Loading AI tools
Future metro line in Buenos Aires From Wikipedia, the free encyclopedia
Line F is a planned addition to the Buenos Aires Underground. In 2019, the government of Buenos Aires was looking for a group to create a plan of the line,[1][2] but this study was cancelled in 2022.[3] The city decided to create a study with their own staff, which is still underway as of 2024. The estimated cost of the project has risen from 800 million dollars,[4] to 2 billion USD.[5]
Line F | |
---|---|
Overview | |
Status | In development |
Termini |
|
Stations | 13 |
Service | |
Type | Rapid transit |
System | Buenos Aires Underground |
Operator(s) | Metrovías |
History | |
Opened | 2022/2023 (planned) |
Technical | |
Line length | 8.6km |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Permission to construct the line was originally granted in 2001,[1] in a sanction which also included lines H (partially completed) and line I (not started).
The line is set to be the most modern in the network, using automatic trains, a communications-based train control system like the one being installed on Line C, and platform screen doors.[6][2]
The line is also expected to have the highest ridership when compared to the existing lines, at 600,000 riders annually.[7] In the 2019 tender, eight of the thirteen stations were connected to other lines on the network.
In 2006, it was considered whether the two Line E ghost stations (San José vieja and Constitución) could be used as the southern point of Line F, considering they overlapped the line's trajectory. However, it was later decided that Line F would use a completely new tunnel with new stations given the frequency the line is expected to have.[8]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.