) | Archer Daniels Midland | Sub-bituminous coal, natural gas, bituminous coal |
[30][31] | ||
Archer Daniels Midland Clinton | Iowa | 41°48′29″N 90°13′58″W | 180 | 769 (2020) | 1,652,099 (2019) | 2,143 (2019) | Archer Daniels Midland | Sub-bituminous coal | [32][33] | ||
Archer Daniels Midland Columbus | Nebraska | 41°24′59″N 97°17′11″W | 71 | 182 (2020) | 1,018,753 (2019) | 3,477 (2019) | Archer Daniels Midland | Sub-bituminous coal | [34][35] | ||
Archer Daniels Midland Decatur | Illinois | 39°51′48″N 88°53′55″W | 335 | 1,179 (2020) | 3,544,865 (2019) | 2,984 (2019) | Archer Daniels Midland | Bituminous coal, sub-bituminous coal |
[36] | ||
Archer Daniels Midland Des Moines | Iowa | 41°37′34.0″N 93°34′59.7″W | 7.9 | 25 (2019) | 122,310 (2019) | 4,892 (2019) | Archer Daniels Midland | Sub-bituminous coal | [37][38] | ||
Archer Daniels Midland Lincoln | Nebraska | 40°51′59″N 96°36′53″W | 7.9 | 27 (2019) | Archer Daniels Midland | Sub-bituminous coal | [39][40] | ||||
Argus | California | 35°45′54″N 117°22′56″W | 63 | 317 (2020) | 1,162,275 (2019) | 4,649 (2019) | Searles Valley Minerals | Refined coal | [41][22][42] | ||
Baldwin | Illinois | 42°08′17″N 88°03′31″W | 1,815 | 4,046 (2020) | 6,127,543 (2019) | 974 (2019) | Dynegy Midwest Generation | Refined coal | December 2025 | [43][44][45] | |
Belews Creek | North Carolina | 36°16′53″N 80°3′37″W | 2,240 | 41% | 5,341 (2020) | 6,215,485 (2019) | 872 (2019) | Duke Energy | Bituminous coal, natural gas |
2035 | [46][47][48] |
Belle River | Michigan | 42°46′26″N 82°29′42″W | 1,664 | 4,595 (2020) | 5,629,063 (2019) | 970 (2019) | DTE Energy | Refined coal (1,260 MW), natural gas (256 MW) |
2026 | [49][50] | |
Big Bend | Florida | 27°47′45″N 82°24′13″W | 1,821 | 45%–55% (2019) | 3,130 (2020) | 2,955,073 (2019) | 760 (2019) | TECO Energy | Natural gas, bituminous coal, solar |
N/A (unit 1) | [51][52][53][54] |
Big Cajun 2 | Louisiana | 30°43′36″N 91°22′01″W | 1,903 | 1,282 (2020) | 2,987,086 (2019) | 912 (2019) | Cleco Holdings, Entergy |
Sub-bituminous coal and refined coal (1,276.9 MW; units 1–3), natural gas (626 MW; unit 2) |
2025 (units 1 & 3) [note 2] |
[55][56][57][58][59] | |
Big Stone | South Dakota | 45°18′14″N 96°30′37″W | 451 | 1,650 (2020) | 2,698,883 (2019) | 1,031 (2019) | Otter Tail Power Company | Sub-bituminous coal | [60][61] | ||
Biron Mill | Wisconsin | 44°25′48″N 89°46′50″W | 62 | 164 (2019) | 252,089 (2019) | 1,537 (2019) | ND Paper | Sub-bituminous coal, natural gas |
[62][63] | ||
Bonanza | Utah | 40°05′11″N 109°17′11″W | 500 | 3,258 (2020) | 3,514,286 (2019) | 940 (2019) | Deseret Power | Bituminous coal | December 2033 | [64][65][14] | |
Bowen | Georgia | 34°07′23″N 84°55′13″W | 3,499 | 51% (2019) | 7,969 (2020) | 10,093,816 (2019) | 919 (2019) | Georgia Power | Bituminous coal | 2035 | [66] |
Brame, (Rodemacher 2) |
Louisiana | 31°23′49″N 92°43′09″W | 1,702 | 4,856 (2020) | 5,066,218 (2019) | 1,010 (2019) | Cleco Holdings, Lafayette Utilities System, Louisiana Energy and Power Authority |
Petroleum coke (Madison 3), sub-bituminous coal (Rodemacher 2), natural gas (Nesbitt 1) |
[67][68] | ||
Brandon Shores | Maryland | 39°10′53″N 76°32′16″W | 1,370 | 951 (2020) | 2,594,657 (2019) | 1,163 (2019) | Talen Energy | Bituminous coal | 2028 (2025)[note 3] |
[69][70][71][72] | |
Brunner Island | Pennsylvania | 40°05′44″N 76°41′49″W | 1,567 | 33% (2015) | 1,840 (2020) | 2,150,934 (2019) | 831 (2019) | Talen Energy | Natural gas, bituminous coal |
December 31, 2028 (coal) | [73][74][75] |
Canton North Carolina | North Carolina | 35°32′06″N 82°50′36″W | 52.5 | 309 (2020) | 819,429 (2018) | 2,643 (2018) | Blue Ridge Paper Products | Black liquor, bituminous coal, natural gas, wood |
2023[note 4] | [76][77][78] | |
Cardinal | Ohio | 40°15′7″N 80°38′51″W | 1,800 | 64% | 9,060 (2020) | 8,911,067 (2019) | 924 (2019) | American Electric Power | Bituminous coal | December 2030 (unit 1) | [79][80][81] |
Cayuga | Indiana | 39°55′26″N 87°25′38″W | 1,062 | 4,378 (2020) | 5,681,919 (2018) | 934 (2018) | Duke Energy | Bituminous coal | [82][83] | ||
Centralia | Washington | 46°45′20″N 122°51′36″W | 670 | 5,149 (2020) | 7,411,136 (2019) | 1,036 (2019) | TransAlta | Refined coal | December 2025 | [84][85][86] | |
Chena | Alaska | 64°50′51″N 147°44′02″W | 27.5 | 187 (2019) | 328,539 (2019) | 1,757 (2019) | Aurora Energy | Lignite | [87][88] | ||
Cholla | Arizona | 34°56′25″N 110°18′01″W | 426 | 3,150 (2020) | 3,004,568 (2019) | 1,080 (2019) | Arizona Public Service, PacifiCorp |
Sub-bituminous coal | April 2025 | [89][90][91][92] | |
Clay Boswell | Minnesota | 47°15′39″N 93°39′14″W | 923 | 4,203 (2020) | 5,052,620 (2019) | 1,050 (2019) | Minnesota Power | Refined coal | December 2029 (unit 3), unit 4 will convert |
[93][94][95] | |
Clifty Creek | Indiana | 38°44′16″N 85°25′08″W | 1,303 | 4,375 (2020) | 5,850,082 (2019) | 1,022 (2019) | Ohio Valley Electric Corporation | Bituminous coal | [96][97] | ||
Clover | Virginia | 36°52′15″N 78°42′11″W | 848 | 1,241 (2020) | 1,256,360 (2019) | 981 (2019) | Dominion Energy | Bituminous coal | 2035+ [note 5] | [98][99][100] | |
Coal Creek | North Dakota | 47°22′37″N 101°09′26″W | 1,210 | 8,218 (2020) | 8,448,452 (2019) | 1,031 (2019) | Rainbow Energy Marketing Corp | Refined coal | [101][102][14][103] | ||
Coleto Creek | Texas | 28°42′48″N 97°12′48″W | 622 | 2,530 (2020) | Dynegy | Refined coal | December 2027 | [104][105][14] | |||
Colstrip | Montana | 45°53′01″N 106°36′44″W | 740 | 7,935 (2020) | 14,231,609 (2019) | 1,061 (2019) | Talen Energy ,Puget Sound Energy |
Sub-bituminous coal | [106][107][108] | ||
Rosebud | Montana | 45°58′31″N 106°39′19.8″W | 38 | 301 (2019) | 391,154 (2019) | 1,300 (2019) | Rosebud Energy Corporation (50%), ACI Energy (25%), Harrier Power Corporation (25%) |
Waste coal | [109][110][111] | ||
Columbia | Wisconsin | 43°29′10″N 89°25′13″W | 1,023 | 5,187 (2020) | 5,299,998 (2019) | 988 (2019) | Wisconsin Power and Light Company (46.2%), Wisconsin Public Service (31.8%), Madison Gas and Electric (22%) |
Refined coal | 2029 | [112][113][114][115] | |
Colver | Pennsylvania | 40°33′14″N 78°47′54″W | 118 | 767 (2019) | 825,517 (2019) | 1,076 (2019) | Generation Holdings LP | Waste coal | 2028 | [116][117][118][119] | |
Comanche | Colorado | 38°12′30″N 104°34′34″W | 1,635 | 75% | 4,150 (2020) | 8,779,681 (2019) | 1,151 (2019) | Public Service Company of Colorado | Sub-bituminous coal, natural gas |
December 2025 (unit 2), 2035 (unit 3) |
[14][120][121][122][123] |
Conemaugh | Pennsylvania | 40°23′05″N 79°03′49″W | 1,872 | 70% | 7,530 (2020) | 9,845,117 (2019) | 895 (2019) | Public Service Enterprise Group | Refined coal, bituminous coal |
December 31, 2028 | [124][125] |
Cooper | Kentucky | 36°59′N 84°35′W | 341 | 143 (2020) | 188,137 (2019) | 1,113 (2019) | East Kentucky Power Cooperative | Bituminous coal | [126][127] | ||
Cope | South Carolina | 33°22′01″N 81°02′04″W | 417 | 965 (2020) | 1,352,606 (2019) | 730 (2019) | Dominion Energy | Natural gas, bituminous coal |
2030 | [128][129][130] | |
Coronado | Arizona | 34°34′40″N 109°16′23″W | 822 | 54% (2019) | 2,596 (2020) | 2,152,334 (2019) | 1,037 (2019) | Salt River Project | Refined coal | December 2032 | [131][14] |
Coyote | North Dakota | 47°13′18″N 101°48′56″W | 420 | 2,386 (2020) | 2,331,579 (2019) | 1,131 (2019) | Otter Tail Power Company (35%), Northern Municipal Power Agency (30%), Montana-Dakota Utilities (25%) ,NorthWestern Energy (10%) |
Lignite | [132][133][134] | ||
Craig | Colorado | 40°27′49″N 107°35′28″W | 1,428 | 6,979 (2020) | 7,924,303 (2019) | 1,000 (2019) | Tri-State Generation and Transmission Association | Sub-bituminous coal | December 2025 (unit 1), September 2028 (unit 2), December 2029 (unit 3) |
[135][136][137][14] | |
Cross | South Carolina | 33°22′9″N 80°6′51″W | 2,390 | 46% | 6,226 (2020) | 7,963,965 (2019) | 951 (2019) | Santee Cooper | Refined coal | 2027 | [138][139] |
Crystal River | Florida | 28°57′29″N 82°41′59″W | 1,434 | 45% | 14,948 (2020) | 8,019,144 (2019) | 534 (2019) | Duke Energy | Natural gas, bituminous coal |
2027 (coal) | [140][141] |
Cumberland | Tennessee | 36°23′29″N 87°39′17″W | 2,470 | 48% (2019) | 9,527 (2020) | 8,156,435 (2019) | 867 (2019) | Tennessee Valley Authority | Bituminous coal | December 2026 (unit 2), December 2028 (unit 1) |
[142][143][144] |
Curtis H. Stanton | Florida | 28°28′56″N 81°09′59″W | 1,820 | 39% | 5,789 (2020) | 5,034,732 (2019) | 815 (2019) | Orlando Utilities Commission | Bituminous coal, natural gas, landfill gas |
[145][146] | |
Dallman | Illinois | 39°45′18″N 89°36′18″W | 437 | 756 (2020) | 2,024,131 (2019) | 1,092 (2019) | City of Springfield | Bituminous coal | N/A (unit 4) | ||
Dave Johnston | Wyoming | 42°50′17″N 105°46′37″W | 816 | 4,326 (2020) | PacifiCorp | Refined coal | January 2027 (unit 3) | [147][148][14] | |||
D.B. Wilson | Kentucky | 37°45′N 87°08′W | 450 | 2,317 (2020) | 2,676,758 (2019) | 1,014 (2019) | Big Rivers Electric Corporation | Bituminous coal | [149][150] | ||
Deerhaven | Florida | 29°45′32″N 82°23′17″W | 417 | 646 (2020) | 808,276 (2019) | 1,028 (2019) | Gainesville Regional Utilities (GRU) | Bituminous coal (235 MW), natural gas (74 MW) |
[151][152][153] | ||
Dover | Ohio | 40°31′14″N 81°28′04″W | 50 | 56 (2019) | 81,930 (2019) | 1,463 (2019) | City of Dover | Bituminous coal | [154][155][156] | ||
Dry Fork | Wyoming | 44°23′20″N 105°27′39″W | 422 | 3,205 (2020) | 2,602,745 (2019) | 1,014 (2019) | Basin Electric Power Cooperative | Sub-bituminous coal | [157][158] | ||
East Bend | Kentucky | 38°54′N 84°51′W | 669 | 2,274 (2020) | 3,196,702 (2019) | 1,010 (2019) | Duke Energy | Bituminous coal | [159][160] | ||
Ebensburg | Pennsylvania | 40°27′18″N 78°44′51″W | 50 | 236 (2019) | 367,499 (2019) | 1,557 (2019) | Ebensburg Power | Waste coal | 2028 | [161][162][119] | |
E C Gaston | Alabama | 33°14′34″N 86°27′40″W | 1,880 | 3,797 (2020) | 4,324,048 (2019) | 760 (2019) | Alabama Power | Bituminous coal, natural gas |
2028 | [163][164] | |
Edgewater | Wisconsin | 43°42′56″N 87°42′23″W | 380 | 1,098 (2020) | 1,461,448 (2019) | 1,024 (2019) | Alliant Energy (majority), WEC Energy Group (minority) |
Sub-bituminous coal | December 2025 | .[165][14][166] | |
Edwardsport | Indiana | 38°47′51″N 87°15′02″W | 618 | 3,268 (2020) | 3,853,125 (2019) | 968 (2019) | Duke Energy | Syngas, natural gas, bituminous coal |
[167] | ||
E. W. Brown | Kentucky | 37°47′N 84°43′W | 464 | 1,282 (2020) | 1,354,729 (2019) | 947 (2019) | Kentucky Utilities | Bituminous coal (413 MW), natural gas, solar (10 MW) |
[168][169] | ||
Fayette | Texas | 29°55′00″N 96°45′06″W | 1,760 | 67% | 8,760 (2020) | 9,753,313 (2019) | 1,015 (2019) | Austin Energy (50%), Lower Colorado River Authority (50%) |
Refined coal | [170][171] | |
F. B. Culley | Indiana | 37°54′33″N 87°19′30″W | 369 | 923 (2020) | 1,417,332 (2019) | 1,028 (2019) | Vectren | Bituminous coal | 2027 (unit 3)[note 6] | [172][173][14][174] | |
Fernandina Beach Mill | Florida | 30°40′54″N 81°27′22″W | 118 | 612 (2020) | 411,398 (2019) | 649 (2019) | WestRock | Black liquor, natural gas, wood, bituminous coal |
[175][176] | ||
Flint Creek | Arkansas | 36°15′20″N 94°31′22″W | 528 | 2,377 (2019) | 2,499,317 (2019) | 1,051 (2019) | Southwestern Electric Power Company (50%), Arkansas Electric Cooperative Corporation (50%) |
Sub-bituminous coal | [177][178] | ||
Fort Martin | West Virginia | 39°42′37″N 79°55′40″W | 1,098 | 6,701 (2019) | FirstEnergy | Bituminous coal | [179][180] | ||||
Four Corners | New Mexico, Navajo Nation |
36°41′17″N 108°28′37″W | 1,540 | 42% | 8,917 (2019) | 8,303,298 (2019) | 931 (2019) | Arizona Public Service (66%), Southern California Edison (19.2%), others (14.8%) |
Sub-bituminous coal | December 2031 | [181][182][183] |
Gallatin | Tennessee | 36°18′53″N 86°24′01″W | 1,576 | 4,158 (2019) | 4,460,348 (2019) | 1,073 (2019) | Tennessee Valley Authority | Sub-bituminous coal (976 MW), natural gas (600 MW) |
December 2031 | [184][185][186][14] | |
General James M. Gavin | Ohio | 38°56′09″N 82°07′00″W | 2,600 | 70% | 13,894 (2019) | 12,949,967 (2019) | 932 (2019) | Lightstone Generation | Refined coal | [187] | |
George Neal North | Iowa | 42°19′29″N 96°22′48″W | 584 | 1,628 (2019) | 1,595,182 (2019) | 980 (2019) | MidAmerican Energy (72%), Interstate Power and Light (28%) |
Refined coal | [188][189] | ||
George Neal South | Iowa | 42°17′59″N 96°21′42″W | 640 | 1,544 (2019) | 1,484,993 (2019) | 962 (2019) | MidAmerican Energy (40.57%), Interstate Power and Light (25.7%), others (33.73%) |
Refined coal | [190][191] | ||
Gerald Gentleman | Nebraska | 41°04′51″N 101°08′35″W | 1,365 | 8,401 (2019) | 8,166,750 (2019) | 972 (2019) | Nebraska Public Power District | Sub-bituminous coal | [101][192] | ||
Ghent | Kentucky | 38°45′15″N 85°1′17″W | 1,919 | 67% | 10,164 (2019) | 10,471,275 (2019) | 1,030 (2019) | Kentucky Utilities | Refined coal, bituminous coal |
[193][194] | |
Gibson | Indiana | 38°22′19″N 87°46′02″W | 3,132 | 60% | 12,184 (2019) | 12,541,361 (2019) | 1,029 (2019) | Duke Energy (90.3%), IMPA (4.87%), WVPA (4.87%) |
Bituminous coal | 2037–2041 | [195][196] |
Grant Town | West Virginia | 39°33′37″N 80°09′46″W | 95.7 | 598 (2019) | American Bituminous | Waste coal | [197][198] | ||||
Harrington | Texas | 35°17′56″N 101°44′52″W | 1,018 | 3,735 (2019) | 3,907,735 (2019) | 1,046 (2019) | Xcel Energy | Sub-bituminous coal | December 2036 (unit 1), December 2038 (unit 2), December 2040 (unit 3) |
[199][200][14] | |
Harrison | West Virginia | 39°23′02″N 80°19′52″W | 1,984 | 12,894 (2019) | 12,187,539 (2019) | 945 (2019) | FirstEnergy | Refined coal | [201][202] | ||
Hawthorn | Missouri | 39°07′51″N 94°28′40″W | 1,046 | 3,092 (2019) | 3,028,125 (2019) | 979 (2019) | Kansas City Power and Light Company | Sub-bituminous coal | [203] | ||
Hayden | Colorado | 40°29′14″N 107°11′08″W | 441 | 2,571 (2019) | 2,612,504 (2019) | 1,016 (2019) | XcelEnergy | Bituminous coal | December 2027 (unit 2), December 2028 (unit 1) |
[204][205][14] | |
Healy | Alaska | 63°51′15″N 148°57′00″W | 93 | 345 (2019) | 463,902 (2019) | 1,345 (2019) | Golden Valley Electric | Lignite, waste coal |
[206] | ||
Herbert A. Wagner | Maryland | 39°10′43″N 76°31′37″W | 1,040 | 159 (2019) | 211,687 (2019) | 1,331 (2019) | Talen Energy | Bituminous coal | 2025 | [69][207][71] | |
Holcomb | Kansas | 37°55′51″N 100°58′21″W | 349 | 1,570 (2019) | 1,650,017 (2019) | 1,051 (2019) | Sunflower Electric | Sub-bituminous coal | [208][209] | ||
Hugh L. Spurlock | Kentucky | 38°41′55″N 83°49′0″W | 1,346 | 5,890 (2019) | 5,969,595 (2019) | 1,014 (2019) | East Kentucky Power Cooperative | Bituminous coal | [210][211] | ||
Hugo | Oklahoma | 34°00′49″N 95°19′32″W | 446 | 576 (2019) | 642,062 (2019) | 1,115 (2019) | Western Farmers Electric Cooperative | Sub-bituminous coal | [212][213] | ||
Hunter | Utah | 39°10′25″N 111°01′44″W | 1,577 | 8,682 (2019) | MidAmerica Energy Company, PacifiCorp |
Refined coal | 2032[214] | [215][216] | |||
Huntington | Utah | 39°22′45″N 111°04′41″W | 1,037 | 4,898 (2019) | PacifiCorp | Bituminous coal | 2032 | [217][218] | |||
Iatan | Missouri | 39°27′09″N 94°58′35″W | 1,550 | 58% | 8,562 (2019) | 7,897,401 (2019) | 922 (2019) | Evergy | Sub-bituminous coal | [219][220] | |
Independence | Arkansas | 35°40′38″N 91°24′35″W | 1,678 | 66% | 5,656 (2019) | 5,798,881 (2019) | 1,025 (2019) | Entergy | Sub-bituminous coal | 2030 | [221][222] |
Ingredion Incorporated | Illinois | 41°46′40″N 87°49′27″W | 45 | 242 (2019) | 693,731 (2019) | 2,867 (2019) | Ingredion Incorporated | Bituminous coal, natural gas |
[223][224] | ||
Intermountain | Utah | 39°30′27″N 112°34′49″W | 1,800 | 54% | 7,562 (2019) | 7,007,635 (2019) | 927 (2019) | Intermountain Power Agency | Bituminous coal, sub-bituminous coal |
June 2027 | [225][226][14] |
Iowa State University | Iowa | 42°01′40″N 93°38′24″W | 46 | 107 (2019) | Iowa State University | Bituminous coal, natural gas |
[227][228][229] | ||||
James E. Rogers | North Carolina | 35°13′02″N 81°45′40″W | 1,530 | 6,368 (2019) | 5,201,707 (2019) | 817 (2019) | Duke Energy | Bituminous coal, natural gas |
December 2026 (unit 5) | [230][231][14] | |
James H. Miller Jr. | Alabama | 33°37′55″N 87°03′38″W | 2,640 | 79% | 18,491 (2019) | 17,826,649 (2019) | 964 (2019) | Alabama Power | Sub-bituminous coal | [232] | |
James M. Barry | Alabama | 31°0′22″N 88°0′40″W | 2,671 | 12,471 (2019) | 6,992,896 (2019) | 561 (2019) | Alabama Power | Natural gas, bituminous coal |
[233][234] | ||
Jeffrey | Kansas | 39°17′10″N 96°7′1″W | 2,160 | 50% | 6,574 (2019) | 7,583,549 (2019) | 1,154 (2019) | Evergy (50%), Black Hills Corporation (50%) |
Sub-bituminous coal | [235] | |
J. H. Campbell | Michigan | 42°54′43.5″N 86°12′08.3″W | 1,420 | 8,402 (2019) | 7,917,510 (2018) | 942 (2019) | CMS Energy | Sub-bituminous coal | May 2025 | [236][237][238] | |
Jim Bridger | Wyoming | 41°44′15″N 108°47′14″W | 2,110 | 59% | 11,255 (2019) | MidAmerican Energy | Sub-bituminous coal | 2028 (unit 2), 2037 (units 3–4) |
[135][239][240] | ||
J K Spruce | Texas | 29°18′26″N 98°19′13″W | 1,444 | 6,692 (2019) | 6,470,826 (2019) | 967 (2019) | CPS Energy | Sub-bituminous coal | 2030 | [241][242][243] | |
John B. Rich Memorial | Pennsylvania | 40°47′26″N 76°11′53″W | 88.4 | 624 (2019) | 795,758 (2019) | Gilberton Power | Waste coal | 2028 | [244][245][119] | ||
John E. Amos | West Virginia | 38°28′29″N 81°49′16″W | 2,933 | 50% | 9,796 (2019) | 12,145,020 (2018) | American Electric Power | Bituminous coal | [246] | ||
John P. Madgett | Wisconsin | 44°18′11″N 91°54′45″W | 369 | 1,535 (2019) | 2,080,026 (2018) | Dairyland Power Cooperative | Sub-bituminous coal | [247][248] | |||
John Twitty | Missouri | 37°09′06″N 93°23′18″W | 494 | 1,785 (2019) | 1,927,948 (2017) | City of Springfield | Sub-bituminous coal | [249] | |||
John W. Turk Jr. | Arkansas | 33°39′02″N 93°48′42″W | 600 | 4,015 (2019) | 3,690,501 (2018) | American Electric Power (73%), Arkansas Electric Cooperative Corporation (12%), East Texas Electric Cooperative (8%), Oklahoma Municipal Power Authority (7%) |
Sub-bituminous coal | [250][251] | |||
J Robert Welsh | Texas | 33°03′18″N 94°50′22″W | 1,056 | 4,545 (2019) | 5,889,068 (2018) | Southwestern Electric Power Company | Sub-bituminous coal | January 2028 | [252][80][81][14] | ||
Keystone | Pennsylvania | 40°39′35″N 79°20′28″W | 1,711 | 83% | 11,005 (2019) | 11,190,515 (2018) | Public Service Enterprise Group (22.84%), ArcLight (20.91%), others (56.25%) |
Refined coal | December 31, 2028 | [253][125] | |
Kincaid | Illinois | 39°35′N 89°29′W | 1,320 | 3,115 (2019) | 5,042,995 (2018) | Dynegy | Sub-bituminous coal | December 2027 | [254][255][14] | ||
Kingston | Tennessee | 35°53′54″N 84°31′08″W | 1,398 | 3,320 (2019) | 3,313,787 (2018) | Tennessee Valley Authority | Bituminous coal, sub-bituminous coal |
December 2026 (units 7–9), December 2027 (units 1–6) |
[256][257][144][14] | ||
Kyger Creek | Ohio | 38°54′55″N 82°07′42″W | 1,086 | 5,515 (2019) | 5,809,638 (2018) | Ohio Valley Electric Corporation | Bituminous coal | [258][259] | |||
Labadie | Missouri | 38°33′44″N 90°50′16″W | 2,372 | 76% | 15,766 (2018) | 15,758,937 (2018) | 999.55 | Ameren | Sub-bituminous coal, refined coal |
2036 (first two units), 2042 (last two units) |
[260][261][262] |
La Cygne | Kansas | 38°20′53″N 94°38′41″W | 1,422 | 5,798 (2019) | 5,647,055 (2018) | Kansas City Power and Light Company, Westar Energy |
Sub-bituminous coal | [263][264] | |||
Laramie River Station | Wyoming | 42°6′26″N 104°53′14″W | 1,710 | 72% (2018) | 9,032 (2019) | 10,559,027 (2018) | Basin Electric Power Cooperative | Refined coal | [265][266] | ||
Lawrence | Kansas | 39°00′28″N 95°16′07″W | 517 | 2,422 (2019) | 3,062,018 (2018) | Evergy | Sub-bituminous coal | December 31, 2028 | [267][268][269][270] | ||
Leland Olds | North Dakota | 47°16′54″N 101°19′10″W | 669 | 3,605 (2019) | 3,863,058 (2018) | Basin Electric Power Cooperative | Lignite, refined coal |
[271][272] | |||
Limestone | Texas | 31°25′24″N 96°15′5″W | 1,850 | 59% | 8,700 (2019) | 9,814,811 (2018) | NRG Energy | Sub-bituminous coal | January 2030 | [273][14][274] | |
Lon D. Wright | Nebraska | 41°25′41″N 96°27′44″W | 130 | 649 (2019) | 521,858 (2019) | City of Fremont | Sub-bituminous coal, wind |
[275][276] | |||
Longview | West Virginia | 39°42′27″N 79°57′24″W | 700 | 5,265 (2019) | 4,329,229 (2018) | Longview Power | Bituminous coal | [277] | |||
Louisa | Iowa | 41°19′01″N 91°05′37″W | 812 | 3,346 (2019) | 4,816,701 (2018) | MidAmerican Energy (88%), Interstate Power and Light (4%), Central Iowa Power Cooperative (4.6%), others (3.4%) |
Refined coal | 2040 | [278][279] | ||
Major Oak | Texas | 31°05′29″N 96°41′34″W | 349 | 2,414 (2019) | Blackstone Group | Lignite | [280][281] | ||||
Marion | Illinois | 37°37′14″N 88°57′18″W | 272 | 1,652 (2019) | 1,828,122 (2018) | Southern Illinois Power Cooperative | Bituminous coal | [282][283] | |||
Marshall | North Carolina | 35°35′51″N 80°57′53″W | 1,996 | 49% | 7,787 (2019) | 7,535,293 (2018) | Duke Energy | Bituminous coal | December 2034 (unit 1–2) | [284] | |
Martin Lake | Texas | 32°15′42″N 94°33′53″W | 2,250 | 71% | 12,105 (2019) | Luminant | Lignite, sub-bituminous coal |
[285] | |||
Mayo | North Carolina | 36°31′40″N 78°53′09″W | 727 | 1,526 (2019) | 1,721,693 (2018) | Duke Energy | Bituminous coal | December 2035 | [286][287][288] | ||
Merom | Indiana | 39°04′04″N 87°30′41″W | 1,080 | 4,591 (2019) | 5,716,946 (2018) | Hoosier Energy | Bituminous coal | [289][290][274] | |||
Merrimack[note 7] | New Hampshire | 43°08′29″N 71°28′07″W | 496 | 302 (2019) | 264,399 (2018) | Granite Shore Power | Bituminous coal | 2028 | [291][292][293][274] | ||
Miami Fort | Ohio | 39°06′56″N 84°48′18″W | 1,115 | 6,974 (2019) | 5,321,490 (2018) | Dynegy | Bituminous coal | December 2027 | [294][14] | ||
Michigan City | Indiana | 41°43′16″N 86°54′35″W | 680 | 1,073 (2019) | 2,146,752 (2018) | NiSource | Bituminous coal | May 2028 | [295][296][274] | ||
Mill Creek | Kentucky | 38°03′N 85°55′W | 1,717 | 8,258 (2019) | 8,534,037 (2018) | Louisville Gas & Electric | Refined coal | 2027 (units 1 & 2) | [297][298] | ||
Milton R. Young | North Dakota | 47°03′58″N 101°12′50″W | 705 | 4,705 (2019) | 5,284,291 (2018) | Minnkota Power Cooperative | Refined coal | [299][300] | |||
Mitchell | West Virginia | 39°49′47.99″N 80°49′4.79″W | 1633 | 5,041 (2019) | 5,538,641 (2018) | Appalachian Power Company (50%), Kentucky Power (50%) |
Bituminous coal | [301][302] | |||
Monroe | Michigan | 41°53′21″N 83°20′44″W | 3,400 | 55% | 15,322 (2019) | 15,769,057 (2018) | DTE Energy | Refined coal | 2028 | [303][50] | |
Mountaineer | West Virginia | 38°58′42″N 81°56′08″W | 1,300 | 8,255 (2019) | 5,401,403 (2018) | American Electric Power | Bituminous coal | [304][305] | |||
Mount Storm | West Virginia | 39°12′03″N 79°15′46″W | 1,602 | 4,533 (2019) | 5,348,160 (2018) | Dominion Energy | Bituminous coal | [306][307] | |||
Mt. Carmel Cogen | Pennsylvania | 40°48′40″N 76°27′14″W | 47.3 | 81 (2019) | 134,609 (2019) | Mount Carmel Cogen | Waste coal | 2028 | [308][309][119] | ||
Muscatine | Iowa | 41°23′21″N 91°03′31″W | 293.5 | 695 (2019) | 1,114,601 (2018) | Board of Water Electric and Communications | Refined coal | [310][311] | |||
Muskogee | Oklahoma | 35°45′42″N 95°17′15″W | 1,716 | 1,551 (2019) | 4,259,912 (2018) | Oklahoma Gas and Electric Company | Natural gas (1,144MW), sub-bituminous coal (573 MW) |
[312][313] | |||
Muskogee Mill | Oklahoma | 35°43′57″N 95°17′38″W | 114 | 373 (2019) | 560,787 (2019) | Koch Industries | Sub-bituminous coal (89 MW), natural gas (25 MW) |
[314][315] | |||
Naughton | Wyoming | 41°45′26″N 110°35′52″W | 707 | 2,813 (2019) | PacifiCorp | Sub-bituminous coal | 2025 | [316][317] | |||
Nearman Creek | Kansas | 39°10′14″N 94°41′51″W | 235 | 1,068 (2019) | 1,039,764 (2018) | City of Kansas City | Sub-bituminous coal | [318][319] | |||
Nebraska City | Nebraska | 40°37′26″N 95°46′38″W | 1,212 | 6,812 (2019) | 8,833,311 (2018) | Omaha Public Power District | Sub-bituminous coal | [320][321] | |||
New Madrid | Missouri | 36°30′58″N 89°33′50″W | 1,200 | 6,881 (2019) | 7,179,989 (2018) | Associated Electric Cooperative | Refined coal | [322][323] | |||
Newton | Illinois | 38°56′10″N 88°16′40″W | 617 | 3,201 (2019) | Vistra Energy | Refined coal | December 2027 | [324][325][14] | |||
Northampton | Pennsylvania | 40°41′28″N 75°28′45″W | 134 | 154 (2019) | Olympus Power | Waste coal | 2028 | [326][327][328][119] | |||
Northeastern | Oklahoma | 36°25′35″N 95°42′03″W | 946 | 4,639 (2019) | 3,709,621 (2018) | Public Service Company of Oklahoma | Natural gas (50%), sub-bituminous coal (50%) |
2026 (unit 3; 469 MW) | [329][330][80][81] | ||
North Omaha | Nebraska | 41°19′43″N 95°56′57″W | 627 | 1,873 (2019) | 1,823,417 (2018) | Omaha Public Power District | Sub-bituminous coal | 2026 (converting to gas) | [331][332][333][334] | ||
Northside | Florida | 30°25′43″N 81°33′10″W | 1,300 | 3,878 (2019) | 3,551,547 (2018) | JEA | Natural gas, petroleum coke, bituminous coal |
[335] | |||
North Valmy | Nevada | 40°52′50″N 117°09′08″W | 567 | 14% (2017) | 1,450 (2018) | 1,645,434 (2018) | Sierra Pacific Power | Bituminous coal, sub-bituminous coal |
December 2025 | [135][336][337][338] | |
Oak Creek, (Elm Road) |
Wisconsin | 42°50′40″N 87°49′43″W | 1,135 | 7,748 (2020) | WE Energies | Refined coal, bituminous coal |
May 2024 (units 5 and 6), 2025 (units 7 and 8) |
[339][340][341] | |||
Oak Grove | Texas | 31°10′53″N 96°29′17″W | 1,796 | 78% | 12,407 (2019) | 11,676,507 (2018) | Luminant | Refined coal | [342] | ||
Ottumwa | Iowa | 41°05′49″N 92°33′19″W | 726 | 3,791 (2019) | 3,724,042 (2018) | MidAmerican Energy (52%), Interstate Power and Light (48%) |
Sub-bituminous coal | [343][344] | |||
Panther Creek | Pennsylvania | 40°51′17″N 75°52′42″W | 94 | 105 (2019) | 137,092 (2019) | Panther Creek Power Operating LLC | Waste coal | 2028 | [345][346][119] | ||
Pawnee | Colorado | 40°13′11″N 103°40′43″W | 505 | 2,510 (2019) | 3,503,839 (2018) | Xcel Energy | Sub-bituminous coal | 2028 (converting to gas) | [347][348] | ||
Platte | Nebraska | 40°51′17″N 98°20′53″W | 100 | 505 (2019) | 591,747 (2019) | City of Grand Island | Sub-bituminous coal | [349][350] | |||
Pleasants Power Station | West Virginia | 39°22′01″N 81°17′41″W | 1300 | Energy Harbor | Refined coal | [351][14] | |||||
Plum Point | Arkansas | 35°39′47″N 89°56′48″W | 680 | 3,945 (2019) | 4,791,733 (2018) | NRG Energy | Sub-bituminous coal | [352][353] | |||
Powerton | Illinois | 40°32′28″N 89°40′48″W | 1,536 | 34% | 2,335 (2019) | 5,169,444 (2018) | NRG Energy | Sub-bituminous coal | [354][355] | ||
Prairie Creek | Iowa | 41°56′39″N 91°38′20″W | 213 | 43 (2019) | 198,803 (2018) | Interstate Power and Light | Sub-bituminous coal | December 2025 (units 1–2) | [356][357] | ||
Prairie State | Illinois | 38°16′40″N 89°40′4″W | 1,600 | 82% | 12,053 (2019) | 10,109,017 (2018) | Prairie State Energy Campus | Bituminous coal | [358] | ||
Purdue University | Indiana | 40°25′02.0″N 86°54′43.9″W | 43.2 | 158 (2019) | 274,173 (2019) | Purdue University | Natural gas, bituminous coal |
[359][360] | |||
Rawhide | Colorado | 40°51′36″N 105°01′29″W | 280 | 2,038 (2019) | 1,812,653 (2018) | Platte River Power Authority | Sub-bituminous coal | December 2029 | [361][362][274][363] | ||
Ray Nixon | Colorado | 38°38′00″N 104°42′24″W | 207 | 1,245 (2019) | 1,152,894 (2018) | City of Colorado Springs | Sub-bituminous coal | December 2029 | [364][365][366][274] | ||
Red Hills | Mississippi | 33°22′17″N 89°13′02″W | 514 | 2,367 (2019) | 2,977,203 (2018) | NAES | Refined coal, lignite |
[367][368] | |||
River Valley | Oklahoma | 35°11′38″N 94°38′44″W | 350 | 539 (2019) | 2,077,873 (2018) | Oklahoma Gas and Electric Company | Sub-bituminous coal, bituminous coal |
[369][370] | |||
R.M. Schahfer | Indiana | 41°13′1″N 87°1′16″W | 1,040 | 5,493 (2019) | 7,296,996 (2018) | NiSource | Bituminous coal | 2025 | [371][372][274][373][374] | ||
Rockport | Indiana | 37°55′32″N 87°02′02″W | 2,600 | 8,147 (2019) | 11,629,822 (2018) | Indiana-Michigan Power | Sub-bituminous coal, bituminous coal |
December 2028 | [375][80][81] | ||
Roxboro | North Carolina | 36°28′44″N 79°04′15″W | 2,422 | 28% | 6,947 (2019) | 5,719,006 (2018) | Duke Energy | Bituminous coal | 2033 | [376][377] | |
Roy S. Nelson | Louisiana | 30°17′00″N 93°17′19″W | 614.6 | 3,221 (2019) | 5,052,953 (2018) | Entergy | Sub-bituminous coal, petroleum coke |
2028 | [378][379][59] | ||
Sandy Creek | Texas | 31°28′30″N 96°57′26″W | 1,008 | 5,027 (2019) | 5,868,439 (2018) | Sandy Creek Energy Associates | Sub-bituminous coal | [380][381] | |||
San Miguel | Texas | 28°42′16″N 98°28′37″W | 410 | 2,077 (2019) | 3,028,257 (2018) | San Miguel Electric Cooperative | Lignite | [382][383] | |||
Scherer | Georgia | 33°03′45″N 83°48′14″W | 3,520 | 50% | 7,031 (2022) | 8,933,998 (2021) | Oglethorpe Power (30%), Georgia Power (22.95%), others (47.05%) |
Sub-bituminous coal | 2025 (unit 3), N/A (units 1–2) |
[384][385][386][387] | |
Scrubgrass | Pennsylvania | 41°16′07″N 79°48′49″W | 94.7 | 241 | 343,007 | Scrubgrass Generating Company | Waste coal | 2028 | [388][389][119] | ||
Seminole | Florida | 29°44′16″N 81°38′05″W | 735.9 | 7,054 (2019) | 7,200,873 (2018) | Seminole Electric Cooperative | Bituminous coal | [390][391][392][393] | |||
Seward | Pennsylvania | 40°24′22″N 79°02′01″W | 585 | 1,867 (2019) | 1,928,181 (2019) | Seward Generating | Waste coal | 2028 | [394][395][119] | ||
Shawnee | Kentucky | 37°09′N 88°46′W | 1,750 | 5,676 (2019) | 6,853,097 (2018) | Tennessee Valley Authority | Sub-bituminous coal | December 2033 | [396][397][398][14] | ||
Sheldon | Nebraska | 40°33′33″N 96°47′05″W | 225 | 739 (2019) | 1,026,151 (2018) | Nebraska Public Power District | Sub-bituminous coal | [399][400] | |||
Sherburne County | Minnesota | 45°22′43″N 93°53′48″W | 2,238 | 64% | 10,753 (2019) | 12,617,304 (2018) | Northern States Power Company | Sub-bituminous coal | December 2025 (unit 1), December 2034 (unit 3) |
[401][402] | |
Sikeston | Missouri | 36°52′45″N 89°37′15″W | 261 | 1,619 (2019) | 1,835,335 (2018) | City of Sikeston | Sub-bituminous coal | [403][404] | |||
Silver Bay | Minnesota | 47°17′12″N 91°15′38″W | 132 | 182 (2019) | 489,746 (2018) | Cleveland-Cliffs Inc. | Sub-bituminous coal | [405][406] | |||
Sioux | Missouri | 38°54′54″N 90°17′22″W | 974 | 3,886 (2019) | 5,874,772 (2018) | Union Electric Company | Refined coal | December 2028 | [407][14] | ||
Sooner | Oklahoma | 36°27′14″N 97°03′10″W | 1,138 | 3,610 (2019) | 4,674,868 (2018) | Oklahoma Gas and Electric Company | Sub-bituminous coal | [408][409] | |||
Southern Illinois University Carbondale | Illinois | 37°42′42.3″N 89°12′55.3″W | 5.1 | 8 (2019) | 88,579 (2019) | Southern Illinois University | Bituminous coal | [410][411] | |||
Spiritwood | North Dakota | 46°55′32.1″N 98°30′02.2″W | 99 | 181 (2019) | 462,292 (2018) | Great River Energy | Natural gas, lignite, refined coal |
[412][413] | |||
Springerville | Arizona | 34°19′4″N 109°9′55″W | 1,638 | 73% | 7,945 (2019) | 8,159,371 (2019) | Salt River Project | Sub-bituminous coal (1625 MW), solar (13.4 MW) |
2027 (unit 1), 2032 (unit 2), 2031 (unit 3) |
[414][415][416][417][418] | |
St. Nicholas Cogen | Pennsylvania | 40°49′21″N 76°10′24″W | 99.2 | 600 (2019) | Schuylkill Energy Resource Inc | Waste coal | 2028 | [419][420][119] | |||
Sunnyside Cogen | Utah | 39°32′46″N 110°23′28″W | 58.1 | 401 (2019) | 455,275 (2019) | Sunnyside Cogen Associates | Waste coal | [421][422] | |||
Tennessee Eastman Operations | Tennessee | 36°31′19″N 82°32′35″W | 195 | 1,155 (2019) | 2,867,087 (2018) | Eastman Chemical Company | Bituminous coal, natural gas |
[423][424] | |||
TES Filer City | Michigan | 44°13′02″N 86°17′24″W | 73 | 453 (2019) | 563,562 (2018) | TES Filer city | Bituminous coal, natural gas, biomass |
June 2025 | [425][426][427] | ||
Thomas Hill | Missouri | 39°33′02″N 92°38′15″W | 1,135 | 8,112 (2019) | 7,212,753 (2018) | Associated Electric Cooperative | Refined coal | [428][429] | |||
Tolk | Texas | 34°11′00″N 102°34′10″W | 1,067 | 2,742 (2019) | 3,844,953 (2018) | Xcel Energy | Sub-bituminous coal | December 2037 | [430] | ||
Trimble County | Kentucky | 38°35′05″N 85°24′43″W | 2,234 | 8,823 (2019) | 8,015,909 (2018) | Louisville Gas & Electric | Refined coal (1,274 MW), natural gas (960 MW) |
[431][432] | |||
University of Alaska Fairbanks[note 8] | Alaska | 64°51′14″N 147°49′20″W | 17 | 28 (2019) | 111,806 (2018) | University of Alaska | Sub-bituminous coal | [433][434][435] | |||
University of Illinois Abbott | Illinois | 40°06′17″N 88°14′32″W | 47 | 167 (2019) | 164,582 (2019) | University of Illinois | Natural gas, bituminous coal |
[436][437][438] | |||
University of North Carolina Chapel Hill Cogen | North Carolina | 35°54′23″N 79°03′44″W | 32 | 51 (2019) | 199,567 (2018) | University of North Carolina | Bituminous coal, natural gas |
[439][440][441][442] | |||
Victor J. Daniel | Mississippi | 30°31′48″N 88°33′22″W | 2,084 | 10,355 (2019) | 5,703,976 (2018) | Mississippi Power (50%), Gulf Power (50%) |
Natural gas (1081 MW), sub-bituminous and bituminous coal (1004 MW) |
May 2027 | [443][444][445][446] | ||
Virginia City | Virginia | 36°54′55″N 82°20′23″W | 600 | 1,185 (2019) | 2,571,065 (2018) | Virginia Electric and Power Company | Bituminous coal, wood |
2045 | [447][448] | ||
Walter Scott Jr. | Iowa | 41°11′08″N 95°50′32″W | 1,648 | 8,014 (2019) | 9,214,542 (2018) | MidAmerican Energy (majority), Central Iowa Power Cooperative, Lincoln Electric Systems, 12 others |
Refined coal | [449][450] | |||
W. A. Parish | Texas | 29°28′34″N 95°38′0″W | 3,653 | 14,328 (2019) | NRG Energy | Sub-bituminous coal, natural gas |
December 2044 (coal) | [451][14] | |||
Warrick | Indiana | 37°54′53″N 87°20′01″W | 755 | 4,215 (2019) | Alcoa | Bituminous coal | [452][453] | ||||
Wateree | South Carolina | 33°49′35″N 80°37′19″W | 772 | 2,061 (2019) | 3,633,686 (2018) | Dominion Energy | Bituminous coal | 2028 | [129][454][130] | ||
Western Sugar | Nebraska | 41°51′32″N 103°38′04″W | 5 | 28 (2019) | 194,266 (2018) | Western Sugar Cooperative | Sub-bituminous coal | [455][456] | |||
Weston | Wisconsin | 44°51′31″N 89°38′59″W | 1,076 | 4,409 (2019) | 4,114,169 (2018) | WEC Energy Group, Wisconsin Public Service Corporation |
Refined coal | 2031 (Unit 3) | [457][458] | ||
Westwood | Pennsylvania | 40°37′08″N 76°27′04″W | 36 | 127 (2019) | 207,832 (2019) | Rausch Creek Generation LLC | Waste coal | 2028 | [459][460][119] | ||
Whelan | Nebraska | 40°34′50″N 98°18′39″W | 324 | 1,418 (2019) | 2,272,356 (2018) | City of Hastings | Sub-bituminous coal, refined coal |
[461][462] | |||
White Bluff | Arkansas | 34°25′25″N 92°08′26″W | 1,659 | 8,252 (2018) | 8,273,947 (2018) | Entergy | Sub-bituminous coal | 2030 | [463][464] | ||
Whitewater Valley | Indiana | 39°48′07″N 84°53′43″W | 100 | 39 (2019) | 49,447 (2019) | Indiana Municipal Power Agency | Bituminous coal | [465][466][467] | |||
Williams Station | South Carolina | 33°00′59″N 79°55′44″W | 633 | 2,557 (2019) | 2,759,206 (2018) | Dominion Energy | Refined coal, bituminous coal |
2028 | [129][468][130] | ||
Winyah | South Carolina | 33°19′51″N 79°21′28″W | 1,260 | 1,583 (2019) | 1,582,699 (2018) | Santee Cooper | Refined coal | December 2028 | [469][470][14] | ||
Wygen | Wyoming | 44°17′09″N 105°23′00″W | 176 | 703 (2019) | Black Hills Power | Sub-bituminous coal | [471][472] | ||||
Wyodak | Wyoming | 44°17′20″N 105°23′06″W | 402 | 1,851 (2019) | PacifiCorp (80%), South Dakota Electric (20%) |
Sub-bituminous coal | 2039 | [473][474] | |||
Close
**The fuel type that is at the top of the section of each power plant is the most used fuel, and the one at the bottom is the least used. For example, Williams Station uses more refined coal than bituminous coal.**
**Refined coal is lower grade sub-bituminous or lignite coal that is treated to create less toxins when burned and is supported by government subsidies.**
**Muskogee Mill and Muskogee power plants are different, despite being in the same state, and are not duplicates.**
Remove ads
See also
Notes
- Converting to LNG
- Unit 2 (626 MW) stopped burning coal in 2015, and was converted to a 540 MW gas plant in 2016.
- PJM Interconnection did not approve 2025 closure; Brandon Shores may stay online until 2028.
- Offline (not yet defunct) - The mill in Canton, N.C. has been sold to Two Banks Development to be transformed into industrial, commercial and residential projects. It is unclear if restarting the coal plant is part of the project.
- Stated as "until at least the late 2030s"
- Converting to LNG
- Peaking plant and last coal-fired power plant in New England