Nuclear power plant in Guangdong, China From Wikipedia, the free encyclopedia
Ling Ao Nuclear Power Plant (岭澳核电站) is located on the Dapeng Peninsula in Longgang District, Shenzhen, Guangdong, China, about 60 km north of Hong Kong, 1 km north of Daya Bay Nuclear Power Plant. It is operated by China General Nuclear Power Group. The units on site are separated between phase I and phase II.
Ling Ao Nuclear Power Plant | |
---|---|
Official name | 岭澳核电站 |
Country | China |
Location | Longgang District, Shenzhen, Guangdong |
Coordinates | 22°36′17.24″N 114°33′05.36″E |
Status | Operational |
Construction began | |
Commission date | |
Owners | Daya Bay Nuclear Power Operations and Management Company |
Operator | Lingao Nuclear Power Company Ltd.[1][2][3][4] |
Nuclear power station | |
Reactors | 4 (2 in Phase I, 2 in Phase II) |
Reactor type | PWR |
Cooling source | South China Sea |
Thermal capacity | |
Total electricity generated | 448.55 TWh (1,614.8 PJ) (by the end of 2021)[1][2][3][4] |
Power generation | |
Units operational | |
Make and model |
|
Nameplate capacity | 3914 MWe |
Capacity factor | |
Annual net output | 30,263.51 GWh (108,948.6 TJ) (2021) |
The plant was one of China's largest energy projects of the latter 1990s.[5]: 45
Ling Ao phase I has two nuclear reactors, 950 MWe PWRs Ling Ao I-1 and I-2, based on the French 900 MWe three cooling loop design (M310), which started commercial operation in 2002 and 2003.[6] The planned investment sum for phase I was ca 4 billion USD.[7]
In a Phase II development two CPR-1000 reactors, Ling Ao II-1 and II-2 (alternatively, units 3 and 4), were constructed in conjunction with Areva, based on the French three cooling loop design. Ling Ao II-1, China’s first domestic CPR-1000 nuclear power plant, was first connected to the grid on 15 July 2010,[8] having started criticality testing on 11 June 2010.[9] It started commercial operations on 27 September 2010.[10] Ling Ao II-2 was synchronized to the grid on May 3, 2011, with commercial operation beginning on August 7, 2011.[11]
The Ling Ao Nuclear Power Plant consist of 4 operational reactors.[12]
Unit | Type | Model | Net power | Gross power | Thermal power | Construction start | First criticality | Grid connection | Operation start | Notes |
---|---|---|---|---|---|---|---|---|---|---|
Ling Ao 1 | PWR | M310 | 950 MW | 990 MW | 2905 MW | 1997-5-15 | 2002-02-04 | 2002-02-26 | 2002-05-28 | [13] |
Ling Ao 2 | PWR | M310 | 950 MW | 990 MW | 2905 MW | 1997-11-28 | 2002-08-27 | 2002-09-14 | 2003-01-08 | [14] |
Ling Ao 3 | PWR | CPR-1000 | 1007 MW | 1086 MW | 2905 MW | 2005-12-15 | 2010-06-09 | 2010-07-15 | 2010-09-15 | [15] |
Ling Ao 4 | PWR | CPR-1000 | 1007 MW | 1086 MW | 2905 MW | 2006-6-15 | 2011-02-25 | 2011-05-03 | 2011-08-07 | [16] |
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.